ASX Announcement – 21st August 2025
MT IDA EXPLORATION UPDATE
HIGHLIGHTS
•
Multiple work streams underway:
o Infill drilling of existing resources on granted Mining Leases
o Extensional drilling of existing resources
o Exploration drilling; and
o Water Supply Drilling
•
Four Rigs currently drilling - one Diamond and three Reverse Circulation
•
Phase 1 exploration drilling program commenced on Baldock Thrust (Dickson)
and Ballard Fault (Neptune and Pulsar). Assay results are pending
•
The Neptune and Pulsar area includes rock chip results1 of 84g/t, 14g/t and 11g/t
•
Phase 1 targets supported by historical significant intercepts or recent highgrade rock chips and well-developed artisanal workings
•
Eighteen initial high priority exploration targets have been identified
•
Interpretation of High-Resolution Drone Mag survey across the entire 26km
prospective strike is pending and expected to generate additional targets
•
Water drilling successful with three water bores installed, producing
exceptional airlift yields and likely to satisfy process plant requirements
Commenting on the drilling programs, Managing Director Paul Brennan said:
“We are a couple of weeks into our Phase 1 Exploration Program at Mt Ida, drill testing the first of 18
identified targets. We now await assay results from the laboratory which will be reported when received
and subsequently used along with the structural interpretation of the high-resolution drone mag survey to
inform follow up Phase 2 drilling,
A forth rig was added to the program in July following initial positive indications. Drilling productivity rates
are higher than anticipated which will assist favourably with news flow and project timelines.
Ballard has also completed three water production bores which delivered exceptional air lift results.
Shoring up water supply is a key de-risking activity for any project and part of Ballard’s strategy for seeking
genuine standalone scale. We will use the results of upcoming pump testing to apply for a water
abstraction licence, which will be another positive step in our goal to future proof the business”.
1
Refer ASX announcement lodged by Ballard Mining on the 22nd July 2025 for further information.
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on drilling
programs at its Mt Ida Gold Project.
Located 540km northeast of Perth, in the Goldfields region of Western Australia (Fig.1). The Mt Ida Gold
Project covers 26km of prospective greenstone belt, folded around the Copperfield Granite (Fig.3).
Figure 1 – Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
The Project includes six granted mining leases and is fully permitted for mining including an approved
Mining Proposal, Mine Closure Plan and no Native Title claims currently affect the tenements. The mining
approvals are already in place for both open pit and underground mining at the Baldock deposit, which is
the primary area of high-grade gold mineralisation. A Works Approval application for up to 1.5Mtpa
Processing Plant and Tails Storage Facility has been submitted and is currently under assessment.
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3 million
tonnes @ 3.3 g/t Au for 1.1 million ounces of contained gold 2. The Baldock deposit, which hosts 930koz @
4.1g/t2 forms the basis for near-term development studies.
A 50,000m exploration program is underway targeting highly prospective and underexplored zones along
the combined 26km strike of the Baldock Thrust and the Ballard Fault (Fig.3).
An 80,000m infill and extensional drilling program is also underway to focus on resource conversion
(inferred to indicated) and resource extensions at Baldock (Fig.2)
2
Refer to the Ballard IPO Prospectus lodged with ASIC on 30th May 2025 (as amended by the Supplementary Prospectus lodged
with ASIC and dated 17 June 2025) for further information on the MRE.
ASX: BM1
ballardmining.com.au
2
Figure 2 – Infill Drilling at Baldock
Mt Ida Exploration – Growth
The Mt Ida Gold Project has significant exploration potential in a well-endowed gold district. The Company
is undertaking an aggressive drilling campaign which includes 50,000 metres of exploration drilling.
Extensive boots on the ground exploration has been completed which has identified 18 compelling walkup drill targets (Fig. 3). These targets are supported by historical significant intercepts, recent high-grade
rock chips and well-developed artisanal workings, the majority of which have not been tested with modern
exploration methods. These 18 prospects have provided the basis for the first-pass Phase 1 exploration
program while Phase 2 will focus on follow up drilling from Phase 1 as well as additional targets identified
via the detailed structural interpretation of the high-resolution drone mag survey.
Phase 3 will focus along the Bottle creek trend which is along strike from an operating mine, hosts a strong
>3km geochemical anomaly and has never been adequately tested.
A high-resolution drone mag survey has been completed over the entire 26km prospective greenstone
belts. The survey will be interpreted by well-regarded structural geologist Dr Sarah Jones in September
2025. Dr Jones was employed by Gold Fields Limited as Chief Structural Geologist prior to establishing her
own consultancy. The structural interpretation is expected to generate additional exploration targets.
ASX: BM1
ballardmining.com.au
3
Figure 3 – Current identified exploration Prospects (yellow dots)
Phase 1 drilling at Neptune (Fig.4) has now been completed. Neptune was selected due to the high-grade
rock chip results (Fig.4) and the underexplored nature of the Ballard Fault. Sulphide mineralisation was
logged in every hole and samples have been dispatched from site to the laboratory for assaying.
ASX: BM1
ballardmining.com.au
4
Figure 4 – Ballard Fault (RHS) showing the Neptune prospect (LHS) with historical rockchip3 sampling,
Mt Ida Water Exploration - Development
Ballard has recently completed three production bores located to the north of Mt Ida (Fig.5 and Fig.6). The
intention of this drilling was to shore up water supply for a potential standalone Processing Plant. The
installation of the three production bores followed a seismic survey and aircore program to identify the
deepest part of the Paleochannel.
Airlift results of the three production bores demonstrated yields that are highly likely to support a
standalone Processing Plant. Pump testing of the three production bores is scheduled to commence in
late August. The results of the pump testing will be used to demonstrate the sustainable yield of the
production bores, and this information will be provided to DWER to apply for a water abstraction licence.
3
Refer to the Ballard IPO Prospectus lodged with ASIC on 30th May 2025 (as amended by the Supplementary Prospectus lodged
with ASIC and dated 17 June 2025) for further information on the MRE
ASX: BM1
ballardmining.com.au
5
Figure 5 – Installation of bore screen in water production bore
Figure 6 – Screen and casing being prepared for installation
-END-
ASX: BM1
ballardmining.com.au
6
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With strong balance sheet and an experienced team driving the project development, Ballard is pursuing a growth
and development strategy.
The main Baldock area of the Mt Ida Project has received full open cut and underground mining approvals with a works approval
for a 1.5Mtpa processing facility submitted to DWER and under assessment. Ballard is rapidly advancing the Mt Ida Project
through a strategic plan to increase confidence in the current MRE and also increase the global resource inventory via an
aggressive exploration program. All modifying factors will be advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a
Competent Person who is a Member of the Australasian Institute of Geoscientists (AIG). Mr. Murray has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as
a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’ (“JORC Code”). Mr. Murray is an employee of Delta Lithium Limited (ASX:DLI) which provides contract services to
Ballard and consents to the inclusion in this announcement of the matters based on his information in the form and context in which
it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms that
the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the date
of this release, except as required by applicable laws and the ASX Listing Rules.
ASX: BM1
ballardmining.com.au
7
Appendix A: April 20254 Mineral Resource Estimate
Cut off
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Deposit
Tonnes
(000s)
Indicated
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Baldock
Kestrel
Bombay
West Knell
Jupiter
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Total
2,600
4.5
365
1,570
3.6
-
-
-
940
1.6
-
-
-
496
Inferred
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Total
Grade
g/t Au
Ounces
(000s)
200
4,120
4.2
563
48
940
1.6
48
1.7
27
496
1.7
27
711
1.3
30
711
1.3
30
238
3.3
25
238
3.3
25
50
1.7
3
50
1.7
3
-
-
-
500
0.5
8
500
0.5
8
242
4.8
37
2,610
4.0
338
2,850
4.0
368
-
-
-
80
1.8
5
80
1.8
5
30
3.0
3
30
3.0
3
192
2.4
15
192
2.4
15
2,840
4.5
-
-
-
-
2,840
4.5
402
-
402
90
2.7
8
90
2.7
8
4,220
3.9
532
7,000
4.1
930
1,000
1.7
53
1,000
1.7
53
496
1.7
27
496
1.7
27
740
1.4
33
740
1.4
33
420
2.9
40
420
2.9
40
140
2.3
11
140
2.3
11
500
0.5
8
500
0.5
7,500
3.0
699
10,310
3.3
8
1,102
4
Refer to the Ballard IPO Prospectus lodged with ASIC on the 30th May 2025 (as amended by the Supplementary Prospectus lodged
with ASIC and dated 17 June 2025) for further information on the MRE
ASX: BM1
ballardmining.com.au
8
Share your feedback
Discover