Mt Ida Project Development and Early Works Update
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 07 April 2026
Project Development and Early Works Update
Multiple de-risking workstreams ongoing at fully permitted Mt Ida Project
HIGHLIGHTS
• Project Development
o Baldock Feasibility Level metallurgical studies approximately 80%
complete, overall average metallurgical recovery of +91%
o Baldock Feasibility Level geotechnical studies well advanced
o Miscellaneous License for bore field and access road approved by
DMPE
o Maiden Baldock Ore Reserve on track for completion mid-CY2026
• Early Works
o Additional Production Bores being installed
o Exploration Camp being expanded
o Tender process underway for approved public road diversion
• Corporate
o Un-audited $75M cash position at 31st
March 2026
o Final Investment Decision targeted for H1CY2027
o Bedrock Advisory Partners appointed as Debt Advisor
Ballard Managing Director Paul Brennan said:
“The Project Development workstreams and Early Works are progressing smoothly. These de-
risking activities address both technical requirements and the ability to allow a seamless
transition to construction activities on a favourable Final Investment Decision”.
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
Project Development and Early Works activities at the Mt Ida Gold Project.
Ballard is pursuing a dual stream Resource Growth and Project Development strategy and
aiming to announce a Maiden Ore Reserve at Baldock mid-year. The Company’s focus for
CY2026 is Resource Growth to deliver production uplift in addition to Baldock as well as a longer
mine life for a standalone operation.
The Mt Ida Gold Project is located 540km northeast of Perth in the Goldfields region of Western
Australia (Figure 1). The Mt Ida Gold Project covers 26km of prospective greenstone belt, folded
around the Copperfield Granite (Figure 2).
Figure 1 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
3
ASX: BM1
ballardmining.com.au
Figure 2 – Mt Ida Project
13km
Ballard
Fault
4
ASX: BM1
ballardmining.com.au
Project Development
A Maiden Ore Reserve for Baldock is scheduled for release mid-CY2026. This will be based on
the February 2026 MRE update which included 669koz @ 3.7g/t1
of Indicated material at
Baldock. The Indicated material is expected to convert to a 400-500koz Ore Reserve based on
material modifying factors including Metallurgical and Geotechnical studies as below.
Metallurgical and Process Plant Studies
Ballard is advancing metallurgical studies to a Feasibility Level of detail for the Baldock Deposit.
Metallurgical studies are 80% complete and results to date continue to demonstrate that the
orebody is amenable to a conventional CIL gold processing circuit with an overall average +91%
metallurgical recovery for both open pit and underground (Appendix B).
Process Plant studies are underway and will form the basis of the Capex/Opex estimates for the
Feasibility Study due mid-year.
The Process Plant study will also provide the deliverables that will allow Ballard to undertake an
EPC tender for the construction of the Processing Plant. This is expected to occur in H2CY2026
as the Company advances towards a Final Investment Decision (FID).
Consultants Nexmin are completing both the Metallurgical and Process Plant studies.
Geotechnical Studies
Ballard is advancing geotechnical studies to a Feasibility Level of detail for the Baldock Deposit.
Open pit geotechnical studies contemplate long term access for the underground portal
locations. The global underground parameters are based on insitu rib and sill pillars with
opportune unconsolidated waste back fill. Engineered backfill such as paste fill is not
considered.
Geotechnical investigation drilling and core logging work has been completed. Geotechnical
assessment and analysis work is well advanced.
Geotechnical studies are being undertaken by consultants Peter O'Bryan and Associates.
Additional Production Bores
Ballard has an approved water abstraction licence of 2.5 GL/yr from the Lake Raeside
Paleochannel located approximately 30km north of the Mt Ida Project location (Figure 3). The
borefield location is connected to the Project site by an approved Miscellaneous License
(L29/229) which allows for the construction of the bore field, pipeline and access road.
Ballard has previously installed three production bores at Lake Raeside to secure the water
license fromDWER. As part of ongoing de-risking for Project execution,the Company nowplans
to install an additional four production bores. This will provide the necessary number of
production bores for a sustainable 2.5 GL/yr abstraction from the paleochannel.
Aircore drilling is underway to refine the final location of the production bores (Figure 4).
Conventional dewatering during planned open pit and underground mining operations is
approved by a separate 1.2 GL/yr abstraction licence. Including the 2.5 GL/yr from the Raeside
Paleochannel the total approved water abstraction license is 3.7 GL/yr.
1
Refer to the ASX Announcement released by Ballard on the 26 February 2026 for further information
5
ASX: BM1
ballardmining.com.au
Figure 3 - Mt Ida Tenure highlighting recently approved Miscellaneous License for the bore fields
6
ASX: BM1
ballardmining.com.au
Figure 4 - Aircore drilling to refine location of Production Bores in Lake Raeside Paleochannel
Expansion of Mt Ida Exploration Camp
An additional eight rooms are being installed at the existing exploration camp (Figure 5). This
will expand the camp to thirty rooms. The additional rooms will be used by personnel
undertaking early works scopes and ultimately the contractor who will build the
accommodation village to house the construction workforce on a favourable FID.
7
ASX: BM1
ballardmining.com.au
Figure 5 - Site preparation for additional accommodation units
Mt Ida Public Road diversion
The Company is planning on undertaking a public road diversion in H2CY2026 ahead of FID
(Figure 6). This will minimise any interaction with public traffic and construction activities.
The road diversion is fully approved. Ballard has commenced a tender process for the
construction as well as engagement with local stakeholders.
Appointment of Debt Advisor
The Company is pleased to announce the appointment of Bedrock Advisory Partners (Bedrock)
to assist in the assessment and management of the debt portion of Ballard’s financing process
for the stand-alone development of the Mt Ida Gold Project.
Bedrock is an independent specialist project finance advisory firm with deep experience in
structured and project debt for natural resources developments. The Bedrock team will work
alongside the Company’s Finance Director, Mr Tim Manners, to review and assess the optimal
funding mix for the Project.
Bedrock’s leadership team has decades of natural resources finance experience with firms
such as BNP Paribas, Royal Bank of Canada and NM Rothschild & Sons.
8
ASX: BM1
ballardmining.com.au
Figure 6 - Mt Ida Public Road Diversion
9
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 12.2
million tonnes @ 3.0 g/t Au for 1.2 million ounces2
of contained gold (Inferred and Indicated).
The Baldock deposit, which hosts 1.0Moz @ 3.5 g/t2
forms the basis for initial development
opportunities at Mt Ida.
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tailings Storage Facility has been received
as well as granted 3.7 GL/yr water abstraction licences.
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Executive Director
info@ballardmining.com.au
2
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
10
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset
towards production. With current JORC compliant resources of 12.2Mt @ 3.0 g/t Au, strong balance sheet and an
experienced team driving the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area
has received full open cut and underground mining approvals with a Works Approval for up to 2.0 Mtpa Processing
Plant and Tailings Storage Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to
increase confidence in the current MRE and increase the global resource inventory via an aggressive exploration
program. All modifying factors will be advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd
Hibberd, a Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr.
Hibberd has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC
Code”). Mr. Hibberd consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
The information in this report which relates to Mineral Resources for the Baldock gold deposit at the Mt Ida Gold
Project was prepared by Michael Andrew an employee of Snowden Optiro. Mr Andrew is a Fellow of the Australasian
Institute of Mining and Metallurgy (Membership No. 111172) and has sufficient experience relevant to the style of
mineralisation, the type of deposit under consideration and to the activity undertaken to qualify as Competent
Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Andrew consents to the inclusion of the information in the release in the form and
context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously
prepared and disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated
30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the
Prospectus).
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard
management’s expectations and beliefs concerning future events as of the time of the release of this announcement.
Forward-looking and aspirational statements are necessarily subject to risks, uncertainties and other factors, some
of which are outside the control of Ballard, which could cause actual results to differ materially from such
statements. Ballard makes no undertaking to subsequently update or revise the forward looking or aspirational
statements made in this release to reflect events or circumstances after the date of this release, except as required
by applicable laws and the ASX Listing Rules.
11
ASX: BM1
ballardmining.com.au
Appendix A: Ballard Global Mineral Resource Estimate (February 2026)
Cutoff Deposit
Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Open cut
0.5g/t Au
Baldock 2,916 3.9 362 395 2.6 33 3,311 3.7 395
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Tailings - - - 500 0.5 8 500 0.5 8
Underground
1.5g/t Au
Baldock 2,658 3.6 307 2,992 3.2 304 5,651 3.4 610
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3 3 30 3 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
All
Baldock 5,574 3.7 669 3,388 3.1 337 8,962 3.5 1,006
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Tailings 500 0.5 8 500 0.5 8
Total 5,574 3.7 669 6,684 2.4 509 12,258 3.0 1,178
Notes:
• Open pit resources are reported within optimised pit shells based on A$4,500 per ounce gold price and
reported at 0.5 g/t Au cut-off grade.
• Underground resources are reported below optimised pits and constrained within mineralised domains in
optimised mineable shapes at 1.5g/t gold cut-off grade.
• All figures are rounded to reflect appropriate levels of confidence.
• Apparent differences may occur due to rounding.
12
ASX: BM1
ballardmining.com.au
Appendix B: Baldock Feasibility Study Metallurgical Recovery
The Process Design Criteria (PDC) assumes a design leach residence time for the fresh material
of 24 hours. This has meant a reduced residence time for oxide/transition, given a lower solids
concentration is required due to the viscosity. Based on this, the 12-hour recovery numbers are
used for the oxide/transition and 24-hour recovery for fresh as per the Tables below.
Au_C is calculated from the results of the leach test (gold in solution and gold in residue)
whereas Au_A is from the head assay. Given some of the variability within the head assay
results, calculated values are shown.
Table 1 – Baldock Metallurgical Recovery for Oxide/Transitional Material - assumes 12 hour recovery
Table 2 – Baldock Metallurgical Recovery for Fresh Material - assumes 24 hour recovery
A27024 BK21859 Oxide 2110 Leach 1.47 2.03 0.09 93.80 95.80
A27024 BK21860 Transitional 2110 Leach 1.94 2.12 0.10 93.30 94.50
A27024 BK22006 Transitional MNGC (2140) Leach 1.84 1.90 0.12 90.20 91.90
A27024 BK22008 Transitional MNGC (2140) Leach 1.84 1.89 0.12 91.40 92.30
A27024 BK22012 Transitional MNGC (2140) Leach 1.84 1.94 0.14 88.40 92.60
A27024 BK22016 Transitional MNGC (2140) Leach 1.84 1.94 0.08 89.30 92.40
A27024 BK22566 Transitional Lode 086 Leach 3.01 2.77 0.03 93.10 96.00
A25291 IM2078 Oxide Lode 086 Leach 4.05 4.76 0.04 94.60 97.80
A25291 IM2079 Transitional Lode 086 Leach 6.43 3.44 0.07 100.00 100.00
A25721 IM2271 Oxide MNGC (2140) Leach 2.32 2.39 0.12 94.10 95.00
A25721 IM2274 Transitional MNGC (2140) Leach 3.71 3.32 0.14 78.10 94.70
Total 2.6 0.1 91.5 94.8
Head Au_A Head Au_C Tail_Au Au 12 Au 24
Program Test ID Weathering Location Type
A27024 BK21859 Oxide 2110 Leach 1.47 2.03 0.09 93.80 95.80
A27024 BK21860 Transitional 2110 Leach 1.94 2.12 0.10 93.30 94.50
A27024 BK22006 Transitional MNGC (2140) Leach 1.84 1.90 0.12 90.20 91.90
A27024 BK22008 Transitional MNGC (2140) Leach 1.84 1.89 0.12 91.40 92.30
A27024 BK22012 Transitional MNGC (2140) Leach 1.84 1.94 0.14 88.40 92.60
A27024 BK22016 Transitional MNGC (2140) Leach 1.84 1.94 0.08 89.30 92.40
A27024 BK22566 Transitional Lode 086 Leach 3.01 2.77 0.03 93.10 96.00
A25291 IM2078 Oxide Lode 086 Leach 4.05 4.76 0.04 94.60 97.80
A25291 IM2079 Transitional Lode 086 Leach 6.43 3.44 0.07 100.00 100.00
A25721 IM2271 Oxide MNGC (2140) Leach 2.32 2.39 0.12 94.10 95.00
A25721 IM2274 Transitional MNGC (2140) Leach 3.71 3.32 0.14 78.10 94.70
Total 2.6 0.1 91.5 94.8
Head Au_A Head Au_C Tail_Au Au 12 Au 24
Program Test ID Weathering Location Type
Share your feedback