Regional Prospects showing potential for scale
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
o
ASX Announcement – 28 April 2026
New Discovery at Ayla on Ballard Fault
Ongoing strong extensional results at Golden Vale
• Discovery results from Ayla include:
o 3m at 5.2 g/t Au from 17m, and 3m at 8.5 g/t Au from 35m
o 4m at 5.2 g/t Au from 44m
o 3m at 9.3 g/t Au from 60m
o 4m at 3.6 g/t Au from 112m
• Results extend mineralisation at West Knell to 1.4km of strike
including new result at West Knell of:
o 5m at 3 g/t Au from 192m
• Further drilling underway and being accelerated
• Ongoing extensional results from Golden Vale include:
o 7m at 1.0 g/t Au from 13m
o 4m at 9.3 g/t Au from 55m
o 10m at 0.9 g/t Au from 73m
o 16m at 0.9 g/t Au from 78m
o 11m at 0.9 g/t Au from 107m
o 6m at 3.3 g/t Au from 174m
• Drilling extends mineralisation at Golden Vale by 650 metres to
southwest and west and remains open along strike and at depth
• West Knell/Ayla and Golden Vale are at northern and southern
ends of the Ballard Fault respectively, within 7km of the 1.0 Moz1
@ 3.5g/t Baldock deposit on the Baldock Shear
• These results start to suggest that the entire 13kms of the Ballard
Fault zone may be mineralised
• Results show potential to add significant scale with identification
of new shallow mineralised zones
1
Refer to the ASX Announcement released by Ballard on the 26 February 2026 for further information
2
ASX: BM1M1
ballardmining.com.au
Commenting on Ballard’s active Growth program, Managing Director Paul Brennan said:
“The latest regional assay results from the Ballard Fault zone at Mt Ida continue to highlight the
potential for multiple open pit ore sources to complement the 3.5g/t high-grade cornerstone
>1.0 Moz2
Baldock deposit. The results lift our confidence in the fertility of the 13km-long
Baldock Fault zone which along with the 13km-long Baldock Thrust zone continue to reveal
significant gold mineralisation on both sides of the Copperfield Granite.
“We are accelerating our drilling at the regional prospects. This will allow us to test the growing
potential of these satellite prospects and define their potential for a meaningful contribution to
Mt Ida’s future production potential.
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
recent drilling at its regional prospects at the Mt Ida Gold Project.
Ballard is pursuing a dual stream Resource Growth and Project Development strategy. The
Company’s focus for CY2026 is Resource Growth to deliver production uplift to the >1 Moz at
3.5 g/t gold Baldock Mineral Resource Estimate (MRE)2
, as well as identifying regional satellite
feed sources to support a production uplift and longer mine life for a future standalone
operation.
The Mt Ida Gold Project is located 540km northeast of Perth in the Goldfields region of
Western Australia (Figure 1). The Mt Ida Gold Project covers 26km of prospective Greenstone
belt, folded around the Copperfield Granite (Figure 2).
Figure 1 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
2
Refer to the ASX Announcement released by Ballard on the 26 February 2026 for further information
3
ASX: BM1M1
ballardmining.com.au
Figure 2 – Mt Ida Project showing Baldock and existing regional gold resources at regional prospects. All
results from this announcement are from the Ballard Fault Zone only.
13km
Ballard
Fault
4
ASX: BM1M1
ballardmining.com.au
Ballard Fault – Exploration Delivering Scale Potential
The extensive mineralisation identified at the regional prospects along the 13-kilometre Ballard
Fault zone has the potential to grow substantially. The Ballard Fault is on the eastern side of the
Copperfield Granite, with the Baldock Thrust on the Western side.
Drilling has identified significant mineralisation at Kestrel (53koz3
MRE), West Knell (40koz3
MRE) and Golden Vale (27koz3
MRE). Drilling has also identified mineralisation at the Ayla,
Europa, Pulsar and Neptune prospects. This highlights the potential linkages between West
Knell, Ayla, Europa, Pulsar and Neptune, suggesting that the entire length of the Ballard Fault
zone may be mineralised (Figure 3).
The Company currently has two Reverse Circulation (RC) rigs at the Ballard Fault zone focused
on extensional drilling to rapidly grow near surface Mineral Resources, a strategy which is
generating excellent results.
During March and April 2026, regional resource growth drilling has been carried out along the
Ballard Fault zone at Golden Vale and West Knell (Ayla and Europa prospects). Drilling
consisted of 56 drill holes for 6,160 metres. Drill results for Golden Vale, Ayla and West Knell
are discussed below.
Figure 3. Long section showing the current resources and prospects along the Ballard Fault zone. Note horizontal scale is 2
vertical scale (Refer to Figure 2 for a plan view).
3
Refer to the ASX Announcement released by Ballard on the 26 February 2026 for further information
5
ASX: BM1M1
ballardmining.com.au
New Gold Discovery at Ayla on the Ballard Fault
The Company is pleased to announce that drilling along the Ballard Fault south of West Knell
and North of Neptune has identified multiple shallow high-grade intervals at the Alya Prospect.
Themineralisationis clustered at thesouthern endof drilling and is open to thesouth potentially
linking to mineralisation at the Pulsar prospect 1km to the South. Mineralisation occurs as a
series of north-south moderately east dipping shear zones comprised of quartz and sulphides
within an alteration zone of silica, biotite and chlorite. The host rock is anorthosite, a
plagioclase rich differentiated gabbro sill. Better results include:
• 3m at 5.2 g/t gold from 17m and 3m at 8.5 g/t gold from 35m in BMEX233
• 4m at 5.2 g/t gold from 44m in BMEX234
• 3m at 9.3 g/t gold from 60m in BMEX237
• 4m at 3.6 g/t gold from 112m in BMEX235
The better results above are concentrated in one area and are shallow which demonstrates
potential for open pit mining. Mineralisation is open to the South and the Company is currently
undertaking further drilling. The full assay results table is set out in Appendix B.
New gold intersections extend West Knell towards Europa-Ayla
The West Knell deposit currently has an Inferred resource of 420kt at 2.9 g/t gold containing
40koz2
of gold that occurs as a series of stacked north-south moderately east dipping shear
zones comprised of quartz and sulphides within an alteration zone of silica, biotite and chlorite.
The host rock is anorthosite, a plagioclase rich differentiated gabbro sill.
The style of mineralisation is strikingly similar to Baldock. The parallel Europa and Ayla
prospects are around 500 metres south of West Knell and consist of similar mineralisation also
hosted in anorthosite.
Recent drilling has extended the West Knell mineralisation south towards the Ayla-Europa
mineralisation and is still open to the south. Better results from this drilling include:
• 1m at 1.7 g/t from 51 metres in WKEX079
• 4m at 1.2 g/t gold from 144 metres in WKEX072
• 5m at 3.0 g/t gold from 192 metres in WKEX070
• 1m at 1.8 g/t from 214 metres in WKEX069
Further drilling has been planned between West Knell and Alya- Europa to test potential
linkages. The full assay results table is set out in Appendix B.
6
ASX: BM1M1
ballardmining.com.au
Figure 4. Drilling plan showing recent drilling results at West Knell (Europa and Ayla prospects)
7
ASX: BM1M1
ballardmining.com.au
Figure 5. Cross section showing high grade interval at the southern end of Ayla
Figure 6. Cross section showing high grade interval at the southern end of Ayla
8
ASX: BM1M1
ballardmining.com.au
Figure 7. Cross section showing high grade interval at the southern end of West Knell.
Multiple shallow wide gold intersections expand Golden Vale deposit
The Golden Vale deposit has an existing Inferred resource of 27koz4
and has previously
produced ~13koz5
(62kt at 6 g/t gold) from historical mining. Mineralisation in the pit occurs as
a series of shallow southeast dipping quartz lodes in basalticamphiboliteimmediately adjacent
to the contact with the Ballard Fault zone.
The Company has now completed three phases of drilling at Golden Vale in 2026 with the initial
phase identifying substantial mineralisation6
. Follow-up phase two drilling has also identified
widespread mineralisation that is reported below. Phase three drilling has just been completed,
and samples are currently at the laboratory awaiting assay. Phase four drilling has commenced.
Phase two drilling at the Golden Vale prospect has identified widespread shallow gold
mineralisation that extends the mineralised envelope 650 metres southwest and west and has
potential for open pit mining. Better results include:
• 1m at 2.2 g/t gold from 10m in GVEX057
• 7m at 1.1 g/t gold from 13m in GVEX064
• 1m at 5.2 g/t gold from 19m in GVEX062
• 2m at 3.1 g/t gold from 23m in GVEX046
• 2m at 1.2 g/t gold from 23m in GVEX067
• 1m at 2.3 g/t gold from 46m in GVEX046
• 1m at 3.5 g/t gold from 50m in GVEX046
4
Refer to the ASX Announcement released by Ballard on 26 February 2026 for further information
5
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the
Supplementary Prospectus lodged with ASIC and dated 17 June 2025) for further information
6
Refer to the ASX Announcement released by Ballard on 11 March 2026 for further information
9
ASX: BM1M1
ballardmining.com.au
• 7m at 0.6 g/t gold from 52m in GVEX045
• 4m at 9.3 g/t gold from 55m in GVEX046
• 10m at 0.9 g/t gold from 73m in GVEX045
• 16m at 0.9 g/t gold from 78m in GVEX051
• 1m at 5.5 g/t gold from 94m in GVEX052
• 3m at 1.4 g/t gold from 100m in GVEX052
• 11m at 0.9 g/t gold from 107m in GVEX052
• 6m at 3.3 g/t gold from 174m in GVEX060
The Company is encouraged by the recent drilling and has scheduled additional drilling
programs to extend the deposit to the southwest and to the north. The full assay results table is
set out in Appendix B.
Figure 8. Golden Vale geological plan showing recent drilling and significant assay intersections
10
ASX: BM1M1
ballardmining.com.au
Figure 9. Cross section showing historical open pit, current Mineral Resource of 27koz and the drill intersection of 6m
at 3.3 g/t gold in GVEX060, 150 metres down dip of the current Mineral Resource.
Figure 10. Cross section showing multiple shallow wide drill intersections that extend the mineralised envelop 650
metres southwest of the current Mineral Resource.
11
ASX: BM1M1
ballardmining.com.au
Figure 11. Cross section showing multiple shallow wide drill intersections that extend the mineralised envelop 650
metres southwest of the current Mineral Resource.
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 12.2
million tonnes @ 3.0 g/t Au for 1.2 million ounces7
of contained gold (Inferred and Indicated).
The Baldock deposit, which hosts 1.0Moz @ 3.5 g/t7
, forms the basis for initial development
opportunities at Mt Ida.
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tailings Storage Facility has been received
as well as granted 3.7 GL/yr water abstraction licences.
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Executive Director
info@ballardmining.com.au
7
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
12
ASX: BM1M1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset
towards production. With current JORC compliant resources of 12.2Mt @ 3.0 g/t Au, strong balance sheet and an
experienced team driving the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area
has received full open cut and underground mining approvals with a Works Approval for up to 2.0 Mtpa Processing
Plant and Tailings Storage Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to
increase confidence in the current MRE and increase the global resource inventory via an aggressive exploration
program. All modifying factors will be advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd
Hibberd, a Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr.
Hibberd has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC
Code”). Mr. Hibberd consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
The information in this report which relates to Mineral Resources for the Baldock gold deposit at the Mt Ida Gold
Project was prepared by Michael Andrew an employee of Snowden Optiro. Mr Andrew is a Fellow of the Australasian
Institute of Mining and Metallurgy (Membership No. 111172) and has sufficient experience relevant to the style of
mineralisation, the type of deposit under consideration and to the activity undertaken to qualify as Competent
Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Andrew consents to the inclusion of the information in the release in the form and
context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously
prepared and disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated
30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the
Prospectus).
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard
management’s expectations and beliefs concerning future events as of the time of the release of this announcement.
Forward-looking and aspirational statements are necessarily subject to risks, uncertainties and other factors, some
of which are outside the control of Ballard, which could cause actual results to differ materially from such
statements. Ballard makes no undertaking to subsequently update or revise the forward looking or aspirational
statements made in this release to reflect events or circumstances after the date of this release, except as required
by applicable laws and the ASX Listing Rules.
13
ASX: BM1M1
ballardmining.com.au
Appendix A: Ballard Global Mineral Resource Estimate (February 2026)
Cutoff Deposit
Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Open cut
0.5g/t Au
Baldock 2,916 3.9 362 395 2.6 33 3,311 3.7 395
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Tailings - - - 500 0.5 8 500 0.5 8
Underground
1.5g/t Au
Baldock 2,658 3.6 307 2,992 3.2 304 5,651 3.4 610
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3 3 30 3 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
All
Baldock 5,574 3.7 669 3,388 3.1 337 8,962 3.5 1,006
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Tailings 500 0.5 8 500 0.5 8
Total 5,574 3.7 669 6,684 2.4 509 12,258 3.0 1,178
Notes:
• Open pit resources are reported within optimised pit shells based on A$4,500 per ounce gold price and
reported at 0.5 g/t Au cut-off grade.
• Underground resources are reported below optimised pits and constrained within mineralised domains in
optimised mineable shapes at 1.5g/t gold cut-off grade.
• All figures are rounded to reflect appropriate levels of confidence.
• Apparent differences may occur due to rounding.
14
ASX: BM1M1
ballardmining.com.au
Appendix B: Recent Project Data
Appendix B1: Recent Exploration Significant Intercepts reported in this announcement
* Intersections reported about 0.5 g/t with a maximum of 2 metres of internal dilution
* NSI values indicate that No Significant Intersection was identified
Hole ID From To Length Gold g/t Lode
BMEX237 60 63 3 9.3 Ayla
BMEX233 35 38 3 8.5 Ayla
BMEX231 44 48 4 5.4 Ayla
BMEX233 17 20 3 5.2 Ayla
BMEX235 112 116 4 3.3 Ayla
BMEX234 47 49 2 1.6 Ayla
GVEX046 55 59 4 9.3 Golden Vale
GVEX052 94 95 1 5.5 Golden Vale
GVEX062 19 20 1 5.2 Golden Vale
GVEX046 50 51 1 3.5 Golden Vale
GVEX060 174 180 6 3.3 Golden Vale
GVEX046 23 25 2 3.1 Golden Vale
GVEX046 46 47 1 2.3 Golden Vale
GVEX057 10 11 1 2.2 Golden Vale
GVEX052 100 103 3 1.4 Golden Vale
GVEX067 23 25 2 1.2 Golden Vale
GVEX064 13 20 7 1.1 Golden Vale
GVEX052 63 64 1 1.0 Golden Vale
GVEX045 73 83 10 0.9 Golden Vale
GVEX052 107 118 11 0.9 Golden Vale
GVEX051 78 94 16 0.9 Golden Vale
GVEX053 98 99 1 0.8 Golden Vale
GVEX053 102 103 1 0.7 Golden Vale
GVEX045 52 59 7 0.6 Golden Vale
GVEX055 23 24 1 0.6 Golden Vale
GVEX061 33 34 1 0.6 Golden Vale
GVEX052 87 88 1 0.6 Golden Vale
WKEX070 192 197 5 3.0 West Knell
WKEX079 51 52 1 2.0 West Knell
WKEX069 214 215 1 1.8 West Knell
WKEX072 144 148 4 1.2 West Knell
WKEX076 55 56 1 1.2 West Knell
WKEX078 87 88 1 1.0 West Knell
WKEX073 59 60 1 0.8 West Knell
WKEX072 53 54 1 0.7 West Knell
WKEX069 223 224 1 0.6 West Knell
15
ASX: BM1M1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
WKEX070 104 105 1 0.6 West Knell
BMEX222 NSI Ayla
BMEX223 NSI Ayla
BMEX225 NSI Ayla
BMEX226 NSI Ayla
BMEX227 NSI Ayla
BMEX228 NSI Ayla
BMEX229 NSI Ayla
BMEX230 NSI Ayla
BMEX232 NSI Ayla
EUEX013 NSI Europa
EUEX014 NSI Europa
GVEX054 NSI Golden Vale
GVEX056 NSI Golden Vale
GVEX058 NSI Golden Vale
GVEX059 NSI Golden Vale
GVEX063 NSI Golden Vale
WKEX077 NSI West Knell
WKEX080 NSI West Knell
16
ASX: BM1M1
ballardmining.com.au
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth East North RL Azi Dip
ASEX001 95 251,004 6,781,860 455 53 -60
ASEX002 149 250,971 6,781,837 455 56 -61
ASEX003 101 250,897 6,781,997 455 53 -59
ASEX004 161 250,863 6,781,962 455 52 -61
ASEX005 131 250,826 6,782,067 456 53 -60
ASEX006 167 250,791 6,782,032 456 52 -60
ASEX007 143 251,229 6,781,478 456 52 -60
ASEX008 89 251,337 6,781,339 459 53 -60
BMEX222 101 257,296 6,782,993 447 270 -56
BMEX223 83 257,236 6,783,043 446 272 -56
BMEX225 77 257,293 6,783,041 446 270 -55
BMEX226 83 257,266 6,783,087 446 271 -56
BMEX227 65 257,200 6,783,135 445 272 -55
BMEX228 83 257,250 6,783,135 446 272 -55
BMEX229 95 257,341 6,782,800 448 275 -56
BMEX230 101 257,345 6,782,758 448 272 -56
BMEX231 83 257,319 6,782,704 449 271 -56
BMEX232 101 257,369 6,782,704 449 272 -56
BMEX233 83 257,292 6,782,653 450 269 -55
BMEX234 83 257,334 6,782,656 449 271 -56
BMEX235 143 257,397 6,782,661 450 271 -55
BMEX236 65 257,292 6,782,606 451 266 -55
BMEX237 83 257,336 6,782,616 451 271 -56
EUEX013 77 257,432 6,782,837 448 270 -56
EUEX014 125 257,484 6,782,833 449 274 -55
GVEX045 89 257,920 6,775,716 470 271 -61
GVEX046 101 257,977 6,775,715 471 274 -60
GVEX047 149 258,094 6,775,719 469 272 -60
GVEX048 77 257,926 6,775,688 470 270 -61
GVEX049 113 257,986 6,775,688 470 271 -61
GVEX050 137 258,041 6,775,689 469 267 -61
GVEX051 95 257,938 6,775,666 470 269 -60
GVEX052 137 257,991 6,775,662 470 269 -60
GVEX053 119 258,044 6,775,663 469 270 -61
GVEX054 101 257,780 6,775,632 468 302 -51
GVEX055 101 257,773 6,775,596 468 300 -50
GVEX056 53 257,727 6,775,623 467 303 -61
GVEX057 47 257,702 6,775,572 469 330 -61
GVEX058 47 257,661 6,775,512 470 331 -61
GVEX059 89 257,692 6,775,472 471 332 -51
GVEX060 197 258,268 6,776,417 462 270 -56
17
ASX: BM1M1
ballardmining.com.au
Hole ID Depth East North RL Azi Dip
GVEX061 191 258,268 6,776,417 462 272 -56
GVEX062 53 257,302 6,775,164 474 330 -60
GVEX063 125 257,324 6,775,127 473 332 -55
GVEX064 59 257,261 6,775,149 475 330 -60
GVEX065 149 257,286 6,775,107 474 333 -56
GVEX066 53 257,286 6,775,107 474 334 -60
GVEX067 113 257,231 6,775,090 476 331 -56
WKEX069 245 257,390 6,783,420 445 272 -61
WKEX070 215 257,387 6,783,458 445 273 -61
WKEX072 161 256,989 6,783,373 444 269 -60
WKEX073 119 256,940 6,783,350 444 270 -60
WKEX076 143 256,920 6,783,304 445 272 -60
WKEX077 77 256,870 6,783,304 445 268 -60
WKEX078 167 256,994 6,783,274 445 272 -61
WKEX079 113 256,901 6,783,256 445 269 -60
WKEX080 71 256,851 6,783,256 445 270 -60
18
ASX: BM1M1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Gold Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
19
ASX: BM1M1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling, TopDrill & PXD, RC
drilling utilised an Explorac 220RC rig, T66
Schramm RC Rig with a 143 mm face sampling
hammer bit, DD drilling was completed by a truck
mounted Sandvik DE820 and a KWL 1500 and has
been a combination of PQ2, HQ2 and NQ2
diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
20
ASX: BM1M1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS dried, crushed and pulverised to 80%
passing 75 microns with 500g of material utilised
for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
• The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
• Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
• Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
• Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
21
ASX: BM1M1
ballardmining.com.au
Criteria Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
For geophysical tools, spectrometers,
handheld XRF instruments
Share your feedback
Discover