Infill drilling results at Baldock delivers more high-grade
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 18th
November 2025
INFILL DRILLING AT BALDOCK
DELIVERS MORE HIGH-GRADE GOLD
PHASE 1 PROGRAM 83% COMPLETE
HIGHLIGHTS
• Resource Conversion (Infill) drilling continues to improve the drill density and
quality of the existing high-grade Baldock gold Mineral Resource Estimate
(930koz @ 4.1 g/t1
Indicated & Inferred)
• Recent assay results returned include:
o 3 metres at 64.2 g/t gold from 277 metres in DFS056C
o 1.7 metres at 71.0 g/t gold from 398 metres in DFS685
o 2 metres at 30.0 g/t gold from 249 metres in DFS421
o 8 metres at 5.7 g/t gold from 126 metres in DFS634
o 3 metres at 10.3 g/t gold from 228 metres in DFS149
o 5 metres at 5.5 g/t gold from 17 metres in DFS484
o 0.6 metres at 40.5 g/t gold from 406 metres in DFS698
o 4 metres at 5.3 g/t gold from 201 metres in DFS408
• Phase 1 Infill program 83% complete with 407 holes and 71,311 metres drilled,
on track for completion in early December
• Feasibility Level Geotechnical and Metallurgical program in progress
Managing Director, Paul Brennan commenting on the most recent results noted:
“The planned 80,000 metre Phase 1 Resource Conversion drilling program at Baldock will be
completed in December. The results received to date have been confirmatory and in line with
expectations. The increased drilling density (20m by 20m) will allow a substantial portion of the
Inferred resource to be upgraded to an Indicated resource and support a maiden Ore Reserve
planned for mid CY2026.
The site team has completed detailed geotechnical logging and collected extensive
metallurgical samples which are being evaluated to provide the key modifying factors required
for Mineral Reserves to be quantified.”
1
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
the Resource conversion (Infill) drilling program at its Mt Ida Gold Project located 540km
northeast of Perth in the Goldfields region of Western Australia (Figure 14). The Mt Ida Gold
Project covers 26km of prospective greenstone belt, folded around the Copperfield Granite
(Figure 15).
Three drill rigs, comprising two Reverse Circulation (RC) and one Diamond, are currently
undertaking the Infill drilling program (20m by 20m) at Baldock, with the diamond drilling
intersecting high-grade gold intervals in recent drill holes (Figure 1).
Figure 1 - Mineralised Interval from infill drill hole DFS685 – 1.7 metres at 71 g/t gold from the 1090 lode consisting of
massive pyrite-chalcopyrite in a silica matrix, and mineralised interval DFS056C – 3 metres at 64.25 g/t gold
Phase 1 80,000m Infill drilling program nears completion
The Company is on track to complete its initial Infill drilling program at Baldock by December.
The site exploration team has completed over 70,000 metres of geological logging, sampling
and data interpretation to significantly improve the detailed geological model which will enable
a substantial part of the current resource to be upgraded to an Indicated resource.
The site team has also conducted detailed geotechnical logging (4,336 metres) of both current
and historical drilling to allow our consultants (Peter O’Bryan and Associates) to develop a
robust geotechnical model for the Baldock open pit and underground deposits, an essential
modifying factor required to report mineral Reserves.
A large amount of mineralised sample from RC and Diamond drilling (53 tonnes) has been
collected, both for the current metallurgical test work program (605 kg) and future detailed test
work programs designed to refine the processing circuit design.
New Infill drilling results
This release of Infill assay results from the Baldock gold deposit includes 95 drill holes for
18,835 metres that have been drilled at the northern, central and southern parts of the Baldock
zone (Figures 3-13). The full assay results table is set out in Appendix B, and outlines which
results are included within the current Mineral Resource Estimate (MRE), and those which fall
outside. Phase one Infill drilling (20m by 20m) is 83% complete with under 8,000 metres
remaining to drill. This programshouldbe completed in December. Extensional drilling will then
commence at Baldock which is designed to add additional resources to the Baldock MRE.
3
ASX: BM1
ballardmining.com.au
Baldock Development Strategy
The Company is targeting an initial mineral Reserve of 400,000-500,000 ounces based on the
Phase 1 Infill drilling program currently being completed at Baldock. To support this Reserve the
Company is undertaking extensive metallurgical test work and detailedgeotechnical modelling,
both tasks are on track to be completed in the first quarter of calendar 2026 (Figure 2). This will
provide the basis for an initial 5 – 6 Year mine Reserve at Baldock.
Figure 2 - FY26 Baldock Work Streams
Resource Extension and Regional Exploration Drilling Programs
The Company is currently conducting regional exploration along the Baldock shear (Pluto,
Corvus, Milky Way) immediately north of Baldock and along the Ballard Fault zone (Galaxy,
Sandstone, and Neptune). Drilling focus will then shift to resource development drilling at
Kestrel, West Knell and Baldock. Further information will be released in upcoming
announcements.
4
ASX: BM1
ballardmining.com.au
Figure 3 - Baldock infill drill hole locations reported in this ASX release overlaid on gold mineral resource
outlines
5
ASX: BM1
ballardmining.com.au
Figure 4 - Detailed drilling location plan (Baldock) showing
significant gold intersections reported in this
announcement
Figure 5 - Detailed drilling location plan (Baldock) showing
significant gold intersections reported in this
announcement
Figure 6 - Detailed drilling location plan (Baldock)
showing significant gold intersections reported in this
announcement
Figure 7 - Detailed drilling location plan (Nebula) showing
significant gold intersections reported in this announcement
6
ASX: BM1
ballardmining.com.au
Figure 8 - Cross section 1 showing multiple new assay intersections including 1.7 metres at 71g/t gold in DFS685 in
the Baldock 1090 lode
7
ASX: BM1
ballardmining.com.au
Figure 9 - Cross section 2 showing multiple new assay intersections including 1 metre at 40.5g/t gold in DFS698
in the Baldock 1090 lode
8
ASX: BM1
ballardmining.com.au
Figure 10 - Cross section 3 of new assay intersection of 2 metres at 30 g/t gold in in DFS421 in the Baldock 1089
lode
9
ASX: BM1
ballardmining.com.au
Figure 11 - Cross section 4 of new assay intersection of 3 metres at 64.3 g/t gold, in DFS056C at Baldock within the
1100 lode
10
ASX: BM1
ballardmining.com.au
Figure 12 – Cross section 5 of new assay intersection of 3 metres at 10.3 g/t gold, in DFS149 at Baldock within the
2112 lode
11
ASX: BM1
ballardmining.com.au
Figure 13 – Cross section 6 of new assay intersection of 5 metres at 5.5 g/t gold, in DFS149 at Nebula within the
2180 lode
12
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3
million tonnes @3.3g/t Aufor 1.1 million ounces2
of contained gold. The Baldock deposit, which
hosts 930koz @ 4.1 g/t2
, forms the basis for future development opportunities at Mt Ida.
Figure 14 Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region
A 130,000m drill program is underway across the Project, targeting an initial 80,000 metres of
Infill drilling at Baldock and 50,000 metre regional exploration program. The regional
exploration program is testing highly prospective and underexplored zones along the 26km
strike of both the Baldock Thrust and the Ballard Fault (Figure 15).
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan, 1.2 GL/yr water abstraction license and Native
Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tails Storage Facility has been received and
an additional 2.5 GL/yr water abstraction license is pending.
2
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
13
ASX: BM1
ballardmining.com.au
Figure 15 – Mt Ida identified Au prospects with planned Phase 1 Infill and Phase 1 exploration programs
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
14
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open pit and underground mining approvals with a Works Approval for a 2.0 Mtpa Processing Plant and Tailings Storage
Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the current MRE and
increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
15
ASX: BM1
ballardmining.com.au
Appendix A: April 20253
Mineral Resource Estimate
3
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Baldock 2,600 4.5 365 1,570 3.6 200 4,120 4.2 563
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Mt Ida Tailings - - - 500 0.5 8 500 0.5 8
Baldock 242 4.8 37 2,610 4.0 338 2,850 4.0 368
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3.0 3 30 3.0 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
Baldock 2,840 4.5 402 4,220 3.9 532 7,000 4.1 930
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Mt Ida Tailings 500 0.5 8 500 0.5 8
Total 2,840 4.5 402 7,500 3.0 699 10,310 3.3 1,102
Total
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Cut off Deposit
Indicated Inferred
16
ASX: BM1
ballardmining.com.au
Appendix B: Recent Project Data
Appendix B1: Recent Significant Intercepts reported in this announcement
* Intersections reported about 0.5 g/t with a maximum of 2 metres of internal dilution
* NSI values indicate that Not Significant Intersection was identified
Hole ID From To Length Gold g/t Lode
DFS685 398.4 400.1 1.7 71 1090
DFS056C 277.0 279.5 2.5 64.3 1100
DFS698 406.7 407.3 0.6 40.5 1090
DFS421 249.0 251.0 2 30 1089
DFS149 228.0 231.0 3 10.3 2112
DFS317 193.0 194.0 1 7.59 2140
DFS668 212.0 214.0 2 5.98 1090
DFS634 126.0 134.0 8 5.73 2160
DFS398 247.0 249.0 2 5.47 1090
DFS484 17.0 22.0 5 5.47 2180
DFS419 207.0 209.0 2 5.35 1090
DFS408 201.0 205.0 4 5.29 1090
DFS538 153.0 155.0 2 4.54 2140
DFS683 358.6 359.7 1.1 3.68 1090
DFS406 287.0 288.0 1 3.44 1090
DFS339 163.0 165.0 2 3.31 2143
DFS408 169.0 170.0 1 3.29 1090
DFS339 123.0 124.0 1 3.29 2141
DFS590 157.0 159.0 2 3.19 2160
DFS539 129.0 131.0 2 2.49 2150
DFS418 188.0 189.0 1 2.21 1090
DFS533 114.0 116.0 2 2.19 2150
DFS417 168.0 169.0 1 1.79 1090
DFS331 165.0 166.0 1 1.76 2140
DFS335 226.0 228.0 2 1.5 2143
DFS419 223.0 224.0 1 1.38 1089
DFS339 171.0 172.0 1 1.38 2140
DFS548 44.0 46.0 2 1.26 2140
DFS431 189.0 190.0 1 1.22 1090
DFS420 226.0 227.0 1 1.11 1090
DFS331 95.0 96.0 1 1.1 2141
DFS413 200.0 201.0 1 1.07 1090
DFS621 80.0 83.0 3 0.78 2200
DFS151 268.0 269.0 1 0.71 2110
DFS485 42.0 43.0 1 0.56 2180
DFS481 54.0 55.0 1 0.55 2180
17
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS654 199.0 201.0 2 3.05 Pit
DFS569 20.0 22.0 2 2.8 Pit
DFS607 139.0 141.0 2 2.79 Pit
DFS639 123.0 126.0 3 2.31 Pit
DFS404 166.0 167.0 1 2.1 Pit
DFS408 182.0 183.0 1 2.07 Pit
DFS317 198.0 198.6 0.6 2.02 Pit
DFS358 119.5 123.7 4.2 1.89 Pit
DFS549 23.0 26.0 3 1.84 Pit
DFS547 16.0 18.0 2 1.82 Pit
DFS615 118.0 122.0 4 1.75 Pit
DFS157 16.0 17.0 1 1.66 Pit
DFS551 60.0 61.0 1 1.63 Pit
DFS486 3.0 4.0 1 1.58 Pit
DFS465 110.6 112.5 1.9 1.54 Pit
DFS395 170.0 171.0 1 1.45 Pit
DFS547 24.0 29.0 5 1.37 Pit
DFS535 52.0 53.0 1 1.26 Pit
DFS541 32.0 33.0 1 1.24 Pit
DFS541 29.0 30.0 1 1.22 Pit
DFS411 141.0 142.0 1 1.19 Pit
DFS408 189.0 190.0 1 1.16 Pit
DFS418 64.0 65.0 1 1.12 Pit
DFS417 36.0 38.0 2 1.03 Pit
DFS545 23.0 24.0 1 1 Pit
DFS317 32.0 33.0 1 0.97 Pit
DFS654 135.0 136.0 1 0.96 Pit
DFS538 120.0 121.0 1 0.92 Pit
DFS539 162.0 164.0 2 0.91 Pit
DFS412 175.0 179.0 4 0.91 Pit
DFS402 111.0 112.0 1 0.89 Pit
DFS668 195.0 196.0 1 0.86 Pit
DFS401 122.0 123.0 1 0.81 Pit
DFS410 157.0 158.0 1 0.79 Pit
DFS149 179.0 180.0 1 0.72 Pit
DFS537 99.0 100.0 1 0.72 Pit
DFS458 87.0 88.0 1 0.7 Pit
DFS534 44.0 46.0 2 0.7 Pit
DFS538 18.0 23.0 5 0.69 Pit
DFS477 - 1.0 1 0.67 Pit
DFS431 121.0 122.0 1 0.64 Pit
18
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS540 66.0 67.0 1 0.63 Pit
DFS550 35.0 36.0 1 0.62 Pit
DFS409 73.0 74.0 1 0.59 Pit
DFS465 131.3 131.7 0.3 0.58 Pit
DFS534 38.0 39.0 1 0.58 Pit
DFS151 64.0 65.0 1 0.54 Pit
DFS398 177.0 178.0 1 0.53 Pit
DFS149 127.0 128.0 1 0.52 Pit
DFS407 170.0 171.0 1 0.52 Pit
DFS358 100.7 101.0 0.3 0.52 Pit
DFS056C 61.2 61.5 0.3 0.5 Pit
DFS432 206.0 213.0 7 2.73 Outside MRE
DFS685 357.0 358.5 1.6 2.66 Outside MRE
DFS619 220.0 225.0 5 2.59 Outside MRE
DFS569 301.0 304.0 3 2.48 Outside MRE
DFS685 387.2 388.1 0.9 2.44 Outside MRE
DFS403 210.0 212.0 2 2.43 Outside MRE
DFS056C 331.2 332.1 0.9 1.94 Outside MRE
DFS409 225.0 226.0 1 1.88 Outside MRE
DFS665A 315.0 317.0 2 1.79 Outside MRE
DFS404 228.0 229.0 1 1.7 Outside MRE
DFS698 430.7 431.6 0.9 1.47 Outside MRE
DFS665A 434.1 434.8 0.7 1.3 Outside MRE
DFS401 219.0 222.0 3 1.24 Outside MRE
DFS396 281.0 282.0 1 1.23 Outside MRE
DFS698 327.0 329.1 2.1 1.2 Outside MRE
DFS151 266.0 267.0 1 1.17 Outside MRE
DFS414 220.0 221.0 1 1.15 Outside MRE
DFS665A 413.9 414.4 0.5 1.14 Outside MRE
DFS150 256.0 257.0 1 1.13 Outside MRE
DFS680 312.0 318.0 6 0.96 Outside MRE
DFS335 239.0 240.0 1 0.9 Outside MRE
DFS151 272.0 273.0 1 0.88 Outside MRE
DFS680 253.0 254.0 1 0.87 Outside MRE
DFS406 291.0 292.0 1 0.8 Outside MRE
DFS395 255.0 256.0 1 0.78 Outside MRE
DFS685 318.0 319.0 1 0.71 Outside MRE
DFS406 249.0 250.0 1 0.7 Outside MRE
DFS056C 280.2 280.5 0.4 0.68 Outside MRE
DFS668 203.0 204.0 1 0.68 Outside MRE
DFS685 410.3 410.8 0.5 0.67 Outside MRE
19
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS151 262.0 263.0 1 0.66 Outside MRE
DFS569 366.0 367.0 1 0.6 Outside MRE
DFS415 232.0 233.0 1 0.57 Outside MRE
DFS654 224.0 225.0 1 0.56 Outside MRE
DFS405 NSI
DFS405A NSI
DFS476 NSI
DFS478 NSI
DFS479 NSI
DFS480 NSI
DFS482 NSI
DFS486 NSI
DFS487 NSI
DFS488 NSI
DFS491 NSI
DFS530 NSI
DFS531 NSI
DFS532 NSI
DFS536 NSI
DFS542 NSI
DFS543 NSI
DFS544 NSI
DFS617 NSI
DFS641 NSI
DFS652 NSI
DFS670 NSI
DFS683 NSI
DFS695 NSI
20
ASX: BM1
ballardmining.com.au
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth East North RL Azi Dip
DFS056C 348 253,189 6,778,535 473 56 - 60
DFS149 234 252,919 6,778,841 470 43 - 89
DFS150 270 252,905 6,778,836 471 55 - 60
DFS151 312 252,894 6,778,827 471 54 - 60
DFS157 211 252,912 6,778,867 470 54 - 61
DFS317 249 252,643 6,779,293 469 55 - 60
DFS331 198 252,627 6,779,355 468 56 - 60
DFS335 312 252,569 6,779,314 469 53 - 61
DFS339 210 252,598 6,779,359 468 56 - 60
DFS358 192 252,597 6,779,453 467 57 - 59
DFS395 276 253,398 6,778,104 475 54 - 60
DFS396 294 253,381 6,778,093 475 53 - 60
DFS398 270 253,386 6,778,121 474 55 - 60
DFS400 234 253,415 6,778,165 474 55 - 60
DFS401 246 253,398 6,778,154 474 55 - 60
DFS402 288 253,359 6,778,126 475 54 - 60
DFS403 214 253,403 6,778,182 474 55 - 59
DFS404 246 253,384 6,778,168 474 55 - 60
DFS405 168 253,367 6,778,156 475 57 - 60
DFS405A 264 253,367 6,778,156 475 55 - 58
DFS406 306 253,334 6,778,133 475 54 - 59
DFS407 180 253,434 6,778,227 473 56 - 60
DFS408 210 253,419 6,778,217 473 55 - 61
DFS409 246 253,379 6,778,189 474 57 - 60
DFS410 162 253,447 6,778,264 473 54 - 60
DFS411 174 253,430 6,778,251 473 55 - 60
DFS412 198 253,412 6,778,239 473 54 - 60
DFS413 210 253,396 6,778,227 473 55 - 60
DFS414 228 253,380 6,778,217 474 55 - 60
DFS415 246 253,364 6,778,206 474 55 - 60
DFS417 186 253,407 6,778,258 473 54 - 60
DFS418 210 253,391 6,778,247 473 53 - 60
DFS419 228 253,375 6,778,235 474 52 - 61
DFS420 240 253,358 6,778,224 474 54 - 61
DFS421 264 253,343 6,778,212 474 54 - 60
DFS431 200 253,341 6,778,285 474 54 - 60
DFS432 234 253,327 6,778,275 474 54 - 60
DFS458 420 253,225 6,778,301 473 54 - 60
DFS465 192 252,597 6,779,480 468 54 - 61
DFS476 24 252,434 6,780,026 464 56 - 61
DFS477 45 252,423 6,780,018 464 56 - 60
21
ASX: BM1
ballardmining.com.au
Hole ID Depth East North RL Azi Dip
DFS478 72 252,413 6,780,011 464 52 - 60
DFS479 24 252,420 6,780,040 464 56 - 61
DFS480 48 252,409 6,780,033 464 53 - 60
DFS481 71 252,400 6,780,026 464 55 - 60
DFS482 72 252,391 6,780,044 464 55 - 60
DFS484 30 252,394 6,780,071 464 54 - 61
DFS485 52 252,383 6,780,063 464 56 - 61
DFS486 31 252,382 6,780,087 464 56 - 61
DFS487 55 252,371 6,780,079 464 57 - 61
DFS488 84 252,361 6,780,072 464 57 - 60
DFS491 84 252,372 6,780,055 464 55 - 60
DFS530 92 252,563 6,779,617 466 56 - 60
DFS531 113 252,550 6,779,608 466 58 - 60
DFS532 137 252,533 6,779,596 466 53 - 60
DFS533 155 252,517 6,779,585 467 54 - 59
DFS534 77 252,575 6,779,650 466 54 - 59
DFS535 77 252,559 6,779,639 466 55 - 59
DFS536 107 252,542 6,779,627 466 55 - 59
DFS537 125 252,527 6,779,618 466 54 - 60
DFS538 161 252,510 6,779,605 467 54 - 60
DFS539 179 252,494 6,779,593 467 57 - 59
DFS540 197 252,479 6,779,584 467 52 - 58
DFS541 59 252,568 6,779,670 466 50 - 60
DFS542 83 252,553 6,779,659 466 54 - 60
DFS543 101 252,538 6,779,648 466 53 - 60
DFS544 119 252,535 6,779,647 466 53 - 60
DFS545 179 252,503 6,779,624 466 54 - 59
DFS546 203 252,486 6,779,613 467 55 - 58
DFS547 47 252,559 6,779,690 466 54 - 60
DFS548 71 252,540 6,779,676 466 53 - 60
DFS549 41 252,554 6,779,710 466 57 - 60
DFS550 65 252,537 6,779,698 466 55 - 60
DFS551 95 252,519 6,779,685 466 54 - 60
DFS569 372 252,646 6,779,051 471 55 - 58
DFS590 269 252,624 6,779,084 471 54 - 57
DFS607 360 252,848 6,778,677 473 54 - 59
DFS613 257 252,811 6,778,675 473 55 - 61
DFS615 270 252,840 6,778,724 472 54 - 55
DFS617 204 252,823 6,778,713 472 54 - 58
DFS619 264 252,787 6,778,688 473 51 - 58
DFS621 197 252,747 6,778,660 473 52 - 57
DFS634 300 252,834 6,778,777 472 53 - 58
22
ASX: BM1
ballardmining.com.au
Hole ID Depth East North RL Azi Dip
DFS639 180 252,697 6,778,679 473 52 - 58
DFS641 144 252,658 6,778,651 474 60 - 56
DFS652 210 253,136 6,778,522 473 55 - 60
DFS654 270 253,116 6,778,508 472 54 - 59
DFS665A 460 253,076 6,778,528 473 53 - 57
DFS668 372 253,125 6,778,588 471 52 - 57
DFS670 210 253,097 6,778,568 472 50 - 57
DFS680 336 253,340 6,778,089 475 55 - 60
DFS683 395 253,309 6,778,067 476 57 - 61
DFS685 420 253,274 6,778,042 476 54 - 60
DFS695 366 253,295 6,778,106 475 56 - 59
DFS698 435 253,244 6,778,070 475 55 - 60
23
ASX: BM1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Gold Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered to be
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
24
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling & PXD, RC drilling
utilised an Explorac 220RC rig, T66 Schramm RC
Rig with a 143 mm face sampling hammer bit, DD
drilling was completed by a truck mounted
Sandvik DE820 and a KWL 1500 and has been a
combination of PQ2, HQ2 and NQ2 diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
in full
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
25
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• Ballard have recently amended the Photon
methodology to carry out analysis on Pulverised
material rather than crushed material, studies
suggest the results are comparable.
• RC duplicate field samples were c
Share your feedback
Discover