October 2025 Exploration Target
Released
Released
Announcement PDF
ballardmining.com.au
2 9 O c t o b e r 2 0 2 5
Accelerating Exploration
at the Fully Permitted
Mt Ida Gold Project
Not for release to US wire services or distribution in the United States
ballardmining.com.au
The following notices and disclaimers apply to this Presentation ("Presentation") and you are therefore advised to
read this carefully before reading or making any other use of this Presentation or any information contained in this
Presentation.
This Presentation is dated 29 October 2025 and has been prepared by the Board and management of Ballard
Mining Limited ("Ballard" or the "Company").
SUMMARY INFORMATION ONLY
The information in this Presentation is summary information only and is current as at the date of this Presentation
(unless otherwise indicated), and the information in this Presentation remains subject to change without notice. The
information in this Presentation is general in nature and does not purport to be accurate nor complete, nor does it
contain all of the information that an investor may require in evaluating a possible investment in Ballard, nor does it
contain all the information which would be required in a disclosure document or prospectus prepared in accordance
with the requirements of the Corporations Act 2001 (Cth) ("Corporations Act") or other legislation. It has been
prepared by Ballard with due care but no representation or warranty, express or implied, is provided in relation to the
accuracy, reliability, fairness or completeness of the information, opinions or conclusions in this Presentation by
Ballard or any other party involved in its preparation, except as required by law.
Reliance should not be placed on information or opinions contained in this Presentation and, Ballard does not have
any obligation to finalise, correct or update the contents of this Presentation, except as required by law.
This Presentation should be read in conjunction with Ballard's other periodic and continuous disclosure
announcements lodged with the ASX, which are available at www.asx.com.au.
FORWARD LOOKING STATEMENTS
This Presentation may contain forward-looking statements regarding the Company and its subsidiaries (including its
projects). Forward-looking statements may in some cases be identified by terminology such as “may”, “will”, “could”,
“should”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict”, “potential” or “continue”, the negative
of such terms or other comparable terminology. These forward-looking statements are only predictions. These
forward-looking statements reflect various assumptions by or on behalf of Ballard. Accordingly, these statements are
subject to significant business, economic and competitive uncertainties and contingencies associated with the
mining industry which may be beyond the control of Ballard which could cause actual results or trends to differ
materially including, but not limited to, price and currency fluctuations, geotechnical factors, drilling and production
results, development progress, operating results, reserve estimates, legislative, fiscal and regulatory developments,
economic and financial market conditions in various countries, approvals and cost estimates, environmental risks,
ability to meet funding requirements, share price volatility. Accordingly, there can be no assurance that such
statements and projections will be realised.
Actual values, results or events may be materially different to those expressed or implied in this Presentation. Given
these uncertainties, recipients are cautioned not to place reliance on forward-looking statements. Any forward-
looking statement in this Presentation is given as at the date of this Presentation. Subject to any continuing
obligations under applicable law and the ASX Listing Rules, Ballard does not undertake any obligation to update or
revise any information or any of the forward-looking statements in this Presentation or any changes in events,
conditions or circumstances on which any such forward-looking statement is based.
NOT FINANCIAL PRODUCT ADVICE
This Presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial
product or investment advice, financial, legal, tax, accounting or other advice, or a recommendation to acquire any
securities of Ballard. It has been prepared without taking into account the objectives, financial or tax situation or
particular needs of any individual. Ballard is not licensed to provide financial product advice in respect of an
investment in securities or otherwise. Each investor must make its own independent assessment of Ballard before
acquiring any securities in the Company.
PAST PERFORMANCE
Any information regarding past performance included in this Presentation is given for illustrative purposes only and
should not be relied upon as (and is not) an indication of Ballard's views, or that of any other party involved in its
preparation, on Ballard's future performance or condition or prospects.
NOT AN OFFER
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law
or any other law and will not be lodged with the Australian Securities and Investments Commission. This
Presentation is for information purposes only and is not an invitation, offer or recommendation with respect to the
subscription, purchase or sale of any security in Ballard, or any other financial products or securities, in any place or
jurisdiction.
This Presentation has been prepared for publication in Australia and may not be released to US wire services or
distributed in the United States. This Presentation does not constitute an offer to sell, or a solicitation of an offer to
buy, securities in the United States or any other jurisdiction where it would be illegal. The distribution of this
Presentation in the United States and elsewhere outside Australia may be restricted by law. Persons who come into
possession of this Presentation should observe any such restrictions as any non-compliance could contravene
applicable.
2
DISCLAIMER
ballardmining.com.au
NO LIABILITY
The information contained in this Presentation has been prepared in good faith by Ballard. However, no guarantee,
representation or warranty expressed or implied is or will be made by any person (such as Ballard or its affiliates,
directors, officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness,
completeness or adequacy of any statements, estimates, options, conclusions or other information contained in this
Presentation, except as required by law.
To the maximum extent permitted by law, Ballard and its affiliates, directors, officers, employees, associates,
advisers and agents each expressly disclaims any and all liability, including, without limitation, any liability arising out
of fault or negligence, for any loss arising from the use of or reliance on information contained in this Presentation
including representations or warranties or in relation to the accuracy or completeness of the information, statements,
opinions, forecasts, reports or other matters, express or implied, contained in, arising out of or derived from, or for
omissions from, this Presentation including, without limitation, any financial information, production targets, financial
forecasts, estimates or projections and any other information derived therefrom. Statements in this Presentation are
made only as of the date of this Presentation unless otherwise stated and the information in this Presentation
remains subject to change without notice. No responsibility or liability is assumed by Ballard or any of its affiliates,
directors, officers, employees, associates, advisers or agents for updating information in this Presentation or to
inform any recipient of any new or more accurate information or any errors or omissions of which Ballard or any of its
affiliates, directors, officers, employees, associates, advisers or agents may become aware, except as required by
law.
INVESTMENT RISK
An investment in Ballard is subject to investment and other known and unknown risks, some of which are beyond
the control of Ballard. Those risks and uncertainties include factors and risks specific to Ballard such as (without
limitation) the status of exploration and mining tenements and applications and the risks associated with the non-
grant or expiry of those tenements and applications, liquidity risk, risks associated with the exploration or
developmental stage of projects, funding risks, operational risks, changes to government fiscal, monetary and
regulatory policies, the impact of actions of governments, the potential difficulties in enforcing agreements and
protecting assets, alterations to resource estimates and the imprecise nature of resource and reserve statements,
any circumstances adversely affecting areas in which Ballard operates, fluctuations in the production, volume and
price of commodities, any imposition of significant obligations under environmental regulations, fluctuations in
exchange rates, the fluctuating industry and commodity cycles, the impact of inflation on operating and development
costs, taxation, regulatory issues and changes in law and accounting policies, the adverse impact of wars, terrorism,
political, economic or natural disasters, the impact of changes to interest rates, loss of key personnel and delays in
obtaining or inability to obtain any necessary government and regulatory approvals, insurance and occupational
health and safety. Further information regarding the risks associated with an investment in Ballard are disclosed in
Ballard’s IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30
May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (“IPO
Prospectus”). Ballard does not guarantee any particular rate of return or the performance of Ballard, nor does it
guarantee the repayment of capital from Ballard or any particular tax treatment.
MINERAL RESOURCE ESTIMATE (MRE)
Information in this Presentation that relates to exploration results, the data and geological interpretation used as the
basis of the mineral resources was reported by Ballard in the IPO Prospectus and for which the consent of the
Competent Person Mr Shane Murray was obtained. Ballard confirms it is not aware of any new information or data
that materially affects the information included in the IPO Prospectus.
Information in this Presentation that relates to the gold mineral resource estimate at the Mt Ida Project was reported
by Ballard in the IPO Prospectus, and for which the consent of the Competent Person Mr Michael Andrew was
obtained. Ballard confirms it is not aware of any new information or data that materially affects the information
included in the IPO Prospectus and that all material assumptions and technical parameters underpinning the mineral
resource estimate in the IPO Prospectus continue to apply and have not materially changed.
JORC CODE DIFFERS FROM REPORTING REQUIREMENTS IN OTHER COUNTRIES
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia
comply with the JORC Code. Investors outside Australia should note that while ore reserve and mineral resource
estimates of the Company in this presentation comply with the JORC Code, they may not comply with the relevant
guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of
Disclosure for Mineral Projects) of the Canadian Securities Administrators or (ii) Item 1300 of Regulation S-K, which
governs disclosure of mineral reserves in registration statements filed with the US Securities and Exchange
Commission. Information contained in this Presentation describing mineral deposits may not be comparable to
similar information made public by companies subject to the reporting and disclosure requirements of other
countries. You should not assume that quantities reported as “resources” in this Presentation will be converted to
reserves under the JORC Code or any other reporting regime or that the Company will be able to legally and
economically extract them.
FINANCIAL INFORMATION
All dollar amounts are in Australian dollars unless otherwise indicated.
EFFECT OF ROUNDING
The figures in this Presentation may be subject to rounding. Accordingly, the actual calculation of these figures may
differ from the figures set out in this presentation.
DISCLAIMER
3
ballardmining.com.au
Ballard is aiming to become a significant gold producer through
the exploration and development of the Mt Ida Gold Project
4
Corporate Summary
• Successful IPO and demerger from Delta Lithium in July
2025
• $40M Pro-forma cash after $20.6M placement
• Experienced Board and Management Team
Mineral Resource
• 10Mt @ 3.3g/t Au for 1.1Moz Au1, including the Baldock
Deposit of 930Koz @ 4.1 g/t Au1
• Located in the heart of the goldfields, ~200 kms NW of
Kalgoorlie and in close proximity to existing mines and
~15Mtpa of processing capacity
Upcoming Catalysts
• Ongoing infill and exploration results
• Updated MRE’s
• Baldock Feasibility Study and Maiden Ore Reserve in mid-
2026
Camp-Scale Exploration Potential
• Announcing the October 2025 Exploration Target2
• 26km of underexplored prospective shear zones
• 18 initial walk up targets now complemented by 35 target
“zones” from recent geophysical studies
Baldock is Fully Permitted
• Fully permitted to commence both open-cut and
underground mining at the Baldock Deposit
• Fully permitted for a 2Mtpa Processing Plant and Tailings
Storage Facility with 2.5 GL/yr water license pending
• Granted Mining Leases, no current Native Title claims
Project Strategy (per IPO Use of Funds)
• 80,000 metres of infill drilling (20m x 20m) at Baldock to
deliver Maiden Ore Reserve by mid-2026
• 50,000 metres of regional exploration drilling over under-
explored 26km of mineralised trends
INVESTMENT HIGHLIGHTS
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated
17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
2. Readers should note that a Cautionary Statement applies to the disclosure of the October 2025 Exploration Target. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 9 of this
Presentation for further information regarding the October 2025 Exploration Target
ballardmining.com.au
INFRASTUCTURE RICH & DEEP OREBODIES PROXIMAL
Sources: S&P Capital IQ, ASX Filings,
Company Websites, Argonaut Equity
Research Estimates
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
Vault Minerals (ASX:VAU)
5.3mtpa (7.5 Mtpa)
2.8MOz at 0.7 g/t Au
Genesis Minerals (ASX: GMD)
1.84Mtpa (+3.5 Mtpa)
2.7MOz at 2.7 g/t Au
Ora Banda Mining (ASX: OBM)
1.2Mtpa (3.0 Mtpa)
0.23MOz at 2.4g/t Au
Aurenne Group (Private)
1.5Mtpa (1.8 Mtpa)
Unknown reserve/grade
5
ballardmining.com.au
Ownership Structure %
Delta (2 Year ASX imposed escrow)2 41.3%
Aurenne Group [or nominee] (6 month vol. escrow) 9.6%
Hancock Prospecting (6 month vol. escrow)3
5.6%
Mineral Resources (6 month vol. escrow)3
5.1%
Board and Management (Fully Diluted) 5.5%
6
CORPORATE SUMMARY
Broker Coverage
1. Based on ASX closing price as at 22/10/25
2. Delta Lithium is subject to a 24 month escrow from the date Ballard shares were quoted on the ASX.
3. In-specie shares transferred to Hancock Prospecting and Mineral Resources are subject to six months voluntary escrow from the date of issue and further six months orderly market restriction.
Corporate Structure Pro - Forma
Shares on Issue (including restricted shares) 378 Million
Performance Rights & Unlisted Options 22 Million
Share Price1
$0.49
Market Capitalisation (undiluted) $ 185 Million
Cash at 30th September $ 40 Million
Board and Key Management Personnel (notable previous roles)
Chair Simon Lill (De Grey)
Managing Director Paul Brennan (Saracen, Calidus)
Executive Director Tim Manners (Ramelius, Wildcat)
Non-Executive Director James Croser (Spectrum, Delta)
Non-Executive Director Stuart Mathews (Gold Fields)
Company Secretary Loren Falconer (MACA, PLS)
Geology Manager Todd Hibberd (Newmont)
ballardmining.com.au
FY26 FY27 FY28
Sep Q Dec Q Mar Q Jun Q Sep Q Dec Q Mar Q Jun Q Sep Q Dec Q Mar Q Jun Q
Development
BALDOCK INFILL DRILLING
BALDOCK GEOTECH & MET
PROCESS PLANT (Capex/Opex)
BALDOCK MRE UPDATE (Resource Conversion)
BALDOCK MAIDEN RESERVE (Initial 400-500koz)
Growth
GROWTH DRILLING (incl Baldock extensions)
MRE UPDATE (incl Baldock Reserve)
RESOURCE CONVERSION DRILLING (INFILL)
Exploration Target1
MRE
IPO
IPO
IPO
IPO
IPO
Accelerated IPO work streams + October 2025 Exploration Target1
GROW AND DEVELOP
7
Use of Placement
Use of Placement
1. Readers should note that a Cautionary Statement applies to the disclosure of the October 2025 Exploration Target. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 9 of this
Presentation for further information regarding the October 2025 Exploration Target
ballardmining.com.au
October 2025
Exploration Target
ballardmining.com.au
Statement of Exploration Target at Mt Ida
IMPORTANT: You must read the following before continuing.
The October 2025 Exploration Target reported for the Mt Ida Gold Project excludes and is in addition
to the Mt Ida Mineral Resource Estimate1 of 10.3Mt @ 3.3 g/t gold for 1.1Moz.
The October 2025 Exploration Target based on current2 and historical2 exploration results is
reported as:
11.8 – 14.6Mt grading 2.6 – 3.9 g/t gold:
Cautionary Statement:
The potential quantity and grade of the October 2025 Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource within the October 2025
Exploration Target, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The October 2025 Exploration Target has been prepared and reported by Ballard, in
accordance with the Australasian Code for the Reporting of Exploration Results, Mineral Resources,
and Ore Reserves, 2012 Edition (“JORC Code”).
9
OCTOBER 2025 EXPLORATION TARGET BASIS
The October 2025 Exploration Target presented are based on the following information and assumptions:
• The existing Mt Ida Mineral Resource estimate of 10.3 Mt at 3.3 g/t containing 1.1 Moz1 of gold, noting
that the October 2025 Exploration Target is separate from and in addition to this Mineral Resource
Estimate.
• Geological information indicating that mineralisation persists at depth below existing deposits as
confirmed by deeper drilling.
• Encouraging gold assay results returned from exploration drilling over several km of strike and to a
depth of ~120m.
• A gold grade range of the October 2025 Exploration Target calculated from the significant number of
drill intercepts returned from the existing drilling database.
• The volume range (tonnages) of the October 2025 Exploration Target defined by modelling existing
deposits to depth and along strike where drilling shows mineralisation.
• October 2025 Exploration Target ounces output ranges rounded to reflect the conceptual nature of
the calculations.
Tonnes (Mt)
Low
Tonnes
(Mt) High
Grade
(g/t Au)
Low
Grade
(g/t Au)
High
11.8 14.6 2.6 3.9
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
2. Refer to Appendix B for a table of all previous drill results
COMPETENT PERSON STATEMENT
Information in this Presentation that relates to October 2025 Exploration Target is based on, and fairly represents, information and supporting documentation prepared by Todd Hibberd, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Hibberd has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code. Mr Hibberd is an employee of the Company and has
performance incentives associated with the successful development of the Company’s Mt Ida Project. Mr Hibberd consents to the inclusion in this Presentation of the matters based on his
information in the form and context in which it appears.
ballardmining.com.au
October 2025 Exploration Target1
10
TARGET AREAS
Lower Range
(tonnes &
grade)
Upper Range
(tonnes &
grade)
Refer to
Slide …
Baldock*
- Panel 1 (300mbs to 750mbs) 4.3Mt @ 3g/t 5.0Mt @ 5g/t Slide 13
- Panel 2 (750mbs to 1,000mbs) 2.0Mt @ 3g/t 2.1Mt @ 5g/t Slide 13
Timoni 0.9Mt @ 3g/t 1.1Mt @ 4g/t Slide 14
Kestrel & West Knell 1.0Mt @ 2.5g/t 1.4Mt @ 3g/t Slide 15
Ballard Fault (various regional prospects) 1.5Mt @ 2g/t 2.0Mt @ 2.5g/t Slide 15
Baldock Thrust (various regional prospects) 2.1Mt @ 2g/t 3.0Mt @ 2.5g/t Slide 15
Exploration Target^ 11.8Mt @ 2.6g/t 14.6Mt @ 3.9g/t
*mbs = Metres Below Surface
^ rounding may cause small computationaldifferences
Exploration Target by Major Area within Mt Ida
Cautionary Statement: The potential quantity and grade of the October 2025 Exploration Target is conceptual in nature. There has been
insufficient exploration to estimate a Mineral Resource within the October 2025 Exploration Target, and it is uncertain if further exploration
will result in the estimation of a Mineral Resource. The October 2025Exploration Target has been prepared and reported by Ballard, in
accordance with the JORC Code.
1. Readers should note that a Cautionary Statement applies to the disclosure of the October 2025 Exploration Target. Please refer to the
“Statement of Exploration Target at Mt Ida” slide on page 9 of this Presentation for further information regarding the October 2025
Exploration Target.
ballardmining.com.au
Structural Targeting
11
• Mt Ida considered analogous to the +10Moz Agnew
gold camp (150km north) by renowned Structural
Geologist Dr Sarah Jones
• Orogenic orebodies typically“plumb deep”eg
Genesis’ Gwalia Underground +1.5km1 deep mine
and Ora Banda’s Riverina Deeps +1km2 deep
mineralized system, both located within ~80km
• Agnew and Ora Banda are located on same
greenstone belt
• Key target zone is the hanging wall (upper contact) of
the major shear that wraps around Copperfield
granite dome
• Structural Review identified so many discrete targets
that areas were grouped into target zones (blue
zones)
• Planned work:
o Geophysics to inform deeper drilling
o Regional AC drilling Constellation Prospect
(Bottle Creek trend)
o EM work (both downhole and surface)
Camp Scale potential at Mt Ida
1. Refer to the ASX Announcement lodged by Genesis (ASX:GMD) on the 1st September 2025 “Corporate
Presentation - Long Ore” for further informationregarding the depth of the Gwalia Mine
1. Refer to the ASX Announcement lodged by Ora Banda (ASX:OBM) on the 23rd October 2025
“Outstanding Drill Results at Little Gem and Riverina” for further informationregarding the depth of the
mineralization system at Riverina Deeps
ballardmining.com.au
Key Growth Area – Baldock
12
Dip Plane View (looking down)
Baldock MRE1 (30 June): 930,000 oz
Current length: 3,500m
Drill depth average: 350 m
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
ballardmining.com.au
Key Growth Area – Baldock
13 1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
Cautionary Statement: The potential quantity and grade of the October 2025 Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the
October 2025 Exploration Target, and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The October 2025 Exploration Target has been prepared and reported by Ballard, in
accordance with the JORC Code. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 9 of this Presentation for further information regarding the October 2025Exploration Target.
ballardmining.com.au
Key Growth Area – Timoni
14
Exploration Target to 470m depth:
0.9Mt @ 3g/t – 1.1Mt @ 4g/t
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
Historical Production1: 265koz @ 16g/t gold
Cautionary Statement: The potential quantity and grade of the October 2025 Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the
October 2025 Exploration Target, and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The October 2025 Exploration Target has been prepared and reported by Ballard, in
accordance with the JORC Code. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 9 of this Presentation for further information regarding the October 2025 Exploration Target.
ballardmining.com.au
Other Growth Areas – Phase 1 Targets (in progress)
15
Cautionary Statement: The potential quantity and grade of the October 2025 Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the
October 2025 Exploration Target, and it is uncertain if further exploration will result in the estimation of a Mineral Resource. The October 2025 Exploration Target has been prepared and reported by Ballard, in
accordance with the JORC Code. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 9 of this Presentation for further information regarding the October 2025 Exploration Target.
ballardmining.com.au
• First Pass Phase 1
drill program
completed at
Neptune
• Neptune identified
due to present of
historical UG
workings and HG
rock chips
• 23m @ 1.8 g/t from
21m depth1
• Phase 1 drilling
used to inform
comprehensive
Phase 2 drill
program (Diamond
and RC)
16
350m
Neptune Prospect
historic workings
NEPTUNE EXAMPLE → Phase 1 & Phase 2
1. Refer to the ASX Announcement lodged by Ballard on the 15th September 2025 for further information
Discovery at Neptune1 demonstrates regional potential
ballardmining.com.au
350m
Neptune Prospect
historic workings
NEPTUNE EXAMPLE
Neptune Phase 2
Phase 1 drilling informs next
phase at Neptune
• Drill Pad preparation complete
• Commence drilling early
November
• 40m x 40m spacing, targeting
Maiden MRE March Quarter
(Inferred)
17
Preparing for Phase 2 Drilling at Neptune
ballardmining.com.au
18
INVESTMENT HIGHLIGHTS
2 CAMP SCALE EXPLORATION POTENTIAL → additional drilling to advance Exploration Target1
3 DUAL STREAM STRATEGY → Target +10 Year Plan from initial ~6 year Reserve + exploration success
1 LOCATION → Heart of the Goldfields, +15Mtpa Processing Capacity and deep orebodies proximal
4 FULLY PERMITTED.
5 PROVEN BOARD AND MANAGEMENT TEAM → Relevant recent experience
6 MULTIPLE UPCOMING CATALYSTS → Ongoing drilling results, MRE Updates, Maiden Ore Reserve
1. Readers should note that a Cautionary Statement applies to the disclosure of the October 2025 Exploration Target. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 9 of this
Presentation for further information regarding the October 2025 Exploration Target
ballardmining.com.au
19
Appendix A
Mineral Resource
Estimate
ballardmining.com.au
A MINERAL RESOURCE ESTIMATE
– APRIL 20251
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Baldock 2,600 4.5 365 1,570 3.6 200 4,120 4.2 563
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Mt Ida Tailings - - - 500 0.5 8 500 0.5 8
Baldock 242 4.8 37 2,610 4.0 338 2,850 4.0 368
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3.0 3 30 3.0 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
Baldock 2,840 4.5 402 4,220 3.9 532 7,000 4.1 930
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Mt Ida Tailings 500 0.5 8 500 0.5 8
Total 2,840 4.5 402 7,500 3.0 699 10,310 3.3 1,102
Total
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Cut off Deposit
Indicated Inferred
20 1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer for further informationon the MRE
ballardmining.com.au
21
Appendix B
Previous ASX
Announcements
ballardmining.com.au
B PREVIOUS ASX ANNOUNCEMENTS
This announcement contains information extracted from ASX market announcements reported in accordance with the
JORC Code. Further details (including JORC Code reporting tables where applicable) of exploration results referred to in
this announceme
Share your feedback
Discover