ASX Announcement – 22nd
April 2026
March 2026 Quarterly Activities Report
HIGHLIGHTS
• Global Mt Ida MRE increases to 12.3 Mt @ 3.0 g/t Au for 1.2 Moz gold
• Updated Baldock Mineral Resource Estimate (MRE) increases Indicated and
Inferred resources to 9.0 Mt @ 3.5 g/t Au for 1.0 Moz gold
o Indicated resources increased 66% to 5.6 Mt @ 3.7 g/t Au for 669 koz gold
• Final Baldock Infill assays received, better results from final batch included:
o 6m at 18.6 g/t Au from 226m (DFS120)
o 4m at 8.4 g/t Au from 181m (DFS122)
o 2m at 14.6 g/t Au from 202m (DFS592)
• 220,000m resource growth drilling program underway for CY2026 with 7 drill rigs
(3 Diamond Drill (DD), 3 Reverse Circulation (RC) and one air-core) on site
• Initial extensional drilling below the current Baldock resource supports CY2026
resource growth, notable results include 3m at 5.0 g/t Au from 103m and 10m at
3.2 g/t Au from 416m and 2m at 9.0 g/t Au from 448m (EMEX019) (central Baldock)
• Significant new regional drill results include^:
o 6m at 5.6 g/t Au from 131m (BMEX199) at Neptune
o 2m at 41.5 g/t Au from 156m (BMEX208) at Neptune
o 10m at 6.4 g/t Au from 28m (WKEX053) at West Knell
o 3m at 5.7 g/t Au from 77m (WKEX058) at West Knell
o 5m at 10.0 g/t Au from 83m (WKEX071) at West Knell
• Successful $61.0 million Placement funds Ballard to Final Investment Decision
in H1 CY2027, supporting accelerated drilling and investment into early works at
Mt Ida with a robust cash balance of $75.6 million at 31 March 2026
^ Refer to various ASX releases as listed later in this report
2
ASX: BM1
ballardmining.com.au
Commenting on the quarterly activities report, Managing Director Paul Brennan said:
“Ballard has continued to progressively advance its dual stream Resource Growth and Project
Development strategy for the Mt Ida Gold Project during a productive March 2026 quarter.
“The Company delivered Resource Growth at the cornerstone Baldock deposit following 86,000m of Phase
1 infill drilling. This infill lifted the MRE for the high-grade Baldock Gold Deposit, which now sits at over 1
Moz of contained gold. Notably, the updated MRE contains approximately 669koz at 3.7g/t in the higher
confidence Indicated category, providing a robust foundation for the delivery of a Maiden Ore Reserve.
“The expansive 220,000m CY2026 Resource Growth drilling program across Mt Ida has already showed
promise in both further extending the Baldock deposit outside the updated resource and advancing
potential open pit satellite feed sources for uplift in the production profile in addition to Baldock.
“Project Development workstreams are continuing, both on the ground and through various study
workstreams. The accommodation camp is expanding while additional production water bores are being
installed. Geotechnical and metallurgical studies are being completed to a feasibility level of detail.
“The Company is well funded to deliver our strategy with $75.6 million at the end of the March quarter
following a $61 million placement in January. The June quarter promises to be constructive with seven drill
rigs on site and the further progress of development studies for Mt Ida.”
Ballard Mining (ASX:BM1) (Ballard or the Company) is pleased to present its Quarterly Activities Report
and Appendix 5B, for the quarter ending 31 March 2026.
Mt Ida Gold Project Overview
Located 540km northeast of Perth, in the Goldfields region of Western Australia (Figure 1). The Mt Ida Gold
Project (Mt Ida or the Project) covers 26km of prospective greenstone belt, folded around the Copperfield
Granite.
The Project includes six granted mining leases and is fully permitted for mining, including an approved
Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit. Ballard’s activities at the
Baldock deposit form the basis for initial development opportunities at Mt Ida. Mining approvals are in
place for both open pit and underground mining at Baldock.
A Works Approval for up to 2.0 Mtpa Processing and Tails Storage Facility has been received as well as a
granted 3.7 GL/yr water abstraction license.
3
ASX: BM1
ballardmining.com.au
Figure 1 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
Mt Ida hosts a JORC 2012-compliant Mineral Resource Estimate (MRE) totalling 12.3 Mt @ 3.0 g/t Au for
1.2 Moz contained gold. The cornerstone Baldock deposit hosts an MRE of 1.0 Moz @ 3.5 g/t Au,
representing over 85% of total Mt Ida gold ounces (Figure 2).
Ballard is pursuing a dual stream Resource Growth and Project Development Strategy. Baldock Ore
Reserve workstreams are ongoing and the Company’s focus for the next 12 months is Resource Growth
(extensional and regional) to add scale (Figure 3).
Figure 2 - Baldock Existing Resource and Planned CY2026 Drilling Program
- 1,000 2,000 3,000 4,000
760 mbs
680 mbs
600 mbs
520 mbs
440 mbs
360 mbs
280 mbs
200 mbs
120 mbs
40 mbs
BALDOCK FEB 2026 MRE
OUNCES PER VERTICAL METRE
4
ASX: BM1
ballardmining.com.au
Figure 3 - Mineral Resources at the Mt Ida gold project
5
ASX: BM1
ballardmining.com.au
Mt Ida Resource Growth
Baldock Gold Deposit – Final Phase 1 Infill Drilling Results
In February 2026, Ballard released the final assay results from the Phase 1 infill drilling program which was
completed in December 2025 for a total 86,000m drilled. This batch of results consisted of 33 drill holes
for 8,662m drilled at the northern, central and southern parts of Baldock.
The most significant results from the final batch of drill results included:
• 6m at 18.6 g/t Au from 226m (DFS120)
• 4m at 8.4 g/t Au from 181m (DFS122)
• 2m at 14.6 g/t Au from 202m (DFS592)
Additional broad, high grade infill results reported prior to the current quarter included:
• 4m at 7.4 g/t Au from 207m (DFS008)
• 4m at 32.7 g/t Au from 233m (DFS066B)
• 5m at 6.3 g/t Au from 246m (DFS123)
• 6m at 3.6 g/t Au from 250m (DFS059)
• 7m at 16.8 g/t Au from 268m (DFS058)
• 7m at 4.9 g/t Au from 276m (DFS124)
These results continue to demonstrate the presence of multiple high-grade gold lodes within the Baldock
system, with mineralisation intersected over a broad range of depths and positions within the deposit.
Mineral Resource Update
On 26 February 2026, Ballard released an update to the Baldock gold MRE based on the results of the 2025
Phase 1 infill drilling program.
This drilling has consistently confirmed the original scale and tenor of the Baldock deposit and has
successfully achieved its objective of converting Inferred resources to Indicated resources with the aim of
supporting delivery of a maiden Ore Reserve estimate.
Following the Baldock MRE update, Ballard’s Global Mineral Resource Estimate increased to 12.3 Mt at
3.0 g/t Au containing 1.2 Moz gold.
The Baldock Mineral Resource Estimate increased to 9.0 Mt at 3.5 g/t Au containing 1.0 Moz gold, which
is contained within the Global MRE.
Importantly the indicated portion of the Baldock MRE, which is used to inform Ore Reserves increased
66% to 5.6 Mt @ 3.7 g/t Au for 669 koz gold.
The updated Baldock MRE is outlined in Table 1 below, with the Ballard Global MRE shown in Appendix A.
6
ASX: BM1
ballardmining.com.au
Table 1: Baldock Mineral Resource Estimate (February 2026)
Location Classification Oxidation Tonnes (Mt) Grade (g/t) Gold (koz)
Open Pit
0.5 g/t cut-off
Indicated
Oxide 0.2 2.4 12
Trans 0.5 2.7 42
Fresh 2.3 4.2 307
Total 2.9 3.9 362
Inferred
Oxide 0.0 2.0 2
Trans 0.1 2.4 4
Fresh 0.3 2.7 27
Total 0.4 2.6 33
Total 3.3 3.7 394
Underground
1.5 g/t cut-off
Indicated
Fresh
2.7 3.6 307
Inferred 3.0 3.2 304
Total 5.7 3.4 610
Combined
Indicated 5.6 3.7 669
Inferred 3.4 3.1 337
Total 9.0 3.5 1,006
Notes:
• Open pit resources are reported within optimised pit shells based on A$4,500 per ounce gold price and
reported at 0.5 g/t Au cut-off grade.
• Underground resources are reported below optimised pits and constrained within mineralised domains in
optimised mineable shapes at 1.5g/t gold cut-off grade.
• All figures are rounded to reflect appropriate levels of confidence.
• Apparent differences may occur due to rounding.
• Details of optimisation parameters are reported in Ballard’s ASX release dated 26 February 2026.
Baldock Extensional Growth Results
During 2026, Ballard intends to conduct extensive resource growth drilling at Baldock, targeting the entire
3.1km strike length below the current drilling which on average is only 350 metres deep (Figure 2). The aim
of the 2026 drilling program at Baldock is to substantially increase the existing Baldock resource, targeting
350 – 750m vertical depth range.
Leveraging off Baldock is a logical strategy as Baldock is fully permitted for both open pit and underground
mining. Baldock is expected to be predominantly an underground mine. Once the decline, ventilation,
escapeway network, power and other services are established, the extraction of additional identified
resources becomes an incremental opportunity. Baldock is planned to provide the base-load feed for Mt
Ida, with the proposed Process Plant located adjacent to the Baldock mine under the approved Mining
Proposal and Works Approval.
On 2 February 2026, the Company released initial resource extension assay results from below the current
Baldock Mineral Resource which includes 21 drill holes for 6,322m drilled below the northern (Nebula),
central (Meteor) and southern (Baldock) parts of the Baldock deposit.
Significant extensional results reported during the March quarter included:
7
ASX: BM1
ballardmining.com.au
• 3m at 5.0 g/t Au from 103m; and
• 10m at 3.2 g/t Au from 416m; and
• 2m at 9.0 g/t Au from 448m (EMEX019) (central Baldock)
• 6m at 2.3 g/t Au from 51m; and
• 1m at 10.0 g/t Au from 300m (EMEX022) (central Baldock)
• 2m at 12.3 g/t Au from 187m (BMRD009) (northern Baldock)
The Company is currently awaiting assay results but can confirm that drilling in March and early April has
continued to intersect mineralised zones that are typical of the Baldock deposit, containing visible
sulphides (pyrite, pyrrhotite, chalcopyrite) and quartz.
Forty pre-collar drill holes have been cleared for deeper diamond holes designed to test Baldock to 750m
vertical. Approximately half these holes have a second hole (wedge) drilled from the same collar position.
Mt Ida Regional Resource Growth
Ballard’s 2026 Resource Growth exploration program is designed to identify additional open pit satellite
feed sources at Mt Ida to supplement the baseload Baldock deposit.
Ballard has 26km of underexplored highly prospective greenstone belt at Mt Ida. Eighteen targets were
originally identified across the Ballard Fault and the Baldock Thrust based on historical underground
workings and rock-chips. Following a detailed structural review, Ballard has now identified a total of 53
regional exploration prospects outside of Baldock (Figure 3).
Exploration will be focused on regional resource growth at Kestrel, Golden Vale, Bombay, West Knell and
Jupiter (combined MRE of 164 koz) with additional drilling focused on identification of new maiden
resource opportunities across Ballard’s broader landholding. Initial proof of concept drilling at new
maiden MRE opportunities during 2025 included the Neptune, Astro and Pluto prospects.
Drilling during 2026 will focus on the identification of new resource opportunities across Ballard’s broader
landholding via systematic testing of all 53 of its regional exploration prospects, which have now been
prioritised based on known mineralisation, structural prospectivity, geochemical anomalism and
geophysical signatures where alteration associated with mineralisation can often be identified.
During the March 2026 Quarter, Ballard received and reported regional resource growth assay results
consisting of a total 165 drill holes for 22,880m drilled.
Regional resource growth drilling was also carried out along the Ballard Fault zone at Neptune, Golden
Vale, West Knell, Alya, Orion and Europa. Further drilling was also completed at Astro-Quasar.
There are a substantial number of holes awaiting assay results (including further results from Golden Vale
and Astro-Quasar) which are expected to be released in the coming weeks. These results are expected to
inform the direction of future drilling at key prospects and will support the delineation of an updated MRE.
The most notable drilling results received during the March quarter are summarised below by prospect.
8
ASX: BM1
ballardmining.com.au
West Knell – Europa
The West Knell deposit currently has an Inferred resource of 420 kt at 2.9 g/t Au containing 40 koz of gold
that occurs as a series of stacked north-south moderately east dipping shear zones comprised of quartz
and sulphides within an alteration zone of silica, biotite and chlorite. The host rock is anorthosite, a
plagioclase rich differentiated gabbro sill. The style of mineralisation is strikingly similar to Baldock.
The Europa prospect is around 500m south of West Knell and consists of similar mineralisation also hosted
in anorthosite. West Knell – Europa is located approximately 7km from the proposed fully permitted central
processing facility at Baldock.
Drilling has extended the West Knell mineralisation south and the Europa mineralisation north. It is
probable that the two prospects are linked, which would increase the mineralised trend to 1,100m.
Significant results returned during the quarter included:
• 10m at 6.4 g/t Au from 28m (WKEX053)
• 3m at 5.7 g/t Au from 77m (WKEX058)
• 2m at 5.1 g/t Au from 161m (WKEX053A)
• 5m at 10.0 g/t Au from 83m (WKEX071)
• 3m at 2.8 g/t Au from 185m (WKEX067)
• 3m at 2.7 g/t Au from 54m (EUEX011)
• 2m at 5.6 g/t Au from 107m (EUEX006)
Neptune Prospect
The Neptune trend is located on the Ballard Fault, approximately 6km from Baldock. Mineralisation occurs
in east dipping shear zones within a silica-biotite-pyrite altered anorthosite which is interpreted to be the
same host rock and mineralising system as the Baldock deposit but on the opposite side of the Copperfield
Granite intrusion.
Drill testing around historical shafts at the Neptune prospect has identified an anastomosing mineralised
zone within an intrusive anorthosite unit that extends 990m in a north-northwest direction and dips steeply
(70 degrees) to the east-northeast. The mineralised zone is offset regularly by NNE and NE trending faults.
Mineralisation consists of pyrite-albite-biotite alteration and quartz veining.
Significant results announced during the March quarter included:
• 4m at 4.0 g/t Au from 55m (BMEX198)
• 6m at 5.6 g/t Au from 131m (BMEX199)
• 2m at 41.5 g/t Au from 156m (BMEX208)
9
ASX: BM1
ballardmining.com.au
Golden Vale deposit
The Golden Vale deposit has an existing inferred gold resource of 27 koz and has previously produced 62
kt at 6.0 g/t Au for 13 koz from historical open pit mining1
. Mineralisation in the open pit occurs as a series
of shallow southeast dipping quartz lodes in basaltic amphibolite immediately adjacent to the contact with
the Ballard Fault zone. The Company is pleased to report that recent drilling has identified widespread
shallow gold mineralisation with the potential for open pit mining, with mineralisation encountered only
4m from surface.
Significant results included:
• 4m at 1.2 g/t Au from 4m (GVEX040)
• 1m at 7.0 g/t Au from 9m (GVEX039)
• 4m at 1.3 g/t Au from 16m (GVEX037)
• 2m at 1.6 g/t Au from 27m (GVEX035)
• 14m at 1.5 g/t Au from 36m (GVEX040)
• 4m at 0.9 g/t Au from 39m (GVEX039)
• 1m at 14.1 g/t Au from 45m (GVEX035)
• 8m at 0.9 g/t Au from 55m (GVEX038)
• 9m at 0.9 g/t Au from 59m (GVEX039)
The Company is encouraged by the recent drilling and has scheduled a larger drilling program to extend
the deposit to the south and east.
Mt Ida Project Development
Project Development workstreams are advancing at Mt Ida to support the delivery of a maiden Ore Reserve
and Feasibility Study to support a Final Investment Decision in H1 CY2027.
Metallurgical and Process Plant Studies
Ballard is advancing metallurgical studies to a feasibility level of detail for the Baldock Deposit. By the end
of the period the studies are approximately 80% complete. Results continue to demonstrate that the
Baldock deposit is amenable to a conventional CIL gold processing circuit, with an overall average +91%
metallurgical recovery for both open pit and underground.
The Process Plant study will provide the deliverables that will allow Ballard to undertake an EPC tender to
build the Processing Plant. This is expected tooccur in H2 CY2026 and support the delivery of the Definitive
Feasibility Study by H1 CY2027.
1
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information
10
ASX: BM1
ballardmining.com.au
Geotechnical Studies
Ballard is advancing geotechnical studies to a feasibility level of detail for the Baldock Deposit.
Geotechnical investigation drilling and core logging work has been completed with detailed assessment
and analysis is well advanced.
Additional Production Bores
Ballard has an approved water abstraction licence of 2.5 GL/yr from the Lake Raeside Paleochannel
located approximately 40km north of the Mt Ida Project location (Figure 3). The borefield location is
connected to the Project site by an approved Miscellaneous License (L29/229) which allows for the
construction of the borefield, pipeline and access road.
Ballard has previously installed three production bores at Lake Raeside. As part of ongoing de-risking for
Project execution, the Company is installing an additional three to four production bores. An aircore rig is
undertaking water exploration for the additional production bores and reconnaissance drilling across the
broader 460km2
tenement package.
The Company also has an approved 1.2 GL/yr abstraction licence at Mt Ida from the fractured rock
aquifers. Including the 2.5 GL/yr from the Raeside Paleochannel, the total approved water abstraction
license is 3.7 GL/yr.
Expansion of Mt Ida Exploration Camp and Public Road Diversion
An additional eight rooms are being installed at the existing exploration camp, expanding camp capacity
to 30 rooms. The additional rooms will be used by personnel undertaking early works scopes and may
ultimately house personnel of the contractor which will build the accommodation village which will
subsequently house the construction workforce on a favourable FID.
The Company is also planning on undertaking a public road diversion in H2 CY2026 ahead of FID. This will
minimise any interaction between public traffic and construction activities. The road diversion is fully
approved. Ballard has commenced a tender process for the construction, as well as engagement with
local stakeholders.
11
ASX: BM1
ballardmining.com.au
Figure 4 - Plan View of Mt Ida Development Footprint as per the Company’s approved Mining Proposal
12
ASX: BM1
ballardmining.com.au
Corporate
Successful Capital Raising – Funded to Final Investment Decision
In January 2026, Ballard completed a single-tranche placement raising approximately $61.0 million
(Placement). The placement consisted of the issue of 76,250,000 fully paid ordinary shares at an issue
price of $0.80 per new Placement share.
Ballard initially sought $50.0 million through the Placement under the Company’s existing ASX Listing
Rules 7.1 and 7.1A placement capacity. The Placement offer also included an option for Ballard to accept
oversubscriptions on the same terms. This option was exercised bringing the total amount raised to
$61.0M (before costs). The Placement was extremely well supported by existing shareholders and strong
demand from new resource-focused institutional investors, particularly in North America, Europe and
Australia.
Capital Structure
The current capital structure of Ballard as at the date of this release is shown below.
Class of Shares Number
Ordinary Shares* 454,605,804
Unlisted Options (at various exercise prices & expiry dates) 8,125,000
Performance Rights^ 14,647,500
* Delta Lithium Ltd hold 34.4% of the issued capital. This holding is subject to a mandatory escrow period from the
ASX ending 2 years from the IPO. In addition, 3 other major shareholders of Ballard agreed to a 6-month voluntary
escrow and a further 6-month orderly market condition for the shares they received as part of the in-specie distribution
by Delta to its shareholders. Subsequent to end of the March quarter, Ballard announced that pursuant to ASX Listing
Rule 3.10A, 36,972,508 fully paid ordinary shares were released from voluntary escrow on 9 April 2026. Refer to the
Prospectus lodged on 10 July 2025 and ASX announcement dated 9 April 2026 for additional information.
^ The performance rights issued to management and staff all have the same vesting criteria, split across 3 tranches,
that are aligned to the future growth and success of Ballard. Refer to the Annual Report released on 22 September
2025 for additional information.
Cash Balance
At the end of the March quarter the Company had a cash balance of $75.6 million (Dec Qtr. $28.8 million).
The operational outflow for the quarter was due predominantly to exploration and evaluation expenditure
at Mt Ida of $9.4 million.
ASX Compliance
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure during the March 2026 Quarter was
$9,417,000. Full details of exploration activity during the March 2026 Quarter are
set out in this report.
ASX Listing Rule 5.3.2: There was no substantive mining production and development activities during
the March 2026 Quarter.
ASX Listing Rule 5.3.5: Payments to related parties of the Company and their associates during the
March Quarter: $268,000. The Company advises that this relates to non-
executive director’s fees and executive directors’ salaries and entitlements only.
Please see Remuneration Report in the Annual Report for further details on
Directors’ remuneration.
13
ASX: BM1
ballardmining.com.au
March 2026 Quarter – ASX Announcements
This Quarterly Activities Report contains information extracted from ASX market announcements reported
in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting
tables where applicable) of exploration results referred to in this Quarterly Report can be found in the
following announcements lodged on the ASX:
Title Date
Mt Ida Project Development and Early Works Update^ 7 April 2026
More Shallow High Grade Regional Results^ 1 April 2026
Regional Prospects advance Mt Ida Development strategy 11 March 2026
Baldock Gold Resource Increases to 1.0 Million Ounces 26 February 2026
First Mt Ida Extensional and Exploration Results for 2026 (Supplementary
Announcement)
3 February 2026
First Mt Ida Extensional and Exploration Results for 2026 2 February 2026
Successful $61M Placement – Ballard Funded to Final Investment Decision 23 January 2026
Mt Ida Resource Growth and Development Update 13 January 2026
^ released subsequent to the end of the Quarter
The announcements can be viewed on the Company’s website www.ballardmining.com.au under the
Investors tab.
Ballard confirms that it is not aware of any new information or data that materially affects the information
included in any original ASX announcement.
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Finance Director
info@ballardmining.com.au
14
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset
towards production. With current JORC compliant resources of 12.2Mt @ 3.0 g/t Au, strong balance sheet and an
experienced team driving the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area
has received full open cut and underground mining approvals with a Works Approval for up to 2.0 Mtpa Processing
Plant and Tailings Storage Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to
increase confidence in the current MRE and increase the global resource inventory via an aggressive exploration
program. All modifying factors will be advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd
Hibberd, a Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr.
Hibberd has sufficient experience that is relevant to the style of mineralisation and type of deposit under consideration
and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr.
Hibberd consents to the inclusion in this announcement of the matters based on his information in the form and
context in which it appears.
The information in this report which relates to Mineral Resources for the Baldock gold deposit at the Mt Ida Gold Project
was prepared by Michael Andrew an employee of Snowden Optiro. Mr Andrew is a Fellow of the Australasian Institute
of Mining and Metallurgy (Membership No. 111172) and has sufficient experience relevant to the style of
mineralisation, the type of deposit under consideration and to the activity undertaken to qualify as Competent Persons
as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Andrew consents to the inclusion of the information in the release in the form and context in which
it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously
prepared and disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30
May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus).
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard
management’s expectations and beliefs concerning future events as of the time of the release of this announcement.
Forward-looking and aspirational statements are necessarily subject to risks, uncertainties and other factors, some
of which are outside the control of Ballard, which could cause actual results to differ materially from such statements.
Ballard makes no undertaking to subsequently update or revise the forward looking or aspirational statements made
in this release to reflect events or circumstances after the date of this release, except as required by applicable laws
and the ASX Listing Rules.
15
ASX: BM1
ballardmining.com.au
Appendix A: Ballard Global Mineral Resource Estimate (February 2026)
Cutoff Deposit
Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Open cut
0.5g/t Au
Baldock 2,916 3.9 362 395 2.6 33 3,311 3.7 395
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Tailings - - - 500 0.5 8 500 0.5 8
Underground
1.5g/t Au
Baldock 2,658 3.6 307 2,992 3.2 304 5,651 3.4 610
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3 3 30 3 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
All
Baldock 5,574 3.7 669 3,388 3.1 337 8,962 3.5 1,006
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Tailings 500 0.5 8 500 0.5 8
Total 5,574 3.7 669 6,684 2.4 509 12,258 3.0 1,178
Notes:
• Open pit resources are reported within optimised pit shells based on A$4,500 per ounce gold price and
reported at 0.5 g/t Au cut-off grade.
• Underground resources are reported below optimised pits and constrained within mineralised domains in
optimised mineable shapes at 1.5g/t gold cut-off grade.
• All figures are rounded to reflect appropriate levels of confidence.
• Apparent differences may occur due to rounding.
16
ASX: BM1
ballardmining.com.au
Appendix B: Tenement Listing
Project Location Tenement Status
Interest at start
of Quarter
Interest at end
of Quarter
Mt Ida ^ Western Australia E29/0640 Granted 100% 100%
Mt Ida ^ Western Australia E29/0771 Granted 100% 100%
Mt Ida ^ Western Australia E29/0944 Granted 100% 100%
Mt Ida ^ Western Australia E29/0964 Granted 100% 100%
Mt Ida Western Australia E29/1006 Granted 100% 100%
Mt Ida Western Australia E29/1032 Granted 100% 100%
Mt Ida Western Australia E29/1033 Granted 100% 100%
Mt Ida ^ Western Australia E29/1238 Granted 100% 100%
Mt Ida ^ Western Australia E29/1239 Granted 100% 100%
Mt Ida ^ Western Australia E29/1240 Granted 100% 100%
Mt Ida ^ Western Australia E29/1262 Application 100% 100%
Mt Ida^ Western Australia E29/1288 Granted 100% 100%
Mt Ida^ Western Australia E29/1292 Application 100% 100%
Mt Ida^ Western Australia E29/1293 Granted 100% 100%
Mt Ida^ Western Australia E29/1309 Application 100% 100%
Mt Ida Western Australia E29/1316 Application 100% 100%
Mt Ida Western Australia E29/1317 Application 100% 100%
Mt Ida ^ Western Australia M29/0002 Granted 100% 100%
Mt Ida ^ Western Australia M29/0094 Granted 100% 100%
Mt Ida ^ Western Australia M29/0165 Granted 100% 100%
Mt Ida ^ Western Australia M29/0422 Granted 100% 100%
Mt Ida ^ Western Australia M29/0429 Granted 100% 100%
Mt Ida ^ Western Australia M29/0444 Granted 100% 100%
Mt
Share your feedback
Discover