New Gold Discovery at Neptune
Released
Released
Announcement PDF
ASX Announcement – 15th September 2025
NEW GOLD DISCOVERY AT NEPTUNE
HIGHLIGHTS
•
New gold discovery identified at the Neptune Prospect located 7km east of the
Baldock Gold Deposit (930koz at 4.1 g/t1)
•
Neptune assays include:
o 23m at 1.8 g/t gold from 21m in IDRD410
o 7m at 5.8 g/t gold from 113m in IDRD417
o 7m at 1.7 g/t gold from 48m in IDRD408
•
Neptune is the first of 18 regional exploration Prospects identified as part of
the Company’s IPO. Exploration drilling is ongoing
•
Mineralisation extends along a 500m zone and is open along strike and at
depth
•
Gold mineralisation appears to be identical in character to the mineralisation
at the Baldock Deposit
•
This discovery opens the entire 13km underexplored Ballard Fault as a high
priority exploration zone
Commenting on the results, Managing Director Paul Brennan said:
“This an exceptional start to our regional exploration program. These results represent the first
round of assays received from the first exploration prospect.
Neptune is located within the 13km Ballard Fault Zone which hosts multiple prospects, defined
by high grade rock chips and the presence of historical underground shafts. The discovery has
striking similarities to mineralisation at the Baldock Deposit which opens up the entire Ballard
Fault with the potential to host another Baldock scale deposit.
Broad shallow intercepts such as the 23m @ 1.8 g/t lend themselves to low strip, low cost open
pit mining generating oxide and transitional material which is the ideal supplement to blend with
underground fresh rock. We expect Baldock to primarily be an underground mine.
Our stated ambition since Ballard listed on the ASX in July 2025 is that by mid-2026 the Company
will have a 5 to 6 year mine life at Baldock underpinned by a maiden Ore Reserve and visibility
over a 10 year mine life with exploration success. Ongoing confirmatory infill drilling results at
Baldock (as released to the ASX on the 31st July 2025 and 26th August 2025) coupled with the
immediate exploration success at Neptune is a significant step in achieving that outcome’’.
1 Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
the Exploration drilling program at its Mt Ida Gold Project located 540km northeast of Perth in
the Goldfields region of Western Australia (Figure 6). The Mt Ida Gold Project covers 26km of
prospective greenstone belt, folded around the Copperfield Granite (Figure 1).
Along with infill and extensional drilling being undertaken at Baldock, the Company has
received results from initial regional exploration drilling, identifying a new gold discovery at the
Neptune Prospect. This discovery confirms the prospective nature of the underexplored Ballard
Fault where additional priority exploration targets are located.
New Gold Discovery at the Neptune Prospect
The regional Mt Ida exploration program has had immediate success at the Neptune Prospect
(Figures 1-3) with drilling intersecting substantial gold mineralisation. Neptune sits within the
Ballard Fault which already hosts approximately 120,000 ounces of Mineral Resources across
West Knell, Kestrel and Golden Vale (refer Appendix A).
Neptune is the first of 18 regional prospects to be tested with drilling. A total of 12 holes were
completed with gold mineralisation identified in 8 holes (Figures 4-6). Drilling focused around
existing historical underground workings (Figure 3). These are typically timber lined shallow
Prospector shafts with no production records available.
Mineralisation occurs in east dipping shear zones within a silica-biotite-pyrite altered
anorthosite which is interpreted to be the same host rock and mineralizing system as the
Baldock Gold Deposit but on the opposite side of the Copperfield Granite intrusion (Figure 1).
Significant results include:
•
•
•
•
23m at 1.8 g/t gold from 21m in IDRD410
7m at 5.8 g/t gold from 113m in IDRD417
7m at 1.66 g/t gold from 48m in IDRD408
3m at 1.65 g/t gold from 9m in IDRD409
These results are supported by rock chip samples that returned 85.7 g/t gold and 14.5 g/t gold,
collected from the historical Neptune workings earlier this year2.
The discovery has striking similarities to mineralisation at the Baldock Deposit which opens up
the entire 13km Ballard Fault as a high priority exploration zone with the potential to host
another Baldock scale deposit (Figure 2). Neptune is located 7km east of Baldock.
Initial Phase 1 exploration drilling has been completed at a further 5 prospects to the North of
Neptune, namely Pulsar, Ayla, Europa, Comet and Eclipse (Figure 2). The Company expects
further assay results during October and has commenced planning the follow-up Phase 2
drilling at Neptune which will comprise both Reverse Circulation and Diamond Drilling.
2 Refer ASX Announcement lodged by Ballard Mining on the 22nd July 2025 for further information
ASX: BM1
ballardmining.com.au
2
Figure 1- Current identified exploration Prospects (yellow dots) with Neptune location highlighted
ASX: BM1
ballardmining.com.au
3
Figure 2 – Ballard Fault Zone showing the Neptune prospect with historical rock chip3 sampling
3
Refer ASX Announcement lodged by Ballard Mining on the 22nd July 2025 for further information
ASX: BM1
ballardmining.com.au
4
Figure 3 – Historical Shafts at Neptune showing rockchip samples3
Figure 4 – Plan view of the geology of the Neptune prospect showing collar locations, historical
underground workings, scale of mineralisation and cross section location (Figures 5 and 6)
ASX: BM1
ballardmining.com.au
5
Figure 5 – Neptune cross sections A and B showing drilling and interpreted mineralisation (refer Figure 4
for section location)
Figure 6 – Neptune cross sections C and D showing drilling and interpreted mineralisation (refer Figure 4
for section location)
ASX: BM1
ballardmining.com.au
6
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3
million tonnes @ 3.3 g/t Au for 1.1 million ounces4 of contained gold. The Baldock deposit,
which hosts 930koz @ 4.1 g/t4 forms the basis for future development opportunities at Mt Ida.
Figure 7 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
A 130,000m drill program is underway across the Project, targeting highly prospective and
underexplored zones along the 26km strike of both the Baldock Thrust and the Ballard Fault
(Figure 1).
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval application for up to 1.5Mtpa Processing and Tails Storage Facility is currently
under assessment.
-END-
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
4
ASX: BM1
ballardmining.com.au
7
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open cut and underground mining approvals with a Works Approval for a 1.5Mtpa processing facility submitted to DWER and
under assessment. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the
current MRE and increase the global resource inventory via an aggressive exploration program. All modifying factors will be
advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
ASX: BM1
ballardmining.com.au
8
Appendix A: April 20255 Mineral Resource Estimate
Cut off
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Deposit
Tonnes
(000s)
Indicated
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Baldock
Kestrel
Bombay
West Knell
Jupiter
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Total
2,600
4.5
365
1,570
3.6
-
-
-
940
1.6
-
-
-
496
Inferred
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Total
Grade
g/t Au
Ounces
(000s)
200
4,120
4.2
563
48
940
1.6
48
1.7
27
496
1.7
27
711
1.3
30
711
1.3
30
238
3.3
25
238
3.3
25
50
1.7
3
50
1.7
3
-
-
-
500
0.5
8
500
0.5
8
242
4.8
37
2,610
4.0
338
2,850
4.0
368
-
-
-
80
1.8
5
80
1.8
5
30
3.0
3
30
3.0
3
192
2.4
15
192
2.4
15
2,840
4.5
-
-
-
-
2,840
4.5
402
-
402
90
2.7
8
90
2.7
8
4,220
3.9
532
7,000
4.1
930
1,000
1.7
53
1,000
1.7
53
496
1.7
27
496
1.7
27
740
1.4
33
740
1.4
33
420
2.9
40
420
2.9
40
140
2.3
11
140
2.3
11
500
0.5
8
500
0.5
7,500
3.0
699
10,310
3.3
8
1,102
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
5
ASX: BM1
ballardmining.com.au
9
Appendix B: Recent Project Data
Appendix B1: Recent Significant Intercepts reported in this announcement
* Blank Cu values indicate that Cu assays have not yet been received
Hole ID
From
To
Length
Gold g/t
Copper ppm
IDRD407
10
11
1
0.54
374
IDRD408
48
55
7
1.66
564
IDRD409
9
12
3
1.65
338
IDRD410
21
44
23
1.8
1055
IDRD411
15
16
1
2.32
2890
23
24
1
0.63
487
IDRD412
61
68
7
0.7
569
IDRD413
68
69
1
1.09
200
IDRD417
113
120
7
5.77
784
and
IDRD414
NSI
IDRD415
NSI
IDRD416
NSI
IDRD418
NSI
Appendix B2: Collar Information for holes reported in this announcement
Hole ID
Depth
East
North
IDRD407
IDRD408
IDRD409
IDRD410
IDRD411
IDRD412
IDRD413
IDRD414
IDRD415
IDRD416
IDRD417
IDRD418
RL
Azi
Dip
60
114
78
162
60
102
102
162
78
257,795
257,826
257,815
257,849
257,845
257,877
257,866
257,897
257,696
6,780,861
6,780,884
6,780,827
6,780,849
6,780,800
6,780,818
6,780,766
6,780,791
6,781,093
457.94
453.87
456.4
453.01
453.21
450.18
449.18
447.39
455.79
232.75
228.35
227.47
230.46
228.11
230.03
229.8
230.42
228.92
-59.09
-59.31
-60.48
-60.41
-59.83
-60
-60.23
-60.47
-59.95
90
138
156
257,676
257,731
257,691
6,781,121
6,781,117
6,781,156
458.01
455.66
458.47
231.17
231.1
228.59
-60.42
-59.51
-60.67
ASX: BM1
ballardmining.com.au
10
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Lithium Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria
Explanation
Sampling
Nature and quality of sampling (eg cut
techniques
channels, random chips, or specific
specialised industry standard
Commentary
•
•
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
•
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
•
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
•
•
•
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
•
pulverised to produce a 30 g charge for
Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
Historic core has been cut and sampled to
geological intervals
These methods of sampling are considered to be
appropriate for this style of exploration
No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
It is assumed that these were collected and
assayed using industry standard practices
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
ASX: BM1
ballardmining.com.au
11
Criteria
Explanation
Drilling
Drill type (eg core, reverse circulation,
techniques
open-hole hammer, rotary air blast,
Commentary
•
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Drill sample
Method of recording and assessing core
recovery
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
•
•
•
•
•
•
•
Whether a relationship exists between
sample recovery and grade and whether
RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling & PXD, RC drilling
utilised an Explorac 220RC rig, T66 Schramm RC
Rig with a 143 mm face sampling hammer bit, DD
drilling was completed by a truck mounted
Sandvik DE820 and a KWL 1500 and has been a
combination of PQ2, HQ2 and NQ2 diameter.
Diamond tails average 200-300m depth
Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
Historic DD drilling was NQ sized core
It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
Recovery on diamond core is recorded by
measuring the core metre by metre
Limited sample recovery and condition
information has been supplied or found for
historic drilling
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have
•
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
•
•
•
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
•
•
•
•
Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
All RC chip trays, and drill core are photographed
in full
A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
No historic core or chip photography has been
supplied
Historic comments on logging are very useful in
to verify geological details between lithologies.
Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
ASX: BM1
ballardmining.com.au
12
Criteria
Explanation
Sub-sampling
If core, whether cut or sawn and
techniques and
whether quarter, half or all core taken.
sample
If non-core, whether riffled, tube
preparation
sampled, rotary split, etc and whether
Commentary
•
•
sampled wet or dry. For all sample
types, the nature, quality and
•
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
•
all sub-sampling stages to maximise
representivity of samples.
•
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
•
duplicate/second-half sampling.
Whether sample sizes are appropriate to
•
the grain size of the material being
sampled.
•
•
•
•
•
•
DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
Ballard have recently amended the Photon
methodology to carry out analysis on Pulverised
material rather than crushed material, studies
suggest the results are comparable.
RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
ASX: BM1
ballardmining.com.au
13
Criteria
Explanation
Quality of assay
The nature, quality and appropriateness
data and
of the assaying and laboratory
laboratory tests
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
Commentary
•
•
•
•
duplicates, external laboratory checks)
and whether acceptable levels of
•
accuracy (ie lack of bias) and precision
have been established.
•
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
•
parameters used in determining the
Samples have been analysed by external
laboratories utilising industry standard methods
The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
Photon assay is a non-destructive total analysis
technique
Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
Limited historic QAQC data has been supplied,
industry standard best practice is assumed
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Verification of
The verification of significant
sampling and
intersections by either independent or
assaying
alternative company personnel. The use
of twinned holes. Documentation of
•
•
•
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
Location of data
Accuracy and quality of surveys used to
points
locate drill holes (collar and down-hole
•
•
•
•
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation. Specification of
the grid system used. Quality and
•
•
adequacy of topographic control
•
•
•
Significant intercepts have been reviewed by
senior personnel
No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data was supplied in various
formats and has been validated as much as
practicable
No adjustments to assay data have been made
Data entry, verification and storage protocols
remain unknown for historic operators
MGA94 zone 51 grid coordinate system is used
Current drilling collars have been pegged using a
DGPS unit, all collars will be surveyed upon
program completion by an independent third
party
All infill drill holes are pegged using a DGPS for
maximum accuracy
Downhole surveys are completed by the drilling
contractors using a true north seeking gyro
instrument, AC drillholes did not have downhole
surveys carried out
Topography has been surveyed by recent
operators. Collar elevations are consistent with
surrounding holes and the natural surface
elevation
Historic collars are recorded as being picked up
by DGPS, GPS or unknown methods and utilised
the MGA94 zone 51 coordinate system
Historic downhole surveys were completed by
north seeking gyro, Eastman single shot and multi
shot downhole camera
ASX: BM1
ballardmining.com.au
14
Criteria
Explanation
Data spacing and
Data spacing for reporting of Exploration
distribution
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
Commentary
•
•
•
Drill hole spacing is variable throughout the
program area
Spacing is considered appropriate for this style of
exploration
Sample compositing has not been applied
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied. Whether sample compositing
has been applied.
Orientation of
Whether the orientation of sampling
data in relation to
achieves unbiased sampling of possible
geological
structures and the extent to which this is
structure
known, considering the deposit type. If
•
•
the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
•
have introduced a sampling bias, this
Drill holes are orientated perpendicular to the
regional trend of the mineralisation previously
drilled at the project; drill hole orientation is not
considered to have introduced any bias to
sampling techniques utilised
Some drillholes previously targeting Lithium
mineralisation were not optimal for the Gold but
this has been taken into account for modelling
and statistics
Where intercepts are not perpendicular, this will
be illustrated in the announcement /figures
should be assessed and reported if
material
Sample security
The measures taken to ensure sample
•
•
Samples are prepared onsite under supervision
of Ballard Mining staff and transported by a third
party directly to the laboratory
Historic sample security measures are unknown
•
None carried out
security
Audits or reviews
The results of any audits or reviews of
sampling techniques and data.
ASX: BM1
ballardmining.com.au
15
JORC Table 1; Section 2: Reporting of Exploration Results
Criteria
Explanation
Mineral
Type, reference name/number, location
tenement and
and ownership including agreements or
land tenure
material issues with third parties such as
status
joint ventures, partnerships, overriding
Commentary
•
•
•
Drilling and sampling activities have been carried
on M29/2, M29/165 and E29/640, M29/444,
M29/422, E29/771 and M29/94
The tenements are in good standing
There are no heritage issues
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings. The security of
the tenure held at the time of reporting
along with any known impediments to
obtaining a licence to operate in the area
Exploration
Acknowledgment and appraisal of
done by other
exploration by other parties.
•
parties
Geology
Deposit type, geological setting and style
•
of mineralisation.
•
•
•
•
•
•
•
Drill hole
A summary of all information material to
Information
the understanding of the exploration
•
The area has a long history of gold and base
metals exploration and mining, with gold being
discovered in the district in the 1890s. Numerous
generations of exploration and mining have been
completed including activities such as drilling,
geophysics and geochemical sampling
throughout the tenure
The Mt Ida project is located within the Eastern
Goldfields region of Western Australia within the
Mt Ida/Ularring greenstone belt
Locally the Kurrajong Antiform dominates the
regional structure at Mount Ida, a southsoutheast trending, tight isoclinal fold that
plunges at a low angle to the south. The Antiform
is comprised of a layered greenstone sequence of
mafic and ultramafic rocks
Late stage granitoids and pegmatites intrude the
sequence
These later stage pegmatites intrude through the
pre-exiting Gold lodes and other stratigraphy.
The intrusion of this Granitoid resulted in the
greenstone sequence being overturned with the
Western sequence dipping to the West and the
Eastern limb dipping to the East.
Gold mineralisation has been identified in a
number of styles, primarily being shear hosted
structures with sulphide development +/- Quartz.
These mineralised shears often form along the
plane of weakness between lithology contacts
however can also form independent of any
contacts which are likely later stage reactivations.
The Mt Ida Project has a structural complex
history with a number of deformational events.
A list of the drill hole coordinates, orientations
and metrics are provided in the Appendix when
applicable
results
Share your feedback
Discover