AGM Presentation
Released
Released
Announcement PDF
ballardmining.com.au
2 8 N o v e m b e r 2 0 2 5
2025 Annual
General Meeting
ballardmining.com.au
2
Proxy Results
For Against Open Abstain / Excluded
214,171,741 223,168 98,100 765,656
RESOLUTION 1 – REMUNERATION REPORT
To consider and, if thought fit, to pass with or without amendment, as a non-binding ordinary resolution the following:
'That, pursuant to and in accordance with section 250R(2) of the Corporations Act and for all other purposes, approval is
given by the Shareholders for the adoption of the Remuneration Report on the terms and conditions in the Explanatory
Memorandum.'
ballardmining.com.au
3
Proxy Results
RESOLUTION 2 – RE-ELECTION OF MR STUART MATHEWS AS A DIRECTOR
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
'That, pursuant to and in accordance with Listing Rule 14.5, article 7.3(c) of the Constitution and for all other purposes, Mr Stuart
Mathews, a Director, retires and being eligible pursuant to article 7.3(f) of the Constitution and offering himself for re-election, is
re-elected as a Director on the terms and conditions in the Explanatory Memorandum.'
For Against Open Abstain / Excluded
214,988,862 126,674 89,582 53,547
ballardmining.com.au
4
Proxy Results
RESOLUTION 3 – RATIFICATION OF APPOINTMENT OF AUDITOR
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
'That, pursuant to and for the purposes of section 327B of the Corporations Act and for all other purposes, Shareholders approve
and ratify the appointment of Hall Chadwick WA Audit Pty Ltd as auditor of the Company.’
For Against Open Abstain / Excluded
215,096,862 3,674 89,582 68,547
ballardmining.com.au
5
Proxy Results
RESOLUTION 4 – APPROVAL OF POTENTIAL TERMINATION BENEFITS TO
EXECUTIVE DIRECTORS AND SENIOR MANAGEMENT
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
'That, pursuant to and in accordance with Part 2D.2 of the Corporations Act (including sections 200B and 200E of the
Corporations Act), Listing Rule 10.19 and for all other purposes, Shareholders approve the provision of potential termination
benefits associated with the Incentive Performance Rights issued to Executive Directors, Messrs Paul Brennan and Tim Manners,
and to Ms Loren Falconer (Company Secretary) under the Prospectus and to Mr Todd Hibberd (Exploration Manager) (together,
the Relevant Personnel) in connection with the Relevant Personnel ceasing to hold a managerial or executive office on the
terms and conditions in the Explanatory Memorandum.’
For Against Open Abstain / Excluded
194,143,302 20,866,474 171,334 77,555
ballardmining.com.au
6
Proxy Results
RESOLUTION 5 – APPROVAL OF POTENTIAL TERMINATION BENEFITS TO NON
EXECUTIVE DIRECTORS
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
‘That, pursuant to and in accordance with Part 2D.2 of the Corporations Act (including sections 200B and 200E of the Corporations
Act), Listing Rule 10.19 and for all other purposes, Shareholders approve the provision of potential termination benefits associated
with the Incentive Options issued to Non-Executive Directors, Messrs Simon Lill, James Croser and Stuart Mathews, under the
Prospectus in connection with Messrs Lill, Croser and Mathews ceasing to hold a managerial or executive office on the terms and
conditions in the Explanatory Memorandum.’
For Against Open Abstain / Excluded
193,535,540 20,868,235 87,334 767,556
ballardmining.com.au
7
Proxy Results
RESOLUTION 6 – RATIFICATION OF BLUE RIBBON CONSIDERATION SHARES
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
‘That, pursuant to and in accordance with Listing Rule 7.4 and for all other purposes, Shareholders ratify the prior issue of
500,000 Blue Ribbon Consideration Shares to Blue Ribbon Mines Pty Ltd (or its nominee(s)) (Blue Ribbon) on the terms and
conditions in the Explanatory Memorandum’
For Against Open Abstain / Excluded
214,171,099 414,580 92,439 580,547
ballardmining.com.au
8
Proxy Results
RESOLUTION 7 – RATIFICATION OF AK CONSIDERATION SHARES
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
‘That, pursuant to and in accordance with Listing Rule 7.4 and for all other purposes, Shareholders ratify the prior issue of
108,868 AK Consideration Shares to Ardea Exploration Pty Ltd (Ardea) and Kalgoorlie Gold Mining Limited (Kalgoorlie Gold) (or
their nominee(s)) on the terms and conditions in the Explanatory Memorandum.’
For Against Open Abstain / Excluded
214,631,099 417,437 129,582 80,547
ballardmining.com.au
9
Proxy Results
RESOLUTION 8 – APPROVAL OF 10% PLACEMENT FACILITY
To consider and, if thought fit, to pass with or without amendment, as a special resolution the following:
'That, pursuant to and in accordance with Listing Rule 7.1A and for all other purposes, Shareholders approve the issue of Equity
Securities of up to 10% of the issued capital of the Company (at the time of the issue) calculated in accordance with the formula
prescribed in Listing Rule 7.1A.2 and on the terms and conditions in the Explanatory Memorandum.’
For Against Open Abstain / Excluded
214,897,552 191,422 89,582 80,109
ballardmining.com.au
10
Proxy Results
RESOLUTION 9 – RATIFICATION OF PLACEMENT SHARES ISSUED UNDER LISTING
RULE 7.1
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
'That, pursuant to and in accordance with Listing Rule 7.4 and for all other purposes, Shareholders ratify the prior issue of
37,383,199 Shares issued under Listing Rule 7.1 and pursuant to the Placement on the terms and conditions in the Explanatory
Memorandum.’
For Against Open Abstain / Excluded
202,344,883 149,809 181,699 46,444
ballardmining.com.au
11
Proxy Results
RESOLUTION 10 – ISSUE OF SHARES TO MR SIMON LILL UNDER THE DIRECTOR
PLACEMENT
To consider and, if thought fit, to pass with or without amendment, as an ordinary resolution the following:
That, pursuant to and in accordance with Listing Rule 10.11 and for all other purposes, Shareholders approve the issue of up to
363,637 Shares (at an issue price of $0.55 per Share) to Non-Executive Chair, Mr Simon Lill (and/or his nominee(s)) pursuant to
the Director Placement, on the terms and conditions in the Explanatory Memorandum.’
For Against Open Abstain / Excluded
202,096,346 196,378 95,451 334,660
ballardmining.com.au
2 8 N o v e m b e r 2 0 2 5
2025 AGM
MANAGING
DIRECTORS’
PRESENTATION
ballardmining.com.au
The following notices and disclaimers apply to this Presentation ("Presentation") and you are therefore advised to
read this carefully before reading or making any other use of this Presentation or any information contained in this
Presentation.
This Presentation is dated 28 November 2025 and has been prepared by the Board and management of Ballard
Mining Limited ("Ballard" or the "Company").
SUMMARY INFORMATION ONLY
The information in this Presentation is summary information only and is current as at the date of this Presentation
(unless otherwise indicated), and the information in this Presentation remains subject to change without notice. The
information in this Presentation is general in nature and does not purport to be accurate nor complete, nor does it
contain all of the information that an investor may require in evaluating a possible investment in Ballard, nor does it
contain all the information which would be required in a disclosure document or prospectus prepared in accordance
with the requirements of the Corporations Act 2001 (Cth) ("Corporations Act") or other legislation. It has been
prepared by Ballard with due care but no representation or warranty, express or implied, is provided in relation to the
accuracy, reliability, fairness or completeness of the information, opinions or conclusions in this Presentation by
Ballard or any other party involved in its preparation, except as required by law.
Reliance should not be placed on information or opinions contained in this Presentation and, Ballard does not have
any obligation to finalise, correct or update the contents of this Presentation, except as required by law.
This Presentation should be read in conjunction with Ballard's other periodic and continuous disclosure
announcements lodged with the ASX, which are available at www.asx.com.au.
FORWARD LOOKING STATEMENTS
This Presentation may contain forward-looking statements regarding the Company and its subsidiaries (including its
projects). Forward-looking statements may in some cases be identified by terminology such as “may”, “will”, “could”,
“should”, “expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict”, “potential” or “continue”, the negative
of such terms or other comparable terminology. These forward-looking statements are only predictions. These
forward-looking statements reflect various assumptions by or on behalf of Ballard. Accordingly, these statements are
subject to significant business, economic and competitive uncertainties and contingencies associated with the
mining industry which may be beyond the control of Ballard which could cause actual results or trends to differ
materially including, but not limited to, price and currency fluctuations, geotechnical factors, drilling and production
results, development progress, operating results, reserve estimates, legislative, fiscal and regulatory developments,
economic and financial market conditions in various countries, approvals and cost estimates, environmental risks,
ability to meet funding requirements, share price volatility. Accordingly, there can be no assurance that such
statements and projections will be realised.
Actual values, results or events may be materially different to those expressed or implied in this Presentation. Given
these uncertainties, recipients are cautioned not to place reliance on forward-looking statements. Any forward-
looking statement in this Presentation is given as at the date of this Presentation. Subject to any continuing
obligations under applicable law and the ASX Listing Rules, Ballard does not undertake any obligation to update or
revise any information or any of the forward-looking statements in this Presentation or any changes in events,
conditions or circumstances on which any such forward-looking statement is based.
NOT FINANCIAL PRODUCT ADVICE
This Presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial
product or investment advice, financial, legal, tax, accounting or other advice, or a recommendation to acquire any
securities of Ballard. It has been prepared without taking into account the objectives, financial or tax situation or
particular needs of any individual. Ballard is not licensed to provide financial product advice in respect of an
investment in securities or otherwise. Each investor must make its own independent assessment of Ballard before
acquiring any securities in the Company.
PAST PERFORMANCE
Any information regarding past performance included in this Presentation is given for illustrative purposes only and
should not be relied upon as (and is not) an indication of Ballard's views, or that of any other party involved in its
preparation, on Ballard's future performance or condition or prospects.
NOT AN OFFER
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law
or any other law and will not be lodged with the Australian Securities and Investments Commission. This
Presentation is for information purposes only and is not an invitation, offer or recommendation with respect to the
subscription, purchase or sale of any security in Ballard, or any other financial products or securities, in any place or
jurisdiction.
This Presentation has been prepared for publication in Australia and may not be released to US wire services or
distributed in the United States. This Presentation does not constitute an offer to sell, or a solicitation of an offer to
buy, securities in the United States or any other jurisdiction where it would be illegal. The distribution of this
Presentation in the United States and elsewhere outside Australia may be restricted by law. Persons who come into
possession of this Presentation should observe any such restrictions as any non-compliance could contravene
applicable.
13
DISCLAIMER
ballardmining.com.au
NO LIABILITY
The information contained in this Presentation has been prepared in good faith by Ballard. However, no guarantee,
representation or warranty expressed or implied is or will be made by any person (such as Ballard or its affiliates,
directors, officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness,
completeness or adequacy of any statements, estimates, options, conclusions or other information contained in this
Presentation, except as required by law.
To the maximum extent permitted by law, Ballard and its affiliates, directors, officers, employees, associates,
advisers and agents each expressly disclaims any and all liability, including, without limitation, any liability arising out
of fault or negligence, for any loss arising from the use of or reliance on information contained in this Presentation
including representations or warranties or in relation to the accuracy or completeness of the information, statements,
opinions, forecasts, reports or other matters, express or implied, contained in, arising out of or derived from, or for
omissions from, this Presentation including, without limitation, any financial information, production targets, financial
forecasts, estimates or projections and any other information derived therefrom. Statements in this Presentation are
made only as of the date of this Presentation unless otherwise stated and the information in this Presentation
remains subject to change without notice. No responsibility or liability is assumed by Ballard or any of its affiliates,
directors, officers, employees, associates, advisers or agents for updating information in this Presentation or to
inform any recipient of any new or more accurate information or any errors or omissions of which Ballard or any of its
affiliates, directors, officers, employees, associates, advisers or agents may become aware, except as required by
law.
INVESTMENT RISK
An investment in Ballard is subject to investment and other known and unknown risks, some of which are beyond
the control of Ballard. Those risks and uncertainties include factors and risks specific to Ballard such as (without
limitation) the status of exploration and mining tenements and applications and the risks associated with the non-
grant or expiry of those tenements and applications, liquidity risk, risks associated with the exploration or
developmental stage of projects, funding risks, operational risks, changes to government fiscal, monetary and
regulatory policies, the impact of actions of governments, the potential difficulties in enforcing agreements and
protecting assets, alterations to resource estimates and the imprecise nature of resource and reserve statements,
any circumstances adversely affecting areas in which Ballard operates, fluctuations in the production, volume and
price of commodities, any imposition of significant obligations under environmental regulations, fluctuations in
exchange rates, the fluctuating industry and commodity cycles, the impact of inflation on operating and development
costs, taxation, regulatory issues and changes in law and accounting policies, the adverse impact of wars, terrorism,
political, economic or natural disasters, the impact of changes to interest rates, loss of key personnel and delays in
obtaining or inability to obtain any necessary government and regulatory approvals, insurance and occupational
health and safety. Further information regarding the risks associated with an investment in Ballard are disclosed in
Ballard’s IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30
May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (“IPO
Prospectus”). Ballard does not guarantee any particular rate of return or the performance of Ballard, nor does it
guarantee the repayment of capital from Ballard or any particular tax treatment.
MINERAL RESOURCE ESTIMATE (MRE)
Information in this Presentation that relates to exploration results, the data and geological interpretation used as the
basis of the mineral resources was reported by Ballard in the IPO Prospectus and for which the consent of the
Competent Person Mr Shane Murray was obtained. Ballard confirms it is not aware of any new information or data
that materially affects the information included in the IPO Prospectus.
Information in this Presentation that relates to the gold mineral resource estimate at the Mt Ida Project was reported
by Ballard in the IPO Prospectus, and for which the consent of the Competent Person Mr Michael Andrew was
obtained. Ballard confirms it is not aware of any new information or data that materially affects the information
included in the IPO Prospectus and that all material assumptions and technical parameters underpinning the mineral
resource estimate in the IPO Prospectus continue to apply and have not materially changed.
JORC CODE DIFFERS FROM REPORTING REQUIREMENTS IN OTHER COUNTRIES
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral resources in Australia
comply with the JORC Code. Investors outside Australia should note that while ore reserve and mineral resource
estimates of the Company in this presentation comply with the JORC Code, they may not comply with the relevant
guidelines in other countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of
Disclosure for Mineral Projects) of the Canadian Securities Administrators or (ii) Item 1300 of Regulation S-K, which
governs disclosure of mineral reserves in registration statements filed with the US Securities and Exchange
Commission. Information contained in this Presentation describing mineral deposits may not be comparable to
similar information made public by companies subject to the reporting and disclosure requirements of other
countries. You should not assume that quantities reported as “resources” in this Presentation will be converted to
reserves under the JORC Code or any other reporting regime or that the Company will be able to legally and
economically extract them.
FINANCIAL INFORMATION
All dollar amounts are in Australian dollars unless otherwise indicated.
EFFECT OF ROUNDING
The figures in this Presentation may be subject to rounding. Accordingly, the actual calculation of these figures may
differ from the figures set out in this presentation.
DISCLAIMER
14
ballardmining.com.au
15
1. Corporate Summary
• IPO and demerger from Delta in July 2025
• $40M Pro forma cash1
2. Mineral Resource
• 10Mt @ 3.3g/t Au for 1.1Moz Au2, including
the Baldock Deposit of 930koz @ 4.1 g/t
Au2
6. Upcoming newsflow
• Ongoing drilling results
• Mineral Resource updates
• Maiden Ore Reserve
3. Exploration Potential - Grow
• October 2025 Exploration Target of
11.8 – 14.6Mt grading 2.6 – 3.9 g/t gold3
• +50 Regional Exploration Prospects
4. Baldock Fully Permitted
• Open-cut and underground mining approved
• 2.0 Mtpa Processing Plant and TSF approved
5. Project Strategy – targeting standalone scale
• Targeting initial 5-6 year Ore Reserve mid CY26
• CY26 focus on Resource Growth
INVESTMENT HIGHLIGHTS
Grow and Develop: CY26 drilling to focus on adding scale
1. Cash position at 30th September 2025 + cash from $20.6M Placement as announced to the ASX by Ballard on 28th October 2025
2. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) and the
Disclaimer and Appendix A for further information on the MRE
3. Readers should note that a Cautionary Statement applies to the disclosure of the October 2025 Exploration Target. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 21 of this Presentation for further information
regarding the October 2025 Exploration Target
ballardmining.com.au
Ownership Structure %
Delta (2 Year ASX imposed escrow)2 41.4%
Aurenne Group (6 month vol. escrow) 9.6%
Hancock Prospecting (6 month vol. escrow)3
5.6%
Mineral Resources (6 month vol. escrow)3
5.1%
Board and Management (Fully Diluted) 5.4%
16
CORPORATE SUMMARY
Broker Coverage
1. Cash positionat 30th September 2025 + proceeds from $20.6M Placement as announced to the ASX by Ballard on 28th October 2025
2. Delta Lithium is subject to a 24 month escrow from the date Ballard shares were quoted on the ASX.
3. In-specie shares transferred to Hancock Prospecting and Mineral Resources are subject to six months voluntary escrow from the date of issue and further six months orderly market restriction.
Corporate Structure
Shares on Issue 378 Million
Performance Rights & Options 22 Million
Share Price (27/11/25) $0.655
Market Capitalisation ~$ 250 Million
Proforma Cash1
$ 40 Million
Board and Key Management Personnel (previous roles)
Chair Simon Lill (De Grey)
Managing Director Paul Brennan (Saracen, Calidus)
Executive Director Tim Manners (Ramelius, Wildcat)
Non-Executive Director James Croser (Spectrum, Delta)
Non-Executive Director Stuart Mathews (Gold Fields)
Company Secretary Loren Falconer (MACA, PLS)
Geology Manager Todd Hibberd (Newmont)
ballardmining.com.au
Sources: S&P Capital IQ, ASX Filings,
Company Websites, Argonaut Equity
Research Estimates
Vault Minerals (ASX:VAU)
~$5B Market Cap
$30M1 Exploration Budget
Genesis Minerals (ASX: GMD)
~$7B Market Cap
$40-$50M2 Exploration Budget
Ora Banda Mining (ASX: OBM)
~$2B Market Cap
$73M3 Exploration Budget
Aurenne Group (Private)
1.8 Mtpa Plant
17
01 OPTIONALITY. Has to beat ‘Plan A’
1. Refer to the ASX Announcement lodged by Vault (ASX:VAU) on the 22nd September 2025 “FY26 guidance and three year outlook” for more informationregarding Vault FY26 Exploration budget
2. Refer to the ASX Announcement lodged by Genesis (ASX:GMD) on the 21st August 2025 “FY25 results and outlook” for further informationregarding Genesis FY26 Exploration budget
3. Refer to the ASX Announcement lodged by Ora Banda (ASX:OBM) on the19th November 2025 “AGM Presentation”for further information regarding Ora Banda FY26 Exploration budget
ballardmining.com.au
FY26 FY27 FY28
Sep Q Dec Q Mar Q Jun Q Sep Q Dec Q Mar Q Jun Q Sep Q Dec Q Mar Q Jun Q
Develop 930koz1 Baldock
BALDOCK INFILL DRILLING (complete Dec’25)
BALDOCK GEOTECH
METALLURGY + PROCESS PLANT STUDY
MRE UPDATE & BALDOCK MAIDEN RESERVE
Grow existing 1.1Moz1 Resource base
GROWTH DRILLING
RESOURCE CONVERSION DRILLING (INFILL)
MRE UPDATES (Including Exploration Target2
)
Final Investment Decision
~70 km logged
~4 km of Geotech core
~53 t of sample collected
Growth targeted via Baldock Extensional (60%) & 53 x Exploration Targets (40%)
De-risking Prod Yrs 7-10
18
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated
17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
2. Readers should note that a Cautionary Statement applies to the disclosure of the October 2025 Exploration Target. Please refer to the “Statement of Exploration Target at Mt Ida” slide on page 21 of this
Presentation for further information regarding the October 2025 Exploration Target
3. This statement of the Company's goal of [targeting 400-500koz Reserve / increasing the currently stated MRE to targeting 1.5Moz-2Moz MRE] longer term is an aspirational statement, and the Company does not yet
have reasonable grounds to believe the statement can be achieved
02 ‘PLAN A’: Initial 5-6 year Ore Reserve,
CY26 focus is to GROW mine plan to ~8-10 years
FID window
Targeting3 400 – 500koz Reserve, supporting initial 5-6 Year Mine Life
Targeting3 1.5Moz - 2.0Moz MRE to
support ~8-10 year Mine Life
ballardmining.com.au
• Approved Mining Proposal and Mine Closure
Plan for Open Pit and Underground Mining at
Baldock
• Works Approval granted for 2.0 Mtpa Process
Plant and TSF
• Approved Native Vegetation Clearing Permit
• 3.7 GL/yr groundwater license (GWL)
• 3.7 GL/yr supports ~3.7 Mtpa Processing
• 3 x production bores installed
• GENUINE SHOVEL READY PROJECT
19
03 FULLY PERMITTED.
Fundamental differentiator from other gold developers
Construction of Production Bore in the Lake Raeside Paleochannel to support 2.5 GL/yr license
ballardmining.com.au
October 2025
Exploration Target
ballardmining.com.au
IMPORTANT: You must read the following before continuing.
The October 2025 Exploration Target reported for the Mt Ida Gold Project excludes and is in addition
to the Mt Ida Mineral Resource Estimate1 of 10.3Mt @ 3.3 g/t gold for 1.1Moz.
The October 2025 Exploration Target based on current2 and historical2 exploration results is
reported as:
11.8 – 14.6Mt grading 2.6 – 3.9 g/t gold:
Cautionary Statement:
The potential quantity and grade of the October 2025 Exploration Target is conceptual in nature.
There has been insufficient exploration to estimate a Mineral Resource within the October 2025
Exploration Target, and it is uncertain if further exploration will result in the estimation of a Mineral
Resource. The October 2025 Exploration Target has been prepared and reported by Ballard, in
accordance with the Australasian Code for the Reporting of Exploration Results, Mineral Resources,
and Ore Reserves, 2012 Edition (“JORC Code”).
21
OCTOBER 2025 EXPLORATION TARGET BASIS
The October 2025 Exploration Target presented are based on the following information and assumptions:
• The existing Mt Ida Mineral Resource estimate of 10.3 Mt at 3.3 g/t containing 1.1 Moz1 of gold, noting
that the October 2025 Exploration Target is separate from and in addition to this Mineral Resource
Estimate.
• Geological information indicating that mineralisation persists at depth below existing deposits as
confirmed by deeper drilling.
• Encouraging gold assay results returned from exploration drilling over several km of strike and to a
depth of ~120m.
• A gold grade range of the October 2025 Exploration Target calculated from the significant number of
drill intercepts returned from the existing drilling database.
• The volume range (tonnages) of the October 2025 Exploration Target defined by modelling existing
deposits to depth and along strike where drilling shows mineralisation.
• October 2025 Exploration Target ounces output ranges rounded to reflect the conceptual nature of
the calculations.
Tonnes (Mt)
Low
Tonnes
(Mt) High
Grade
(g/t Au)
Low
Grade
(g/t Au)
High
11.8 14.6 2.6 3.9
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission(“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further informationon the MRE
2. Refer to Appendix B for a table of all previous drill results
COMPETENT PERSON STATEMENT
Information in this Presentation that relates to October 2025 Exploration Target is based on, and fairly represents, information and supporting documentation prepared by Todd Hibberd, a
Competent Person who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Hibberd has sufficient experience that is relevant to the style of mineralisation and type of
deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the JORC Code. Mr Hibberd is an employee of the Company and has
performance incentives associated with the successful development of the Company’s Mt Ida Project. Mr Hibberd consents to the inclusion in this Presentation of the matters based on his
information in the form and context in which it appears.
04 Statement of Exploration Target
ballardmining.com.au
22
• Mt Ida considered analogous to the +10Moz Agnew gold camp (~150km
north) by renowned Structural Geologist Dr Sarah Jones
• Orogenic orebodies typically“plumb deep”
o Agnew 1.4km deep1 mine. ~150km north
o Genesis’ Gwalia Underground +1.5km2 deep mine. ~80km east
o Ora Banda’s Riverina Deeps +1km3 deep mineralized system. ~80km
south
• Agnew and Ora Banda are located on same greenstone belt
• Structural Review identified additional 35 targets in addition to initial 18
targets based on historical UG workings and high grade rock chips
• Planned work:
o Geophysics (down hole and surface) to inform deeper drilling
o Surface electromagentic survey currently underway
o Systematic drilling throughout all of CY2026
1. Reference Gold Fields Analyst and Investor Site Visit 2022
2. Refer to the ASX Announcement lodged by Genesis (ASX:GMD) on the 1st September 2025 “Corporate Presentation - Long Ore” for further informationregarding the depth of the Gwalia Mine
3. Refer to the ASX Announcement lodged by Ora Banda (ASX:OBM) on the 23rd October 2025 “Outstanding Drill Results at Little Gem and Riverina” for further information regarding the depth of the mineralization
system at Riverina Deeps
04 STRUCTURAL REVIEW
Swallow the Elephant one bite at a time
ballardmining.com.au
23
THE BEST SPOT TO FIND A NEW MINE…
04
Top 300m
averages
~2,500 oz
Per
vertical
metre,
function of
drilling
…is at an existing FULLY PERMITTED mine. Orogenic Deposits Plumb Deep
1. Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with A
Share your feedback
Discover