Growth Results and Final Baldock Results - Supplementary
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 3rd
February 2026
First Mt Ida Extensional and Exploration Results for 2026
Supplementary Announcement
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) refers to the Company’s
announcement dated 2nd
February 2026 “First Mt Ida Extensional and Exploration Results for 2026”.
The Company now provides the attached JORC Table 1 disclosure to be read in conjunction with that
announcement.
-ENDS-
This announcement has been authorised for release to the ASX by Paul Brennan, Managing
Director and CEO.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Executive Director
info@ballardmining.com.au
2
ASX: BM1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Lithium Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered to be
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
3
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling, TopDrill & PXD, RC
drilling utilised an Explorac 220RC rig, T66
Schramm RC Rig with a 143 mm face sampling
hammer bit, DD drilling was completed by a truck
mounted Sandvik DE820 and a KWL 1500 and has
been a combination of PQ2, HQ2 and NQ2
diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
in full
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
4
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• Ballard have recently amended the Photon
methodology to carry out analysis on Pulverised
material rather than crushed material, studies
suggest the results are comparable.
• RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
• The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
• Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
• Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
• Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
5
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Samples have been analysed by external
laboratories utilising industry standard methods
• The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
• Photon assay is a non-destructive total analysis
technique
• Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
• QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
• All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
• Limited historic QAQC data has been supplied,
industry standard best practice is assumed
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel. The use
of twinned holes. Documentation of
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
• Significant intercepts have been reviewed by
senior personnel
• No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
• Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data was supplied in various
formats and has been validated as much as
practicable
• No adjustments to assay data have been made
• Data entry, verification and storage protocols
remain unknown for historic operators
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation. Specification of
the grid system used. Quality and
adequacy of topographic control
• MGA94 zone 51 grid coordinate system is used
• Current drilling collars have been pegged using a
DGPS unit, all collars will be surveyed upon
program completion by an independent third
party
• All infill drill holes are pegged using a DGPS for
maximum accuracy
• Downhole surveys are completed by the drilling
contractors using a true north seeking gyro
instrument, AC drillholes did not have downhole
surveys carried out
• Topography has been surveyed by recent
operators. Collar elevations are consistent with
surrounding holes and the natural surface
elevation
• Historic collars are recorded as being picked up
by DGPS, GPS or unknown methods and utilised
the MGA94 zone 51 coordinate system
• Historic downhole surveys were completed by
north seeking gyro, Eastman single shot and multi
shot downhole camera
6
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied. Whether sample compositing
has been applied.
• Drill hole spacing is variable throughout the
program area
• Spacing is considered appropriate for this style of
exploration
• Sample compositing has not been applied
Orientation of
data in relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type. If
the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material
• Drill holes are orientated perpendicular to the
regional trend of the mineralisation previously
drilled at the project; drill hole orientation is not
considered to have introduced any bias to
sampling techniques utilised
• Some drillholes previously targeting Lithium
mineralisation were not optimal for the Gold but
this has been taken into account for modelling
and statistics
• Where intercepts are not perpendicular, this will
be illustrated in the announcement /figures
Sample security The measures taken to ensure sample
security
• Samples are prepared onsite under supervision
of Ballard Mining staff and transported by a third
party directly to the laboratory
• Historic sample security measures are unknown
Audits or reviews The results of any audits or reviews of
sampling techniques and data.
• None carried out
JORC Table 1; Section 2: Reporting of Exploration Results
Criteria Explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location
and ownership including agreements or
material issues with third parties such as
joint ventures, partnerships, overriding
royalties, native title interests, historical
sites, wilderness or national park and
environmental settings. The security of
the tenure held at the time of reporting
along with any known impediments to
obtaining a licence to operate in the area
• Drilling and sampling activities have been carried
on M29/2, M29/165 and E29/640, M29/444,
M29/422, E29/771 and M29/94
• The tenements are in good standing
• There are no heritage issues
Exploration
done by other
parties
Acknowledgment and appraisal of
exploration by other parties.
• The area has a long history of gold and base
metals exploration and mining, with gold being
discovered in the district in the 1890s. Numerous
generations of exploration and mining have been
completed including activities such as drilling,
7
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
geophysics and geochemical sampling
throughout the tenure
Geology Deposit type, geological setting and style
of mineralisation.
• The Mt Ida project is located within the Eastern
Goldfields region of Western Australia within the
Mt Ida/Ularring greenstone belt
• Locally the Kurrajong Antiform dominates the
regional structure at Mount Ida, a south-
southeast trending, tight isoclinal fold that
plunges at a low angle to the south. The Antiform
is comprised of a layered greenstone sequence of
mafic and ultramafic rocks
• Late stage granitoids and pegmatites intrude the
sequence
• These later stage pegmatites intrude through the
pre-exiting Gold lodes and other stratigraphy.
• The intrusion of this Granitoid resulted in the
greenstone sequence being overturned with the
Western sequence dipping to the West and the
Eastern limb dipping to the East.
• Gold mineralisation has been identified in a
number of styles, primarily being shear hosted
structures with sulphide development +/- Quartz.
• These mineralised shears often form along the
plane of weakness between lithology contacts
however can also form independent of any
contacts which are likely later stage reactivations.
• The Mt Ida Project has a structural complex
history with a number of deformational events.
Drill hole
Information
A summary of all information material to
the understanding of the exploration
results including a tabulation of the
following information for all Material drill
holes: easting and northing of the drill
hole collar elevation or RL (Reduced
Level – elevation above sea level in
metres) of the drill hole collar dip and
azimuth of the hole down hole length and
interception depth hole length. If the
exclusion of this information is justified
on the basis that the information is not
Material and this exclusion does not
detract from the understanding of the
report, the Competent Person should
clearly explain why this is the case.
• A list of the drill hole coordinates; orientations
and metrics are provided in the Appendix when
applicable
Data
aggregation
methods
In reporting Exploration Results,
weighting averaging techniques,
maximum and/or minimum grade
truncations (eg cutting of high grades)
and cut-off grades are usually Material
and should be stated. Where aggregate
intercepts incorporate short lengths of
high grade results and longer lengths of
• No metal equivalents are used
• Significant intercepts are calculated with a cut-off
grade of 0.5 ppm Au
8
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
low grade results, the procedure used for
such aggregation should be stated and
some typical examples of such
aggregations should be shown in detail.
The assumptions used for any reporting
of metal equivalent values should be
clearly stated.
Relationship
between
mineralisation
widths and
intercept
lengths
These relationships are particularly
important in the reporting of Exploration
Results. If the geometry of the
mineralisation with respect to the drill
hole angle is known, its nature should be
reported. If it is not known and only the
down hole lengths are reported, there
should be a clear statement to this effect
(eg ‘down hole length, true width not
known’).
• The geometry is reasonably well understood while
the mineralisation is drilled perpendicular in most
cases
• There are still some variations in the
mineralisation making exact calculations of true
width difficult in most cases at present
• If an intercept is drilled obliquely and thickness is
not representative, this will be stated in the
announcement / figure.
Diagrams Appropriate maps and sections (with
scales) and tabulations of intercepts
should be included for any significant
discovery being reported These should
include, but not be limited to a plan view
of drill hole collar locations and
appropriate sectional views.
• Figures are included in the Prospectus,
presentation or announcement
Balanced
reporting
Where comprehensive reporting of all
Exploration Results is not practicable,
representative reporting of both low and
high grades and/or widths should be
practiced to avoid misleading reporting
of Exploration Results.
• All new or unreported drill collars, and significant
intercepts are generally reported in an Appendix
when applicable.
• A review of the Mt Ida database has been
completed, and all historical drill intercepts and
surface samples have been included in the
announcement “ ASX Mt Ida Drill Program
Underway dated 22nd
July 2025”.
Other
substantive
exploration data
Other exploration data, if meaningful and
material, should be reported including
(but not limited to): geological
observations; geophysical survey results;
geochemical survey results; bulk
samples – size and method of treatment;
metallurgical test results; bulk density,
groundwater, geotechnical and rock
characteristics; potential deleterious or
contaminating substances.
• Extensive metallurgical test programs have been
completed with results being reported to the ASX
previously.
• Two phases of Geotechnical analysis have been
completed for both OP and UG mining methods.
Further work The nature and scale of planned further
work (eg tests for lateral extensions or
depth extensions or large-scale step-out
drilling). Diagrams clearly highlighting the
areas of possible extensions, including
• Drilling has been ongoing at Mt Ida with RC and
diamond rigs completing infill and exploration on
Au lodes.
9
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
the main geological interpretations and
future drilling areas, provided this
information is not commercially
sensitive.
Share your feedback
Discover