Ballard's Grow and Develop strategy set to deliver in 2026
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 13th Jan 2026
Mt Ida Resource Growth and Development Update
Grow and Develop Strategy delivering milestones in 2026
• Drilling has resumed at the Mt Ida Gold Project
• Phase 1 Infill drilling completed at 930 koz @ 4.1 g/t1
Baldock
o 86,000 drill metre program completed in December 2025
o Results to date have been confirmatory2
o Updated JORC Resource late Q1, CY26
o Feasibility level Geotechnical and Metallurgy studies ongoing
o Baldock Maiden Ore Reserve due Q2, CY26
• 2026 drilling focus is Resource Growth targeted from both
Baldock extensions and 53 Regional Targets
o Ballard workforce incentivised to achieve 1.5 Moz and 2.0 Moz MRE
milestones
o Leverage off the fully permitted Baldock deposit for incremental
growth
o 2025 Baldock Infill drilling completed to 350 m depth. 2026 drilling
program to target extensions to 350 m – 750 m depth
o Systematically work through 53 exploration targets which includes
both existing resources and new regional prospects identified in 2025
• Site activities steady state
o Project knowledge continues to grow due to a stable geological team
and continuity of drilling contractors
Commenting on Ballard’s plan for 2026, Managing Director Paul Brennan said:
“Ballard is in a very fortunate position as we commence our planned activities in 2026. Mt Ida
is fully permitted for mining, processing and water abstraction. The Company remains well
funded and the strategy for 2026 is to add scale to the existing 1.1 Moz1
Resource at Mt Ida.
We are entering a very exciting period for the Company. We expect regular news flow as assay
results are returned from both Baldock extensional and the regional exploration targets, as well
as deliver multiple project development milestones”.
1
Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”)
and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025)
2
Refer Appendix B for previous ASX Announcements lodged by Ballard in relation to Infill Drilling Results
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
the 2026 planned activities at its Mt Ida Gold Project, located 540km northeast of Perth in the
Goldfields region of Western Australia (Figure 5). The Mt Ida Gold Project covers 26km of
prospective greenstone belt, folded around the Copperfield Granite (Figure 4).
Ballard is pursuing a dual stream Resource Growth and Project Development strategy. The
Company is aiming to announce mid-year a Maiden Ore Reserve at Baldock that underpins an
initial 5-6 year mine life and a defined pathway to deliver longer mine life for a standalone
operation. Baldock OreReserve workstreams are ongoing and theCompany’s focus for thenext
12 months is Resource Growth (extensional and regional) to add scale.
Planned Exploration Workstreams
During 2026, Ballard Mining will advance its strategy of rapid resource growth via extensive step
out drilling around the existing large scale gold resource at Baldock and delineating new maiden
Mineral Resource Estimates (“MRE”) across the Mt Ida Gold Project. The program is designed
to extend potential mine life, grow project scale and create multiple future development
options.
Exploration activity in 2026 will be delivered through a two-stream approach:
• Exploration effort directed toward resource growth along strike and at depth at the
existing 930 koz at 4.1 g/t3
Baldock Gold Deposit; and
• Exploration effort will be focused on regional resource growth at Kestrel, Golden Vale,
West Knell and Bombay (164 koz3
) with additional drilling focused on identification of
new maiden resource opportunities across Ballard’s broader landholding. Initial proof
of concept drilling at new maiden MRE opportunities during 2025 included Neptune (23
m @ 1.8 g/t from 21 m4
), Astro (8 m @ 1.8 g/t from 30 m5
) and Pluto (5 m @ 9.4 g/t from
46 m6
).
This balanced approach allows the Company to advance its most developed asset in Baldock,
while continuing to build long-term value through proving up earlier stage resource
opportunities and making new discoveries. The work streams are supported by a series of
current and planned contemporary exploration methods including:
• Structural review of recently acquired high resolution aeromagnetics and interpretation
of regional geology that has identified the main mineralised corridors and structures;
• Geochemical review of existing datasets with further geochemical and spectral
analysis of drill and surface rock samples where required; and
• Surface and downhole geophysics (electromagnetic) which can accurately identify the
3D position of conductive sulphides (chalcopyrite, pyrrhotite, pyrite) that are
associated with gold mineralisation.
3
Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”)
and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025)
and the Disclaimer and Appendix A for further information on the MRE
4
Refer ASX Announcement lodged by Ballard on 15 September 2025 for further information
5
Refer ASX Announcement lodged by Ballard on 14 October 2025 for further information
6
Refer ASX Announcement lodged by Ballard on 15 December 2025 for further information
3
ASX: BM1
ballardmining.com.au
Figure 1 - Mt Ida Planned Workstreams H2FY26 and FY27 7
Baldock Growth
During 2026, extensive resource growth drilling will be conducted at the Baldock gold deposit
targeting the entire 3-kilometre strike length below the current drilling which on average is only
350 metres deep (Figure 2). The aim of the drilling is to substantially increase the existing
Baldock resource, targeting 350 – 750 m depth (refer Figure 2 – “Panel 2”).
Leveraging off Baldock is a logical strategy as Baldock is fully permitted for both open pit and
underground mining. Baldock is expected to be predominantly an underground mine. Once the
decline, ventilation, escapeway network, power and other services are established, the
extraction of additional identified resources becomes an incremental opportunity.
Baldock is planned to provide the base-load feed for Mt Ida, with the proposed Process Plant
located adjacent to the Baldock mine under the approved Mining Proposal and Works Approval
(Figure 3).
7
Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”)
and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025)
and the Disclaimer and Appendix A for further information on the MRE
4
ASX: BM1
ballardmining.com.au
Figure 2 - Long section of the Baldock trend showing drill density and more importantly, the vast undrilled
area's below current drilling. The deeper sections of the MRE outline were informed by Lithium drilling7
.
Figure 3 - Plan View of Mt Ida Development Footprint as per the Company’s approved Mining Proposal
Proposed
Plant Site
Village
Proposed TSF
Waste Dump
ROM Pad
Mine Footprint
5
ASX: BM1
ballardmining.com.au
Regional Resource Growth and Exploration Targets
Additional drilling will focus on the identification of new resource opportunities across Ballard’s
broader landholding (e.g. Neptune, Astro and Pluto) via systematic testing of all 53 exploration
targets (Figure 4). The targets have been prioritised based on known mineralisation, structural
prospectivity, geochemical anomalism andgeophysical signatures where alteration associated
with mineralisation can often be identified.
Figure 4 - Aeromagnetic image showing the existing 53 exploration targets within Ballard Mining’s tenure8
8
Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission
(“ASIC”) and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and
dated 17 June 2025) and the Disclaimer and Appendix A for further information on the MRE
6
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3
million tonnes @ 3.3 g/t Au for 1.1 million ounces9
of contained gold. The Baldock deposit,
which hosts 930 koz @ 4.1 g/t9
forms the basis for initial development opportunities at Mt Ida.
Figure 5 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tails Storage Facility has been received as
well as a granted 3.7 GL/yr water abstraction license.
-END-
9
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
7
ASX: BM1
ballardmining.com.au
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open cut and underground mining approvals with a Works Approval for a 2.0 Mtpa Processing Plant and Tailings Storage
Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the current MRE and
increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
8
ASX: BM1
ballardmining.com.au
Appendix A: April 202510
Mineral Resource Estimate
10
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Baldock 2,600 4.5 365 1,570 3.6 200 4,120 4.2 563
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Mt Ida Tailings - - - 500 0.5 8 500 0.5 8
Baldock 242 4.8 37 2,610 4.0 338 2,850 4.0 368
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3.0 3 30 3.0 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
Baldock 2,840 4.5 402 4,220 3.9 532 7,000 4.1 930
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Mt Ida Tailings 500 0.5 8 500 0.5 8
Total 2,840 4.5 402 7,500 3.0 699 10,310 3.3 1,102
Total
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Cut off Deposit
Indicated Inferred
9
ASX: BM1
ballardmining.com.au
Appendix B: Previous ASX Announcements
This announcement contains information extracted from ASX market announcements reported in
accordance with the JORC Code. Further details (including JORC Code reporting tables where
applicable) of Infill results referred to in this announcement can be found in the following
announcements lodged on the ASX:
Title Date
Infill Drilling delivers outstanding widths and grades 22 December 2025
Infill drilling results at Baldock delivers more high-grade 18 November 2025
Infill drill results continue to confirm high grade Baldock 20 October 2025
Outstanding Infill Results at Baldock 22 September 2025
High Grade Infill and Extensional Drill Results at Mt Ida 26 August 2025
First Infill Results & Exploration Commenced 31 July 2025
Share your feedback
Discover