AGM Presentation
Released
Released
Announcement PDF
HIGH-GRADE GOLD.
GROWING. PERMITTED.
DRILL & BUILD
Annual General Meeting
Managing Director Presentation
27 November 2026
ASX: BM1
DISCLAIMER
The following notices and disclaimers apply to this Presentation ("Presentation") and you are therefore advised to read this
carefully before reading or making any other use of this Presentation or any information contained in this Presentation.
This Presentation is dated 27 November 2026 and has been prepared by the Board and management of Ballard Mining
Limited ("Ballard" or the "Company").
SUMMARY INFORMATION ONLY
The information in this Presentation is summary information only and is current as at the date of this Presentation (unless
otherwise indicated), and the information in this Presentation remains subject to change without notice. The information in
this Presentation is general in nature and does not purport to be accurate nor complete, nor does it contain all of the
information that an investor may require in evaluating a possible investment in Ballard, nor does it contain all the information
which would be required in a disclosure document or prospectus prepared in accordance with the requirements of the
Corporations Act 2001 (Cth) ("Corporations Act") or other legislation. It has been prepared by Ballard with due care but no
representation or warranty, express or implied, is provided in relation to the accuracy, reliability, fairness or completeness of
the information, opinions or conclusions in this Presentation by Ballard or any other party involved in its preparation, except
as required by law.
Reliance should not be placed on information or opinions contained in this Presentation and, Ballard does not have any
obligation to finalise, correct or update the contents of this Presentation, except as required by law.
This Presentation should be read in conjunction with Ballard's other periodic and continuous disclosure announcements
lodged with the ASX, which are available at www.asx.com.au.
FORWARD LOOKING STATEMENTS
This Presentation may contain forward-looking statements regarding the Company and its subsidiaries (including its
projects). Forward-looking statements may in some cases be identified by terminology such as “may”, “will”, “could”, “should”,
“expect”, “plan”, “intend”, “anticipate”, “believe”, “estimate”, “predict”, “potential” or “continue”, the negative of such terms or
other comparable terminology. These forward-looking statements are only predictions. These forward-looking statements
reflect various assumptions by or on behalf of Ballard. Accordingly, these statements are subject to significant business,
economic and competitive uncertainties and contingencies associated with the mining industry which may be beyond the
control of Ballard which could cause actual results or trends to differ materially including, but not limited to, price and
currency fluctuations, geotechnical factors, drilling and production results, development progress, operating results, reserve
estimates, legislative, fiscal and regulatory developments, economic and financial market conditions in various countries,
approvals and cost estimates, environmental risks, ability to meet funding requirements, share price volatility. Accordingly,
there can be no assurance that such statements and projections will be realised.
Actual values, results or events may be materially different to those expressed or implied in this Presentation. Given these
uncertainties, recipients are cautioned not to place reliance on forward-looking statements. Any forward-looking statement in
this Presentation is given as at the date of this Presentation. Subject to any continuing obligations under applicable law and
the ASX Listing Rules, Ballard does not undertake any obligation to update or revise any information or any of the forward-
looking statements in this Presentation or any changes in events, conditions or circumstances on which any such forward-
looking statement is based.
NOT FINANCIAL PRODUCT ADVICE
This Presentation, and the information provided in it, does not constitute, and is not intended to constitute, financial product
or investment advice, financial, legal, tax, accounting or other advice, or a recommendation to acquire any securities of
Ballard. It has been prepared without taking into account the objectives, financial or tax situation or particular needs of any
individual. Ballard is not licensed to provide financial product advice in respect of an investment in securities or otherwise.
Each investor must make its own independent assessment of Ballard before acquiring any securities in the Company.
PAST PERFORMANCE
Any information regarding past performance included in this Presentation is given for illustrative purposes only and should
not be relied upon as (and is not) an indication of Ballard's views, or that of any other party involved in its preparation, on
Ballard's future performance or condition or prospects.
NOT AN OFFER
This Presentation is not a prospectus, product disclosure statement or other offering document under Australian law or any
other law and will not be lodged with the Australian Securities and Investments Commission. This Presentation is for
information purposes only and is not an invitation, offer or recommendation with respect to the subscription, purchase or sale
of any security in Ballard, or any other financial products or securities, in any place or jurisdiction.
This Presentation has been prepared for publication in Australia and may not be released to US wire services or distributed
in the United States. This Presentation does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the
United States or any other jurisdiction where it would be illegal. The distribution of this Presentation in the United States and
elsewhere outside Australia may be restricted by law. Persons who come into possession of this Presentation should
observe any such restrictions as any non-compliance could contravene applicable.
2
ASX: BM1
DISCLAIMER
NO LIABILITY
The information contained in this Presentation has been prepared in good faith by Ballard. However, no guarantee,
representation or warranty expressed or implied is or will be made by any person (such as Ballard or its affiliates, directors,
officers, employees, associates, advisers and agents) as to the accuracy, reliability, correctness, completeness or adequacy
of any statements, estimates, options, conclusions or other information contained in this Presentation, except as required by
law.
To the maximum extent permitted by law, Ballard and its affiliates, directors, officers, employees, associates, advisers and
agents each expressly disclaims any and all liability, including, without limitation, any liability arising out of fault or
negligence, for any loss arising from the use of or reliance on information contained in this Presentation including
representations or warranties or in relation to the accuracy or completeness of the information, statements, opinions,
forecasts, reports or other matters, express or implied, contained in, arising out of or derived from, or for omissions from, this
Presentation including, without limitation, any financial information, production targets, financial forecasts, estimates or
projections and any other information derived therefrom. Statements in this Presentation are made only as of the date of this
Presentation unless otherwise stated and the information in this Presentation remains subject to change without notice. No
responsibility or liability is assumed by Ballard or any of its affiliates, directors, officers, employees, associates, advisers or
agents for updating information in this Presentation or to inform any recipient of any new or more accurate information or any
errors or omissions of which Ballard or any of its affiliates, directors, officers, employees, associates, advisers or agents may
become aware, except as required by law.
INVESTMENT RISK
An investment in Ballard is subject to investment and other known and unknown risks, some of which are beyond the control
of Ballard. Those risks and uncertainties include factors and risks specific to Ballard such as (without limitation) the status of
exploration and mining tenements and applications and the risks associated with the non-grant or expiry of those tenements
and applications, liquidity risk, risks associated with the exploration or developmental stage of projects, funding risks,
operational risks, changes to government fiscal, monetary and regulatory policies, the impact of actions of governments, the
potential difficulties in enforcing agreements and protecting assets, alterations to Resource estimates and the imprecise
nature of Resource and Reserve statements, any circumstances adversely affecting areas in which Ballard operates,
fluctuations in the production, volume and price of commodities, any imposition of significant obligations under environmental
regulations, fluctuations in exchange rates, the fluctuating industry and commodity cycles, the impact of inflation on
operating and development costs, taxation, regulatory issues and changes in law and accounting policies, the adverse
impact of wars, terrorism, political, economic or natural disasters, the impact of changes to interest rates, loss of key
personnel and delays in obtaining or inability to obtain any necessary government and regulatory approvals, insurance and
occupational health and safety. Further information regarding the risks associated with an investment in Ballard are
disclosed in Ballard’s IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and dated
30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (“IPO
Prospectus”). Ballard does not guarantee any particular rate of return or the performance of Ballard, nor does it guarantee
the repayment of capital from Ballard or any particular tax treatment.
MINERAL RESOURCE ESTIMATE (MRE)
Information in this Presentation that relates to exploration results, the data and geological interpretation used as the basis of
the mineral Resources was reported by Ballard on the 23 September 2026 and for which the consent of the Competent
Person Mr Todd Hibberd was obtained. Ballard confirms it is not aware of any new information or data that materially affects
the information included in the 23 September 2026 announcement.
Information in this Presentation that relates to the gold mineral Resource estimate at the Mt Ida Project was reported by
Ballard on the 23 September 2026, and for which the consent of the Competent Person Mr Michael Andrew and Ms Susan
Havlin was obtained. Ballard confirms it is not aware of any new information or data that materially affects the information
included in the 23 September 2026 announcement and that all material assumptions and technical parameters underpinning
the mineral Resource estimate continue to apply and have not materially changed.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in the IPO Prospectus.
JORC CODE DIFFERS FROM REPORTING REQUIREMENTS IN OTHER COUNTRIES
It is a requirement of the ASX Listing Rules that the reporting of ore reserves and mineral Resources in Australia comply with
the JORC Code. Investors outside Australia should note that while ore reserve and mineral Resource estimates of the
Company in this presentation comply with the JORC Code, they may not comply with the relevant guidelines in other
countries and, in particular, do not comply with (i) National Instrument 43-101 (Standards of Disclosure for Mineral Projects)
of the Canadian Securities Administrators or (ii) Item 1300 of Regulation S-K, which governs disclosure of mineral reserves
in registration statements filed with the US Securities and Exchange Commission. Information contained in this Presentation
describing mineral deposits may not be comparable to similar information made public by companies subject to the reporting
and disclosure requirements of other countries. You should not assume that quantities reported as “Resources” in this
Presentation will be converted to reserves under the JORC Code or any other reporting regime or that the Company will be
able to legally and economically extract them.
FINANCIAL INFORMATION
All dollar amounts are in Australian dollars unless otherwise indicated.
EFFECT OF ROUNDING
The figures in this Presentation may be subject to rounding. Accordingly, the actual calculation of these figures may differ
from the figures set out in this presentation.
3
ASX: BM1
THREE STRATEGIC PILLARS FOR CY2027
4
ASX: BM1
Drill and Build
Deliver Resource
base that supports
Standalone scale
Continue Growth &
de-risking drilling
Drilling is the cheapest form of
insurance
Complete Feasibility
Study
CORPORATE SUMMARY
Board is mix of explorers, developers and operators. Building management team for operational readiness
CORPORATE STRUCTURE
523 Million
Shares on issue
29 Million
Performance Rights & Options
A$0.56
Close of trading 26 Nov 2026
~A$293M
Market Capitalisation
~A$89M
Cash (30 Sep 2026)1
BOARD & KEY MANAGEMENT PERSONNEL
SIMON LILL
Non-Executive Chair
(ex-De Grey Mining)
PAUL BRENNAN
Managing Director
(ex-Saracen, Calidus)
TIM MANNERS
Executive Director
(ex-Ramelius, Gold Road)
STUART MATHEWS
Non-Executive Director
(ex-Gold Fields)
JAMES CROSER
Non-Executive Director
(ex-Spectrum Metals, Delta)
LOREN FALCONER
Company Secretary
(ex-MACA, PLS)
OWNERSHIP STRUCTURE
29.9%
Delta Lithium (ASX:DLI)
(escrow to 14 Jul 2027)2
8.4%
Aurenne Group
8.0%
Hancock Prospecting
6.0%
L1 Capital
1. Refer to the Ballard September Quarterly Report dated 27 October 2026 and the Ballard Announcement dated 13 November 2026 for further information
2. Delta Lithium is subject to an ASX imposed 24-month escrow from the date Ballard shares were quoted on the ASX (14 July 2025)
5
TODD HIBBERD
Chief Geologist
(ex-Newmont)
BM1
ASX
~A$204M
Enterprise value
ASX: BM1
HUGH TRIVETT
Chief Operating Officer
(ex-Ramelius, Westgold)
Paul Howard Paul Hissey
Patrick Streater
RESEARCH COVERAGE
6
PLAN A – DRILLING FOR STANDALONE SCALE
Drilling to test Resource extensions and increase Resource confidence at Mt Ida
Refer to the Ballard Announcement dated 23 September 2026 and the
Disclaimer and Appendix A for further information on the MRE
Baseload from Baldock supplemented by regional deposits
7
ASX: BM1
Deposit Feb 26 MRE (koz) Sep 26 MRE1 (koz) Increase (koz) Increase (%)
Baldock 1,006 1,363 357 35 %
West Knell 40 147 107 258 %
Golden Vale 27 124 97 359 %
Jupiter 11 29 18 164 %
Neptune - 27 27 -
Pluto - 27 27 -
Astro-Quasar - 21 21 -
Kestrel 53 53 - -
Other 45 45 - -
Total MRE 1,178 1,836 658 56 %
Phase 1 and Phase 2 development concept focused on the
existing Mineral Resource base (ignores any new discoveries)
• Phase 1: Baldock OP + regional open pits (West
Knell, Golden Vale & Kestrel – current drilling
is targeting conversion to Indicated Mineral
Resource at these deposits)
• Phase 2: Baldock UG + regional open pits (eg Jupiter,
Ayla-Pulsar-Neptune, Pluto, Astro-Quasar)
CY2026 – drilling targeting regional open pit Resources to
supplement Baldock
1. Refer to the Ballard Announcement dated 23 September 2026 and
the Disclaimer and Appendix A for further information on the MRE
PLAN A – STANDALONE.
` MRE MILESTONES
GROW AND DEVELOP 1.0 Moz 1.5 Moz 2.0 Moz 2.5 Moz 3.0 Moz
Drilling and Resource Updates
July 2025 MRE (at listing) 1.1 Moz @ 3.3 g/t1
Feb 2026 MRE 1.2 Moz @ 3.0 g/t2
Sep 2026 MRE 1.8 Moz @ 2.8 g/t3
Mar Q 2027 MRE update informed by drilling completed as of Jan 2027*
8
GOLD RESOURCE GROWTH & CONVERSION
Growth…. Growing existing Resources through extensional drilling
Conversion…. Infill drilling targeting conversion of Inferred to Indicated Mineral Resources
Legend:
Published Indicated Mineral Resources
Published Inferred Mineral Resources
Targeted Growth (adding Inferred)
Targeted Conversion (Inferred to Indicated)
1. Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) for further information
2. Refer to the Ballard Announcement dated 26 February 2026 for further information
3. Refer to the Ballard Announcement dated 23 September 2026 and the Disclaimer and Appendix A for further information on the MRE
✓
✓
✓
* Future Mineral Resource growth and conversion shown are drilling objectives only and are not Mineral Resource Estimates. There is no certainty that further drilling will result in the targeted Mineral Resource growth or conversion of
Inferred Mineral Resources to Indicated Mineral Resources
` FY27 FY28
Drill and Build Sep Q Dec Q Mar Q Jun Q Sep Q Dec Q
Drilling and MRE Updates
DRILLING
1.84 Moz MRE (Basis for Internal studies comprising Ind. & Inf. Mineral Resources)
Mar Q MRE UPDATE (Intended to inform FS & potential Maiden Ore Reserve)
Project Development
GEOTECHNICAL STUDIES – Golden Vale and West Knell
METALLURGY – Golden Vale and West Knell
FEASIBILITY STUDY & potential Maiden Ore Reserve
FREEZE PROCESS PLANT THROUGHPUT
DETAILED ENGINEERING FOR PROCESS PLANT (includes Capex / Opex for FS)
ACCOMMODATION VILLAGE CONSTRUCTION
TARGETED FINAL INVESTMENT DECISION (FID)
9
CY2027 WORKSTREAMS
Accommodation Village construction
Plant Engineering
Internal studies Feasibility Study
Regional Infill Drilling Ongoing Infill and Extensional Drilling
FS Level Regional Geotech
FS Level Regional Met
Internal studies underway on Sep 1.84 Moz MRE1 to inform Process Plant design parameters and support
commencement of detailed engineering for the Process Plant
Feasibility Study (FS) targeted for mid-CY2027
D
G
M
FS
E
V
✓
FID FID WINDOW
MRE
MRE
P
1. Refer to the Ballard Announcement dated 23 September 2026 and the Disclaimer and Appendix A for further information on the MRE
BALDOCK – HIGH GRADE CORNERSTONE DEPOSIT
1.36 Moz @ 3.5 g/t gold, including 650 koz @ 3.9 g/t in the Indicated Mineral Resource category1
10
1. Refer to the Ballard Announcement dated 23 September 2026 and the Disclaimer and Appendix A for further information on the MRE
2. Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) for further information ASX: BM1
High-grade hits 300m along strike of the
MRE and open below 600m vertical depth
OPEN
OPEN
OPEN
Baldock named after the St Kilda footballer Darrell Baldock by Hamill Resources. Discovery hole 12m @ 13.1 g/t2
Phase 1 Development: Building Open Pit INDICATED Inventory
11
Baldock Open Pit + Golden Vale OP + West Knell OP + Kestrel OP. All on granted Mining Leases.
ASX: BM1
• Current Baldock Indicated Mineral Resource
650koz @ 3.9 g/t1
• Initial Infill programs now complete at Golden
Vale (124koz1) and Kestrel (53koz1)
• ~40,000m Infill program underway at West Knell
(147koz1). Will be completed January 2027
• Awaiting ~40,000 Assay Results to inform
Mar Q MRE update (~8 weeks worth of samples
still in the laboratory
• ~900koz of Inferred Mineral Resources
targeted by drilling to support potential
conversion to Indicated Mineral Resources2
• To watch a fly through video showing Infill
drilling programs at Golden Vale and West
Knell: https://ballardmining.com.au/link/PlddoP 3 x RC Rigs & 1 x DD undertaking infill drilling at the West Knell deposit
1. Refer to the Ballard Announcement dated 23 September 2026 and the Disclaimer and Appendix A for further information on the MRE.
2. There is no certainty that drilling will result in conversion of the targeted Inferred Mineral Resources to Indicated Mineral Resources
Phase 1 Development: Building Open Pit INDICATED Inventory
12
Recent Kestrel Infill Results1 - some of the widest intersections reported at Mt Ida (and shallow)
ASX: BM1
• 32m @ 2.4 g/t from 59m • 27m @ 1.3 g/t from 60m
1. Refer to the Ballard Announcement dated 18 November 2026 for further information
PERMITTED & INFRASTRUCTURE WORKS UNDERWAY
13
• All Mineral Resources on Granted
Mining Leases
• Approved Mining Proposal and
Mine Closure Plan for open pit and
underground mining at Baldock
• Works Approval granted for 2.0
Mtpa Process Plant and tailings
storage facility
• 3.7 GL/yr groundwater license
o Eight production bores
installed
o Will support water extraction
requirement
• Mt Ida public road diversion
complete
Resource grade + Permitting status is our fundamental differentiator from other gold developers
Mt Ida public road diversion complete. Diverts
existing road to east around Baldock mining area
ASX: BM1
Production bore background and
monitoring bore foreground
INVESTMENT HIGHLIGHTS
Drill and Build
PRIME LOCATION
Heart of the WA
Eastern Goldfields with
+15Mtpa processing
capacity and deep
orebodies proximal
PERMITTED
All Mineral Resources
on granted Mining
tenure and permits
in place for 2.0 Mtpa
process plant
1.84 Moz &
GROWING
+1.84 Moz MRE
including +1.36 Moz at
the Baldock deposit
STANDALONE
SCALE
Building Resource scale
and confidence for a
long-life standalone
development
MULTIPLE
VALUE DRIVERS
Ongoing drill results,
Feasibility Study &
potential Maiden Ore
Reserve targeted
mid-CY2027
14
PROVEN TEAM
Experienced gold
mine developers and
operators with strong
alignment to growth
strategy
ASX: BM1
ballardmining.com.au
STRICTLY CONFIDENTIAL | DRAFT
15
Appendix A
Mineral Resource
Estimate
Cut-off` Deposit
Indicated Inferred Total
Tonnes (kt) Grade (g/t Au) Ounces (koz) Tonnes (kt) Grade (g/t Au) Ounces (koz) Tonnes (kt) Grade (g/t Au) Ounces (koz)
Open Pit (OP)
0.5g/t Au
Baldock 3,530 3.9 437 1,010 2.5 79 4,540 3.5 516
Kestrel 940 1.6 48 940 1.6 48
Golden Vale 2,363 1.6 124 2,363 1.6 124
Bombay 711 1.3 30 711 1.3 30
West Knell 1,638 2.6 138 1,638 2.6 138
Jupiter 496 1.8 29 496 1.8 29
Neptune 501 1.5 25 501 1.5 25
Pluto 289 2.9 27 289 2.9 27
Astro - Quasar 412 1.6 21 412 1.6 21
Lunar 29 2.1 2 29 2.1 2
Saturn 46 1.3 2 46 1.3 2
Tailings 500 0.5 8 500 0.5 8
Subtotal (OP) 12,465 2.4 970
Underground (UG)
1.5g/t Au (Baldock) and
1.3 g/t Au (Others)
Baldock 1,608 4.1 210 6,050 3.3 637 7,658 3.4 847
Kestrel 80 1.9 5 80 1.9 5
Bombay 30 3.1 3 30 3.1 3
West Knell 121 2.3 9 121 2.3 9
Neptune 23 2.9 2 23 2.9 2
Subtotal (UG) 7,912 3.4 866
All
Baldock 5,138 3.9 647 7,060 3.2 716 12,198 3.5 1,363
Kestrel 1,020 1.6 53 1,020 1.6 53
Golden Vale 2,363 1.6 124 2,363 1.6 124
Bombay 740 1.4 33 740 1.4 33
West Knell 1,759 2.6 147 1,759 2.6 147
Jupiter 496 1.8 29 496 1.8 29
Neptune 524 1.6 27 524 1.6 27
Pluto 289 2.9 27 289 2.9 27
Astro – Quasar 412 1.6 21 412 1.6 21
Lunar 29 2.1 2 29 2.1 2
Saturn 46 1.3 2 46 1.3 2
Tailings 500 0.5 8 500 0.5 8
Total 5,138 3.9 647 15,238 2.4 1,189 20,376 2.8 1,836
MINERAL RESOURCE ESTIMATE – SEPTEMBER 2026¹
1. Refer to the Ballard Announcement on 23 September 2026 and the Disclaimer for further information on the MRE 16
ASX: BM1
Share your feedback
Discover