More Shallow High Grade Regional Results
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 01 April 2026
More Shallow High Grade Regional Results
Targeting additional open pit feed to supplement Baldock
• Resource extension drilling results from West Knell – Europa on
the Ballard Fault
o 5 metres at 10.0 g/t gold from 83 metres in WKEX071
o 3 metres at 2.8 g/t gold from 185 metres in WKEX067
o 3 metres at 2.7 g/t gold from 54 metres in EUEX011
o 2 metres at 5.6 g/t gold from 107 metres in EUEX006
o Drilling extends and potentially links mineralisation between West
Knell and Europa increasing total strike length to 1,100 metres
o Further results pending and additional drilling planned prior to MRE
upgrades
o West Knell has existing Inferred resource of 420kt @ 2.9 g/t for
40,000oz1
• Ballard’s strategy is baseload feed from +1Moz1
Baldock deposit
with additional production uplift from satellite open pits
o West Knell - Europa located 7km from proposed fully permitted
central processing facility at Baldock
o West Knell returned 10 metres at 6.4 g/t from 28 metres in February2
o Mining Lease applications in progress both for West Knell and
Bombay (north of Baldock on the Baldock Thrust)
• Awaiting assay results from deeper diamond drilling at Baldock
o Encouraging visual results in the diamond core
Commenting on Ballard’s active Growth program, Managing Director Paul Brennan said:
“We are pleased to report that regional assay results from Mt Ida continue to highlight the
potential for multiple open pit ore sources to complement the main Baldock high grade
resource.
The visual results from the deeper drilling at Baldock are encouraging, and we eagerly await
assay results from ongoing diamond drill programs to confirm gold mineralisation at depths
below the current resource outline”.
1
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
2
Refer to the ASX Announcement lodged by Ballard on 2 February 2026 for further information
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
progress at the Mt Ida Gold Project, including the recent drilling at its regional prospects.
Ballard is pursuing a dual stream Resource Growth and Project Development strategy and
aiming to announce a Maiden Ore Reserve at Baldock mid-year. The Company’s focus for
CY2026 is Resource Growth to deliver production uplift in addition to Baldock, as well as a
longer mine life for a standalone operation.
The Mt Ida Gold Project is located 540km northeast of Perth in the Goldfields region of Western
Australia (Figure 1). The Mt Ida Gold Project covers 26km of prospective greenstone belt, folded
around the Copperfield Granite (Figure 2).
Figure 1 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
3
ASX: BM1
ballardmining.com.au
Figure 2 – Mt Ida Project showing Baldock and regional resources
13km
Ballard
Fault
4
ASX: BM1
ballardmining.com.au
Growth Drilling Update
The Company currently has seven drill rigs operating at Mt Ida – three Diamond Drill (DD), three
Reverse Circulation (RC) and one air-core rig. Results from this growth drilling program will
inform updated MRE(s) planned for H2CY2026. This will then be used as the basis for the
Company’s Definitive Feasibility Study (DFS).
One RC rig is completing pre-collars at Baldock, with the DD rigs undertaking deeper holes
targeting 350-750m depth (Figure 5).
A second RC rig is drilling the northern extension of Baldock (Nebula prospect) to depths from
100-450m, extending mineralisation to the northwest.
The third RC rig is completing phased drilling programs on the high priority regional exploration
prospects. This drilling is deliberately targeting satellite open pit feed for additional production
uplift to complement expected baseload feed from Baldock.
The air-core rig is undertaking water exploration for planned additional production bores and
reconnaissance drilling across the broader 460km2
tenement package.
Regional Resource Growth
DuringMarch 2026,regional resource growth drilling hasbeen carried out along theBallard fault
zone at West Knell, Europa, and Golden Vale. Further drilling has also been carried out at Astro-
Quasar on the Baldock Thrust shear zone. Drilling consisted of 54 drill holes for 6,534 metres.
Drill results for West Knell, Europa are discussed below. Golden Vale and Astro – Quasar
samples are currently at the laboratory and assays will be reported as they are received.
More high-grade gold intersections at West Knell – Europa
The West Knell deposit currently has an Inferred resource of 420kt at 2.9 g/t gold containing
40koz3
of gold that occurs as a series of stacked north-south moderately east dipping shear
zones comprised of quartz and sulphides within an alteration zone of silica, biotite and chlorite.
The host rock is anorthosite, a plagioclase rich differentiated gabbro sill.
The style of mineralisation is strikingly similar to Baldock. The Europa prospect is around 500
metres south of West Knell and consists of similar mineralisation also hosted in anorthosite.
Recent drilling has extended the West Knell mineralisation south and the Europa mineralisation
north. It is probable that the two prospects are linked, which would increase the mineralised
trend to 1,100 metres (Figure 3). Better results for this drilling include:
• 5 metres at 10.0 g/t gold from 83 metres in WKEX071
• 3 metres at 2.8 g/t gold from 185 metres in WKEX067
• 3 metres at 2.7 g/t gold from 54 metres in EUEX011
• 2 metres at 5.6 g/t gold from 107 metres in EUEX006
The full assay results table is set out in Appendix B.
3
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
5
ASX: BM1
ballardmining.com.au
There are a substantial number of holes awaiting assay results and the Company has also
planned further drilling based on the results received in this announcement. Once further
drilling is completed the Company will update the Mineral Resource Estimate.
Figure 3 - Plan view of the West Knell and Europa prospect showing drilling results from this
announcement
6
ASX: BM1
ballardmining.com.au
Figure 4 - Cross section along WKEX071 showing mineralised zones and new intersections
7
ASX: BM1
ballardmining.com.au
Baldock Extensional Drilling
Baldock drilling is targeting the 350 – 750m panel below the existing +1Moz4
Resource which
has been drilled to an Indicated resource category for the top 350m (Figure 5). The Indicated
Resource within the top 350m is 669koz at 3.7 g/t4
.
Figure 5 - Long section of the Baldock Mineral resource showing mineral resources and preliminary
open pit (grey) and underground (blue) mining designs that were used to inform the infill drilling program
TheCompany is currentlyawaiting assay resultsbutcan confirmthatdrilling over thelast month
has continued to intersect mineralised zones that are typical of the Baldock deposit, containing
visible sulphides (pyrite, pyrrhotite, chalcopyrite) and quartz (Figure 6).
Forty pre-collars have been cleared for deeper diamond holes designed to test Baldock to 750
metres vertical. Approximately half these holes have a second hole (wedge) drilled from the
same collar position. To date, sixteen pre-collar and two diamond tails have been completed at
Baldock.
Cautionary Statement: Visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades
are the factor of principal economic interest
4
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
8
ASX: BM1
ballardmining.com.au
Figure 6 - Core photo left from EMEX024: 351- 355 metres showing mineralised zone containing quartz
and sulphides within intensely sheared anorthosite. Core photo right from EMEX024: 525- 529.7 metres
showing mineralised zone containing quartz and sulphides within sheared plagioclase rich anorthosite
9
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 12.2
million tonnes @ 3.0 g/t Au for 1.2 million ounces5
of contained gold (Inferred and Indicated).
The Baldock deposit, which hosts 1.0Moz @ 3.5 g/t5
forms the basis for initial development
opportunities at Mt Ida.
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tailings Storage Facility has been received
as well as granted 3.7 GL/yr water abstraction licences.
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Executive Director
info@ballardmining.com.au
5
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
10
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset
towards production. With current JORC compliant resources of 12.2Mt @ 3.0 g/t Au, strong balance sheet and an
experienced team driving the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area
has received full open cut and underground mining approvals with a Works Approval for up to 2.0 Mtpa Processing
Plant and Tailings Storage Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to
increase confidence in the current MRE and increase the global resource inventory via an aggressive exploration
program. All modifying factors will be advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd
Hibberd, a Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr.
Hibberd has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a ‘Competent Person’ as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’ (“JORC
Code”). Mr. Hibberd consents to the inclusion in this announcement of the matters based on his information in the
form and context in which it appears.
The information in this report which relates to Mineral Resources for the Baldock gold deposit at the Mt Ida Gold
Project was prepared by Michael Andrew an employee of Snowden Optiro. Mr Andrew is a Fellow of the Australasian
Institute of Mining and Metallurgy (Membership No. 111172) and has sufficient experience relevant to the style of
mineralisation, the type of deposit under consideration and to the activity undertaken to qualify as Competent
Persons as defined in the 2012 edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Andrew consents to the inclusion of the information in the release in the form and
context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously
prepared and disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated
30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the
Prospectus).
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard
management’s expectations and beliefs concerning future events as of the time of the release of this announcement.
Forward-looking and aspirational statements are necessarily subject to risks, uncertainties and other factors, some
of which are outside the control of Ballard, which could cause actual results to differ materially from such
statements. Ballard makes no undertaking to subsequently update or revise the forward looking or aspirational
statements made in this release to reflect events or circumstances after the date of this release, except as required
by applicable laws and the ASX Listing Rules.
11
ASX: BM1
ballardmining.com.au
Appendix A: Ballard Global Mineral Resource Estimate (February 2026)
Cutoff Deposit
Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Open cut
0.5g/t Au
Baldock 2,916 3.9 362 395 2.6 33 3,311 3.7 395
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Tailings - - - 500 0.5 8 500 0.5 8
Underground
1.5g/t Au
Baldock 2,658 3.6 307 2,992 3.2 304 5,651 3.4 610
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3 3 30 3 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
All
Baldock 5,574 3.7 669 3,388 3.1 337 8,962 3.5 1,006
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Tailings 500 0.5 8 500 0.5 8
Total 5,574 3.7 669 6,684 2.4 509 12,258 3.0 1,178
Notes:
• Open pit resources are reported within optimised pit shells based on A$4,500 per ounce gold price and
reported at 0.5 g/t Au cut-off grade.
• Underground resources are reported below optimised pits and constrained within mineralised domains in
optimised mineable shapes at 1.5g/t gold cut-off grade.
• All figures are rounded to reflect appropriate levels of confidence.
• Apparent differences may occur due to rounding.
12
ASX: BM1
ballardmining.com.au
Appendix B: Recent Project Data
Appendix B1: Recent Exploration Significant Intercepts reported in this announcement
* Intersections reported about 0.5 g/t with a maximum of 2 metres of internal dilution
* NSI values indicate that No Significant Intersection was identified
Hole ID From To Length Gold g/t Lode
WKEX071 83 88 5 10.02 West Knell
EUEX006 107 109 2 5.64 Europa
WKEX067 185 188 3 2.82 West Knell
EUEX011 54 57 3 2.69 Europa
EUEX010 118 119 1 2.47 Europa
EUEX008 80 81 1 1.72 Europa
EUEX011 48 49 1 1.64 Europa
WKEX068 158 160 2 1.6 West Knell
WKEX071 142 143 1 1.32 West Knell
WKEX074 41 42 1 1.14 West Knell
EUEX012 82 86 4 1.08 Europa
EUEX008 86 87 1 0.87 Europa
EUEX007 91 92 1 0.72 Europa
EUEX009 54 55 1 0.69 Europa
EUEX002 130 131 1 0.66 Europa
EUEX006 115 116 1 0.63 Europa
EUEX009 58 59 1 0.54 Europa
EUEX001 NSI Europa
EUEX003 NSI Europa
EUEX004 NSI Europa
EUEX005 NSI Europa
WKEX075 NSI West Knell
13
ASX: BM1
ballardmining.com.au
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth East North RL Azi Dip Prospect
ASEX001 95 251004 6781860 455 53 -60 Astro
ASEX002 149 250971 6781837 455 56 -61 Astro
ASEX003 101 250897 6781997 455 53 -59 Astro
ASEX004 161 250863 6781962 455 52 -61 Astro
ASEX005 131 250826 6782067 456 53 -60 Astro
ASEX006 167 250791 6782032 456 52 -60 Astro
ASEX007 143 251229 6781478 456 52 -60 Astro
ASEX008 89 251337 6781339 459 53 -60 Astro
BMEX220 137 257335 6782944 447 269 -56 Europa
BMEX221 77 257246 6782993 444 271 -55 Europa
BMEX222 101 257296 6782993 447 270 -56 Europa
BMEX223 83 257236 6783043 446 272 -56 Europa
BMEX224 113 257293 6783041 446 272 -55 Europa
BMEX225 77 257293 6783041 446 270 -55 Europa
BMEX226 83 257266 6783087 446 271 -56 Europa
BMEX227 65 257200 6783135 445 272 -55 Europa
BMEX228 83 257250 6783135 446 272 -55 Europa
BMEX229 95 257341 6782800 448 275 -56 Europa
BMEX230 101 257345 6782758 448 272 -56 Europa
BMEX231 83 257319 6782704 449 271 -56 Europa
BMEX232 101 257369 6782704 449 272 -56 Europa
BMEX233 83 257292 6782653 450 269 -55 Europa
BMEX234 83 257334 6782656 449 271 -56 Europa
BMEX235 143 257397 6782661 450 271 -55 Europa
BMEX236 65 257292 6782606 451 266 -55 Europa
BMEX237 83 257336 6782616 451 271 -56 Europa
EUEX001 65 257401 6783148 447 269 -55 Europa
EUEX002 161 257451 6783148 447 274 -56 Europa
EUEX003 65 257397 6783193 447 272 -56 Europa
EUEX004 161 257450 6783198 447 272 -56 Europa
EUEX005 89 257410 6783250 447 271 -56 Europa
EUEX006 161 257464 6783247 447 272 -55 Europa
EUEX007 107 257431 6783295 446 273 -55 Europa
EUEX008 191 257481 6783295 447 272 -56 Europa
EUEX009 113 257439 6782926 447 271 -56 Europa
EUEX010 161 257495 6782937 449 272 -56 Europa
EUEX011 101 257443 6782887 448 269 -56 Europa
EUEX012 161 257494 6782885 449 270 -56 Europa
EUEX013 77 257432 6782837 448 270 -56 Europa
EUEX014 125 257484 6782833 449 274 -55 Europa
14
ASX: BM1
ballardmining.com.au
Hole ID Depth East North RL Azi Dip Prospect
WKEX067 215 257319 6783466 445 262 -61 West Knell
WKEX068 179 257340 6783420 445 271 -60 West Knell
WKEX069 245 257390 6783420 445 272 -61 West Knell
WKEX070 215 257387 6783458 445 273 -61 West Knell
WKEX071 173 257012 6783418 444 269 -60 West Knell
WKEX072 161 256989 6783373 444 269 -60 West Knell
WKEX073 119 256940 6783350 444 270 -60 West Knell
WKEX074 59 256890 6783350 444 268 -60 West Knell
WKEX075 167 256981 6783323 444 271 -61 West Knell
WKEX076 143 256920 6783304 445 272 -60 West Knell
WKEX077 77 256870 6783304 445 268 -60 West Knell
WKEX078 167 256994 6783274 445 272 -61 West Knell
WKEX079 113 256901 6783256 445 269 -60 West Knell
WKEX080 71 256851 6783256 445 270 -60 West Knell
15
ASX: BM1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Gold Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
16
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling, TopDrill & PXD, RC
drilling utilised an Explorac 220RC rig, T66
Schramm RC Rig with a 143 mm face sampling
hammer bit, DD drilling was completed by a truck
mounted Sandvik DE820 and a KWL 1500 and has
been a combination of PQ2, HQ2 and NQ2
diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
17
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS dried, crushed and pulverised to 80%
passing 75 microns with 500g of material utilised
for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
• The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
• Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
• Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
• Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
18
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Samples have been analysed by external
laboratories utilising industry standard methods
• The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
• Photon assay is a non-destructive total analysis
technique
• Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
• QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
• All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
• Limited historic QAQC data has been supplied,
industry standard best practice is assumed
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel. The use
of twinned holes. Documentation of
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
• Significant intercepts have been reviewed by
senior personnel
• No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
• Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data was supplied in various
formats and has been validated as much as
practicable
• No adjustments to assay data have been made
• Data entry, verification and storage protocols
remain unknown for historic operators
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation. Specification of
the grid system used. Quality and
adequacy of topographic control
• MGA94 zone 51 grid coordinate system is used
• Current drilling collars have been pegged using a
DGPS unit, all collars will be surveyed upon
program completion by an independent third
party
• All infill drill holes are pegged using a DGPS for
maximum accuracy
• Downhole surveys are completed by the drilling
contractors using a true north seeking gyro
instrument, AC drillholes did not have downhole
surveys carried out
• Topography has been surveyed by recent
operators. Collar elevations are consistent with
surrounding holes and the natural surface
elevation
• Historic collars are recorded as being picked up
by DGPS, GPS or unknown methods and utilised
the MGA94 zone 51 coordinate system
• Historic downhole surveys were completed by
north seeking gyro, Eastman single shot and multi
shot downhole camera
19
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied. Whether sample compositing
has been applied.
• Drill hole spacing is variable throughout the
program area
• Spacing is considered appropriate for this style of
exploration
• Sample compositing has not been applied
Orientation of
data
Share your feedback
Discover