Infill Drilling delivers outstanding widths and grade
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 22nd
December 2025
BALDOCK DRILLING DELIVERS
PHASE 1 INFILL DRILL PROGRAM COMPLETE
HIGHLIGHTS
• Recent assay results include multiple high-grade and broad gold
intersections, including:
o 8 metres at 11.0 g/t gold from 251 metres in DFS138
o 6 metres at 11.3 g/t gold from 222 metres in DFS137
o 3 metres at 16.0 g/t gold from 238 metres in DFS133
o 11 metres at 4.8 g/t gold from 198 metres in DFS327
o 5 metres at 8.8 g/t gold from 67 metres in DFS325
o 8 metres at 5.7 g/t gold from 126 metres in DFS634
o 3 metres at 9.4 g/t gold from 283 metres in DFS588
o 2.5 metres at 24.3 g/t gold from 390 metres in DFS654
• Current drilling results continue to confirm the tenor and continuity of high-
grade gold mineralisation within the Baldock deposit
o Supports conversion of Inferred resources to Indicated classification
• 86,000m Phase 1 Infill drilling program completed
o Baldock Resource update and maiden Ore Reserve targeted mid
CY2026
• CY2026 Focus is Resource Growth at both Baldock and Regional Prospects
Managing Director, Paul Brennan commenting on the most recent results noted:
“The latest assay results confirm the robustness of the Baldock deposit. The consistent high grades and
widths across multiple lodes provides confidence in the current Mineral Resource Estimate and its
planned upgrade to Indicated status. As the sixth set of results announced from the infill drilling program,
these ongoing confirmatory results underpin the Company’s objective of delivering a 400–500koz maiden
Ore Reserve at Baldock by mid-CY2026, providing a 5–6 year Reserve base.
The 86,000m Phase 1 infill drilling program at Baldock is now complete to a depth of 350m. Baldock
extensional drilling is planned for CY2026, targeting depths of 350–750m where significant resource
growth is anticipated, underpinning the Company’s strategy to build visibility towards an 8–10 year mine
life at Mt Ida”
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to report additional assay
results from its ongoing Resource Conversion (Infill) drilling program at the Baldock gold
deposit, part of the Mt Ida Gold Project located 540km northeast of Perth in Western Australia’s
Goldfields region (Figure 12). The Mt Ida Gold Project covers 26km of prospective greenstone
belt, folded around the Copperfield Granite (Figure 13).
The drilling program is designed to increase drill density to 20m x 20m, improve geological
confidence, and support the conversion of Inferred Mineral Resources to the Indicated
category. The latest batch of results includes drilling across the northern, central and southern
portions of the Baldock system and continues to intersect high-grade gold mineralisation over
meaningful widths.
Figure 1 - Mineralised Interval from infill drill hole DFS654 from 390 – 392.5 metres containing 2.5 metres at 24.3 g/t
gold within the 1100 lode consisting of massive pyrite-chalcopyrite in a silica matrix.
Phase 1 Infill drilling program completed
The Company has completed its Phase 1 Infill drilling program at the Baldock deposit. The site
exploration team has completed over 86,000 metres of geological logging, sampling and data
interpretation to significantly improve the detailed geological model which will enable a
substantial part of the current resource to be upgraded to an Indicated resource.
New Infill drilling results
This release of Infill assay results from the Baldock gold deposit includes 65 drill holes for
16,903 metres that have been drilled at the northern, central and southern parts of the Baldock
zone (Figures 3-13). The full assay results table is set out in Appendix B, and outlines which
results are included within the current Mineral Resource Estimate (MRE), and those which fall
outside. Phase 1 Infill drilling (20m x 20m) is now complete with final assays expected in late
January 2026.
The results continue to demonstrate the presence of multiple high-grade gold lodes within the
Baldock system, with mineralisation intersected over a broad range of depths and positions
within the deposit. The combination of high gold grades, consistent widths and strong gram-
metre values is considered encouraging and reinforces the geological interpretation
underpinning the current MRE.
0.96m at 11 g/t Au
0.4m at 3.2 g/t Au
0.47m at 30.3 g/t Au 0.64m at 51.5 g/t
Au
3
ASX: BM1
ballardmining.com.au
Baldock Development Strategy
The Company is targeting an initial Ore Reserve of 400,000-500,000 ounces based on the Phase
1 Infill drilling program now complete at Baldock. To support this, the Company is undertaking
extensive metallurgical test work and detailed geotechnical modelling. Both tasks are on track
to be completed in the first quarter of CY2026 (Figure 2). This will provide the basis for an initial
5 – 6 Year mine Reserve at Baldock.
Figure 2 - FY26 Baldock Work Streams
4
ASX: BM1
ballardmining.com.au
Figure 3 - Baldock infill drill hole locations reported in this announcement overlaid on gold mineral resource
outlines
5
ASX: BM1
ballardmining.com.au
Figure 4 - Detailed drilling location plan (Baldock-Whinnen) showing significant gold intersections reported in this
announcement
6
ASX: BM1
ballardmining.com.au
Figure 5 - Detailed drilling location plan (Meteor) showing significant gold intersections reported in this announcement
7
ASX: BM1
ballardmining.com.au
Figure 6 - Cross section 1 showing new assay intersections including 2.5 metres at 24.3 g/t gold in DFS654 in the
Baldock 1100 lode
8
ASX: BM1
ballardmining.com.au
Figure 7 - Cross section 2 showing multiple new assay intersections including 6 metres at 5.3 g/t gold in DFS123
and 7 metres at 4.9 g/t gold in DFS 124 in the Baldock 2110 lode
9
ASX: BM1
ballardmining.com.au
Figure 8 - Cross section 3 showing new assay intersections including 3 metres at 16 g/t gold in DFS133 in the
Baldock 2110 lode
10
ASX: BM1
ballardmining.com.au
Figure 9 - Cross section 4 showing new assay intersections of 6 metres at 11.3 g/t gold in in DFS137 and 8 metres
at 11 g/t gold in DFS 138 in the Baldock 2110 lode
11
ASX: BM1
ballardmining.com.au
Figure 10 - Cross section 5 showing new assay intersections of 8 metres at 5.7 g/t gold and 1 metre at 21.8 g/t gold
in DFS634 at Baldock within the 2110 lode
12
ASX: BM1
ballardmining.com.au
Figure 11 - Cross section 6 showing new assay intersection of 5 metres at 8.8 g/t gold, in DFS326 and 11 metres at
4.8 g/t gold in DFS 327 at Baldock within the 2110 lode
13
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3
million tonnes @ 3.3 g/t Au for 1.1 million ounces1
of contained gold. The Baldock deposit,
which hosts 930koz @ 4.1 g/t1
, forms the basis for initial development opportunities at Mt Ida.
Figure 12 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region
A ~130,000mdrillprogram has been completed across theProject in CY2025, targeting an initial
~86,000 metres of Infill drilling at Baldock and ~40,000 metre regional exploration program. The
regional exploration program is testing highly prospective and underexplored zones along the
26km strike of both the Baldock Thrust and the Ballard Fault (Figure 13).
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tails Storage Facility has been received and
as well as a 3.7 GL/yr water abstraction license.
1
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
14
ASX: BM1
ballardmining.com.au
Figure 13 – Mt Ida identified Au prospects with planned Phase 1 Infill and Phase 1 exploration programs
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
15
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open pit and underground mining approvals with a Works Approval for a 2.0 Mtpa Processing Plant and Tailings Storage
Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the current MRE and
increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
16
ASX: BM1
ballardmining.com.au
Appendix A: April 20252
Mineral Resource Estimate
2
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Baldock 2,600 4.5 365 1,570 3.6 200 4,120 4.2 563
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Mt Ida Tailings - - - 500 0.5 8 500 0.5 8
Baldock 242 4.8 37 2,610 4.0 338 2,850 4.0 368
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3.0 3 30 3.0 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
Baldock 2,840 4.5 402 4,220 3.9 532 7,000 4.1 930
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Mt Ida Tailings 500 0.5 8 500 0.5 8
Total 2,840 4.5 402 7,500 3.0 699 10,310 3.3 1,102
Total
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Cut off Deposit
Indicated Inferred
17
ASX: BM1
ballardmining.com.au
Appendix B: Recent Project Data
Appendix B1: Recent Significant Intercepts reported in this announcement
* Intersections reported about 0.5 g/t with a maximum of 2 metres of internal dilution
* NSI values indicate that No Significant Intersection was identified
Hole ID From To Length Gold g/t Lode
DFS654 390 392.47 2.47 24.3 1100
DFS634 336.25 337.29 1.04 21.8 2110
DFS133 238 241 3 16.0 2110
DFS137 222 228 6 11.3 2110
DFS138 251 259 8 11.0 2110
DFS588 283 286 3 9.4 2140
DFS325 67 72 5 8.8 2141
DFS119 207 208 1 8.3 2110
DFS123 246 251 5 6.3 2110
DFS634 126 134 8 5.7 2160
DFS458 319.1 319.8 0.7 5.5 1090
DFS702 343 345 2 5.4 1089
DFS577 78 81 3 5.1 ,2140
DFS702 333 335 2 5.0 1090
DFS124 276 283 7 4.9 2110
DFS567 163 167 4 4.9 2120
DFS327 198 209 11 4.8 2140
DFS556 138 139 1 4.8 2160
DFS145 235 236 1 4.3 2110
DFS586 262 263 1 4.1 2140
DFS121 153 154 1 3.6 2110
DFS558 159 161 2 3.5 2160
DFS125 195 196 1 3.3 2110
DFS332 108 111 3 3.1 2141
DFS650 289 294 5 3.0 1103
DFS609 292 294 2 3.0 2110
DFS363 14 17 3 2.9 2161
DFS371 187 193 6 2.9 2140
DFS118 170 174 4 2.7 2110
DFS441 208 210 2 2.5 1090
DFS567 289 291 2 2.3 2140
DFS136 195 196 1 2.3 2110
DFS118 204 206 2 2.2 2130
DFS268A 20 24 4 1.9 2160
DFS361 185 186 1 1.7 2140
DFS236A 187 190 3 1.7 2200
18
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS326 172 175 3 1.6 2140
DFS636 179 180 1 1.6 2160
DFS609 42 44 2 1.5 2160
DFS362 241 248 7 1.5 2137
DFS565 233 235 2 1.3 2140
DFS609 232 234 2 1.3 2112
DFS124 313 314 1 1.2 2130
DFS133 262 263 1 1.1 2130
DFS326 83 86 3 1.1 2141
DFS327 234 236 2 1.1 2137
DFS325 151 153 2 1.0 2140
DFS332 180 181 1 0.9 2140
DFS441 295 302 7 0.8 1100
DFS558 314 315 1 0.8 2140
DFS588 122 123 1 0.8 2160
DFS362 72 74 2 0.8 2161
DFS319 117 118 1 0.8 2141
DFS609 229 230 1 0.7 2112
DFS327 190 191 1 0.7 2143
DFS327 219 220 1 0.7 2137
DFS332 167 168 1 0.7 2143
DFS399A 295 299 4 0.7 1090
DFS319 245 246 1 0.7 2140
DFS136 199 200 1 0.7 2110
DFS361 35 36 1 0.6 2161
DFS399A 293 294 1 0.6 1090
DFS399A 371 372 1 0.6 1099
DFS327 103 108 5 0.6 2141
DFS609 326 327 1 7.3 outside MRE
DFS634 358.99 359.99 1 4.1 Outside MRE
DFS588 174 175 1 2.2 Outside MRE
DFS694 177 178 1 1.0 outside MRE
DFS319 272 274 2 0.9 outside MRE
DFS588 199 200 1 0.9 Outside MRE
DFS556 262 263 1 0.8 outside MRE
DFS609 313 316 3 0.7 outside MRE
DFS441 325 326 1 0.7 outside MRE
DFS441 344 345 1 0.7 outside MRE
DFS558 389 390 1 0.6 Outside MRE
DFS558 288 289 1 0.6 Outside MRE
DFS588 323 324 1 0.5 outside MRE
19
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS146 255 257 2 2.9 Pit
DFS586 56 57 1 2.3 Pit
DFS119 167 168 1 2.2 Pit
DFS621B 73 74 1 1.7 Pit
DFS584 83 84 1 1.4 Pit
DFS119 197 198 1 1.0 Pit
DFS650 212 214 2 0.8 Pit
DFS118 182 184 2 0.8 Pit
DFS145 186 187 1 0.8 Pit
DFS371 68 71 3 0.7 Pit
DFS137 217 218 1 0.6 Pit
DFS363 118 119 1 0.6 Pit
DFS361 45 46 1 0.5 Pit
DFS552 41 42 1 0.5 Pit
DFS621B 44 48 4 0.5 Pit
DFS363 24 25 1 0.5 Pit
DFS224B NSI
DFS674B NSI
20
ASX: BM1
ballardmining.com.au
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth East North RL Azi Dip
DFS081 264 253,046 6,778,654 471 55 - 62
DFS107 264 253,016 6,778,707 472 53 - 59
DFS108 270 253,000 6,778,697 472 55 - 59
DFS118 222 253,012 6,778,754 471 55 - 56
DFS119 228 252,981 6,778,733 471 55 - 59
DFS120 300 252,967 6,778,723 471 56 - 60
DFS121 186 253,005 6,778,797 471 55 - 60
DFS122 210 252,995 6,778,759 471 56 - 61
DFS123 306 252,951 6,778,726 471 54 - 60
DFS124 330 252,927 6,778,708 472 55 - 59
DFS125 210 252,978 6,778,778 471 55 - 60
DFS126 312 252,926 6,778,742 471 55 - 60
DFS132 258 252,944 6,778,776 471 53 - 59
DFS133 288 252,928 6,778,765 471 55 - 59
DFS136 220 252,950 6,778,805 471 55 - 59
DFS137 264 252,937 6,778,792 471 53 - 60
DFS138 282 252,924 6,778,783 471 53 - 59
DFS145 246 252,923 6,778,822 471 55 - 61
DFS146 288 252,909 6,778,811 471 56 - 59
DFS224B 126 252,532 6,778,952 471 60 - 58
DFS228 96 252,554 6,778,988 471 53 - 60
DFS228A 138 252,557 6,778,988 471 64 - 57
DFS228B 192 252,560 6,778,988 471 59 - 57
DFS236A 222 252,526 6,779,000 471 64 - 57
DFS268A 210 252,812 6,779,048 470 54 - 60
DFS319 293 252,616 6,779,272 469 54 - 61
DFS325 172 252,650 6,779,346 468 56 - 60
DFS326 233 252,634 6,779,335 468 55 - 60
DFS327 245 252,620 6,779,325 468 53 - 61
DFS332 239 252,613 6,779,345 468 55 - 61
DFS361 217 252,555 6,779,425 468 56 - 60
DFS362 250 252,539 6,779,415 468 56 - 61
DFS363 161 252,560 6,779,455 467 56 - 61
DFS371 215 252,524 6,779,483 467 57 - 61
DFS399A 390 253,353 6,778,097 475 51 - 59
DFS441 352 253,298 6,778,307 474 53 - 60
DFS458 419.70 253,225 6,778,301 473 54 - 60
DFS552 258 252,733 6,779,063 471 54 - 60
DFS554 300 252,700 6,779,039 472 55 - 60
DFS556 282 252,675 6,779,022 472 55 - 61
DFS556A 348 252,675 6,779,022 472 53 - 58
21
ASX: BM1
ballardmining.com.au
Hole ID Depth East North RL Azi Dip
DFS558 426 252,652 6,779,006 471 53 - 60
DFS565 240 252,728 6,779,108 471 53 - 61
DFS567 324 252,667 6,779,065 471 53 - 59
DFS577 90 252,823 6,779,220 470 54 - 59
DFS584 246 252,712 6,779,145 470 52 - 60
DFS586 312 252,679 6,779,122 470 53 - 60
DFS588 348 252,648 6,779,101 471 54 - 59
DFS592 300 252,964 6,778,672 472 54 - 59
DFS594 162 252,921 6,778,640 472 57 - 59
DFS594A 330 252,921 6,778,640 472 53 - 58
DFS597 42 252,844 6,778,621 473 54 - 56
DFS597A 126 252,844 6,778,621 473 60 - 54
DFS609 330 252,890 6,778,746 471 55 - 60
DFS621A 246 253,097 6,778,568 472 65 - 56
DFS621B 228 253,097 6,778,568 472 58 - 56
DFS632 288 252,885 6,778,810 472 48 - 61
DFS634 420 252,834 6,778,777 472 53 - 58
DFS636 420 252,796 6,778,748 473 54 - 58
DFS650 315 253,181 6,778,554 474 52 - 60
DFS654 270 253,116 6,778,508 472 54 - 59
DFS670A 210 253,097 6,778,568 472 54 - 57
DFS674B 228 253,370 6,778,057 475 55 - 60
DFS694 330 253,325 6,778,127 475 56 - 61
DFS702 366 253,253 6,778,150 475 56 - 60
22
ASX: BM1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Gold Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered to be
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
23
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling & PXD, RC drilling
utilised an Explorac 220RC rig, T66 Schramm RC
Rig with a 143 mm face sampling hammer bit, DD
drilling was completed by a truck mounted
Sandvik DE820 and a KWL 1500 and has been a
combination of PQ2, HQ2 and NQ2 diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
in full
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
24
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• Ballard have recently amended the Photon
methodology to carry out analysis on Pulverised
material rather than crushed material, studies
suggest the results are comparable.
• RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
• The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
• Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
• Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
• Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
25
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Samples have been analysed by external
laboratories utilising industry standard methods
• The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
• Photon assay is a non-destructive total analysis
technique
• Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
• QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
• All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
• Limited historic QAQC data has been supplied,
industry standard best practice is assumed
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel. The use
of twinned holes. Documentation of
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
• Significant intercepts have been reviewed by
senior personnel
• No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
• Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data was supplied in various
formats and has been validated as much as
practicable
• No adjustments to assay data have been made
• Data entry, verification and storage protocols
remain unknown for historic operators
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation. Specification of
the grid system used. Quality and
adequacy of topographic control
• MGA94 zone 51 grid coordinate system is used
• Current drilling collars have been pegged using a
DGPS unit, all collars will be surveyed upon
program completion by an independent third
party
• All infill drill holes are pegged using a DGPS
Share your feedback
Discover