ASX Announcement – 20 January 2026
December 2025 Quarterly Activities Report
& Appendix 5B
HIGHLIGHTS
• Mt Ida Fully Permitted
o Receipt of Works Approval for 2 Mtpa Processing Plant and TSF, being
the final approval required to enable mining and processing at Mt Ida
o Additional water license received for 2.5 GL/yr, increasing total water
license to 3.7 GL/yr
• 86,000m Phase 1 infill drill program at Baldock completed, with results
continuing to demonstrate the presence of multiple high-grade gold lodes
within the Baldock system. Significant results include^
:
o 7m at 16.8 g/t gold from 268m (DFS058)
o 8m at 11.0 g/t gold from 251m (DFS138)
o 6m at 11.3 g/t from 251m (DFS137)
o 11m at 4.8 g/t from 198m (DFS327)
o 8m at 5.7 g/t from 126m (DFS634)
• October 2025 ExplorationTarget^
of11.8 – 14.6Mt at 2.6– 3.9g/t gold established,
separate from and in addition to Ballard’s existing Mineral Resource Estimate
• Regional exploration drilling program identified a new +900m-long mineralised
trend at the Astro and Quasar prospects, high-grade mineralisation at the Pluto
Prospect and over 1,100m strike at the Dickson trend
• Key regional drill results include^
:
o 5m at 9.4 g/t gold from 46m (BMEX100) at Pluto
o 9m at 2.9 g/t gold from 40m (BMEX112) at Pluto
o 8m at 1.8 g/t gold from 30m (BMEX072) at Astro
• Structural Review of high-resolution aeromagnetics identified 35 new gold
targets increasing total current number of regional prospects to 53
• Successful $20.6 million Placement at a premium by new strategic cornerstone
investor Aurenne Group Holdings Pty Ltd
• Ballard remains well funded with cash balance at 31 December 2025 of $28.8M.
^ Refer to various ASX releases as listed later in this report
2
ASX: BM1
ballardmining.com.au
Commenting on the quarterly activities report, Managing Director Paul Brennan said:
“We achieved our first Company milestone during the December Quarter with the safe completion of an
86,000 metre infill drilling program at Baldock. This drilling is expected to de-risk the first 5 or 6 years of a
targeted 8-10 year mine life. The Company has released six separate ASX announcements with respect to
the infill results which have been confirmatory. Ballard remains on track to deliver a Maiden Ore Reserve
at Baldock by mid-CY2026 once the resource update is completed as well as the key modifying factors of
geotechnical and metallurgical studies.
Ballard is well-funded to continue advancing all current and scheduled exploration and development
workstreams in CY2026, with an expansive body of extensional and regional exploration drilling planned
with the aim of significantly growing the Mt Ida resource base and its fundamental value.”
Ballard Mining (ASX:BM1) (Ballard or the Company) is pleased to present the December Quarterly
Activities Report and Appendix 5B, for the quarter ending 31 December 2025.
Mt Ida Gold Project Overview
Located 540km northeast of Perth, in the Goldfields region of Western Australia (Figure 1). The Mt Ida Gold
Project (Mt Ida or the Project) covers 26km of prospective greenstone belt, folded around the Copperfield
Granite.
The Project includes six granted mining leases and is fully permitted for mining, including an approved
Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit. A Works
Approval for up to 2.0 Mtpa Processing and Tails Storage Facility has been received as well as a granted
3.7 GL/yr water abstraction license.
Mt Ida hosts a JORC 2012-compliant Mineral Resource Estimate (MRE) totalling 10.3 million tonnes @ 3.3
g/t Au for 1.1 million ounces of contained gold1
. The Baldock deposit (Figure 2), which hosts 930 koz @ 4.1
g/t1
, forms the basis for initial development opportunities at Mt Ida.
Ballard is pursuing a dual stream Resource Growth and Project Development strategy. The Company is
aiming to announce mid-CY2026 a Maiden Ore Reserve at Baldock that underpins an initial 5-6 year mine
life and a defined pathway to deliver longer mine life for a standalone operation. Baldock Ore Reserve
workstreams are ongoing and the Company’s focus for the next 12 months is Resource Growth
(extensional and regional) to add scale (Figure 3).
1
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary Prospectus lodged
with ASIC and dated 17 June 2025) for further information on the MRE, and Appendix A.
3
ASX: BM1
ballardmining.com.au
Figure 1 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
4
ASX: BM1
ballardmining.com.au
Figure 2 - Mineral Resources and exploration targets identified at the Mt Ida gold project
5
ASX: BM1
ballardmining.com.au
Figure 3 – Mt Ida Planned Workstreams H2FY26 and FY272
*
Final Investment Decision (FID) is contingent on the timing of scale addition arising from Baldock extensional and
regional drilling and the completion of a Definitive Feasibility Study (DFS).
Phase 1 Infill Drilling Program
The Phase 1 infill and extensional drilling program at the Baldock deposit is a core component of Ballard’s
growth and development strategy at Mt Ida. The infill drilling was designed to significantly improve the
detailed geological model and enable a substantial portion of the existing MRE to be upgraded to an
Indicated resource classification. Infill drilling was also designed to provide further geotechnical and
metallurgical data to support ongoing studies to a Feasibility Level of detail.
The Phase 1 infill drilling program was completed in December 2025 with 86,000m drilled, increasing drill
density to 20m x 20m. During the quarter an average of four drill rigs were in operation, comprising three
reverse circulation (RC) rigs and one diamond rig (DD).
Results received to date from this program have continued to confirm the presence of multiple high-grade
gold lodes within the Baldock system, with mineralisation intersected over a broad range of depths and
positions within the deposit. The combination of high gold grades, consistent widths and strong gram
metre values is very encouraging and reinforces the geological interpretation underpinning the current
MRE.
2
Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission and dated 30
May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) and the
Disclaimer and Appendix A for further information on the MRE
6
ASX: BM1
ballardmining.com.au
Ballard’s site team has completed geotechnical logging of both current and historical drilling to allow
Ballard’s consultants, Peter O’Bryan and Associates, to develop a robust geotechnical model for the
Baldock open pit and underground deposits, an essential modifying factor required toreport Ore Reserves.
A large amount of mineralised samples from RC and diamond drilling (53 tonnes) from the infill program
was collected for both the current metallurgical test work program and future detailed test work programs
designed to refine the processing circuit design. These programs are underway.
Ballard released three batches of infill drilling results over the December quarter.
Significant intercepts from the first batch released on 20th
October 2025 included:
• 1.4m at 51 g/t gold from 142m (DFS266)
• 2m at 17.7 g/t gold from 145m (DFS015)
• 7m at 16.8 g/t gold from 268m (DFS058)
• 4m at 7.6 g/t gold from 288m (DFS445)
• 6m at 7.4 g/t gold from 220m (DFS427)
• 9m at 7 g/t gold from 238m (DFS423)
• 4m at 5.5 g/t gold from 31m (DFS490)
• 6m at 4.2 g/t gold from 183m (DFS436)
• 14m at 3.9 g/t gold from 204m (DFS351)
Significant intercepts from the second batch released on 18th
November 2025 included:
• 3m at 64.2 g/t gold from 277m (DFS056C)
• 1.7m at 71.0 g/t gold from 398m (DFS685)
• 2m at 30.0 g/t gold from 249m (DFS421)
• 8m at 5.7 g/t gold from 126m (DFS634)
• 3m at 10.3 g/t gold from 228m (DFS149)
• 5m at 5.5 g/t gold from 17m (DFS484)
• 0.6m at 40.5 g/t gold from 406m (DFS698)
• 4m at 5.3 g/t gold from 201m (DFS408)
Significant intercepts from the third batch released on 22nd
December 2025 included:
• 8m at 11.0 g/t gold from 251m (DFS138)
• 6m at 11.3 g/t gold from 222m (DFS137)
• 3m at 16.0 g/t gold from 238m (DFS133)
• 11m at 4.8 g/t gold from 198m (DFS327)
• 5m at 8.8 g/t gold from 67m (DFS325)
• 8m at 5.7 g/t gold from 126m (DFS634)
• 3m at 9.4 g/t gold from 283m (DFS588)
• 2.5m at 24.3 g/t gold from 390m (DFS654)
7
ASX: BM1
ballardmining.com.au
Following completion of infill drilling, extensional drilling will commence at Baldock designed to add
additional resources to the Baldock MRE.
Final assays from the Phase 1 infill drill program are expected in late January 2026. An update to the
Baldock MRE is currently scheduled for release later in the March 2026 Quarter. The update is expected
to greatly improve the confidence level of the MRE with a larger portion of the total resource to be within
the indicated category.
Regional Exploration Drilling Program
Overview
Ballard has 26km of underexplored highly prospective greenstone belt at Mt Ida. Eighteen targets were
originally identified across the Ballard Fault and the Baldock Thrust based on historical underground
workings and surface rock-chips.
The Mt Ida regional exploration program was designed to systematically test these prospective targets,
achieving early success at the Neptune prospect3
.
In September 2025, Ballard Mining engaged highly regarded structural consultant Dr Sarah Jones to
interpret recently acquired high resolution aeromagnetic imagery. The structural review identified key
geological controls on the movement and deposition of gold mineralisation and underscored the
exceptional prospectivity of the Mt Ida region. This review resulted in the identification of 35 new discrete
targets. In total, there are now 53 regional exploration prospects outside of Baldock, with Ballard grouping
areas with multiple targets into target zones (Figure 2).
To date, Phase 1 regional exploration drilling has been completed at several regional prospects located on
the Baldock Thrust zone north of the Baldock Deposit, including Astro-Quasar, Dickson, Corvus, Pluto and
Milky Way (Figure 1). This drilling has also targeted regional prospects located on the Ballard Fault zone
including Neptune, Pulsar, Ayla-Europa, Comet, Eclipse, Galaxy and Sandstone. Drill testing of these
regional targets will continue in CY2026.
Results from the Phase 1 regional exploration drilling identified widespread gold mineralisation at several
of these prospects. Notably, Phase 1 exploration drilling has successfully targeted historical underground
workings as proof of concept. It has become evident that there are multiple parallel zones of mineralisation
along both the Ballard Fault and the Baldock Thrust shear zones. These early drill results are similar to the
initial exploration results received at Baldock which have subsequently grown into substantial resources.
This provided significant encouragement for the follow-up drilling programs planned in CY2026.
Pluto Prospect
The Pluto Prospect is located 6km north of Baldock on a parallel trend to the Baldock deposit and along
strike to the north of the Bombay gold deposit (MRE of 33koz). Initial drilling has identified a mineralised
contact between a mafic amphibolite and a gabbro with a potential strike extent of over 1,000 metres.
The prospect also sits within a large, demagnetized zone indicative of major alteration which contains a
coincident regional gold in soil anomaly. Very little historical drilling has occurred either along strike or
3
Refer ASX Announcement lodged by Ballard Mining on the 15 September 2025 for further information
8
ASX: BM1
ballardmining.com.au
cross strike and there is potential for repeated mineralisation on parallel structures like those identified at
Baldock further south.
Significant shallow, high grade results included:
• 5m at 9.4 g/t gold from 46m (BMEX100)
• 9m at 2.9 g/t gold from 40m (BMEX112)
Neptune Prospect
The Neptune trend is located on the Ballard Fault, approximately 7km from Baldock.
Mineralisation occurs in east dipping shear zones within a silica-biotite-pyrite altered anorthosite which is
interpreted to be the same host rock and mineralising system as the Baldock Gold Deposit but on the
opposite side of the Copperfield Granite intrusion.
Additional significant assay results were returned during the quarter, which included:
• 2m at 7.0 g/t gold from 131m (BMEX159)
• 2m at 4.0 g/t gold from 164m (BMEX149)
• 3m at 1.5 g/t gold from 15m (BMEX147)
• 1m at 2.3 g/t gold from 41m (BMEX147)
Following on from previous results of:
• 23m at 1.8 g/t gold from 21m (IDRD410)
• 7m at 5.8 g/t gold from 113m (IDRD417)
• 7m at 1.7 g/t gold from 48m (IDRD408)
• 3m at 1.7 g/t gold from 9m (IDRD409)
The Phase 2 drilling at Neptune continues to extend the known mineralisation along 500 metres of strike
and at depth and once all assay results are received, initial geological modelling will be conducted to help
define the resource definition drilling plan with the objective of defining a maiden Inferred MRE.
Astro-Quasar +900m Trend
A new +900 metre mineralised trend was identified at the Astro and Quasar prospects. The prospects are
open to the south and north for 1,100 metres and 700 metres respectively.
Mineralisation typically occurs in amphibolitic basalts adjacent to the contact with the Copperfield granite
and occurs as disseminated sulphides in a biotite-silica-albite +/- quartz alteration zone. The current
interpretation is that the trend is the northern extension of the 1,100-metre-long Dickson mineralised trend
which occurs immediately south and is also on the granite contact.
Phase 1 drilling confirmed that the prospect is highly mineralised. Phase 2 drilling will be conducted early
in CY2026 with the objective of defining a maiden Inferred MRE.
9
ASX: BM1
ballardmining.com.au
Significant results include:
• 8m at 1.8 g/t gold from 30m (BMEX072)
• 3m at 1.7 g/t gold from 77m (BMEX056)
• 1m at 2.4 g/t gold from 23m (BMEX060)
• 2m at 2.6 g/t gold from 13m (BMEX076)
• 1m at 6 g/t gold from 51m (BMEX076)
• 1m at 2.16 g/t gold from 44m (BMEX099).
Dickson Prospect
Dickson is parallel Prospect to the Baldock deposit with an identified 1,100m of potential strike extent.
These early drill results are also similar to the initial exploration results received at Baldock from recently
identified mineralised lodes which have subsequently grown into substantial resources. This provides
significant encouragement for the follow-up Phase 2 drilling program.
Significant results included:
• 4m at 1.4 g/t gold from 76m (BMEX054)
• 1m at 17.6 g/t gold from 29m (BMEX043)
• 1m at 3.7 g/t gold from 40m (BMEX053)
Mt Ida – October 2025 Exploration Target
A new Exploration Target estimate was reported during the quarter for Mt Ida, consisting of 11.8 – 14.6Mt
grading 2.6 – 3.9 g/t gold (October 2025 Exploration Target) separate from and in addition to Ballard's
existing Mt Ida MRE of 10.3Mt @ 3.3 g/t gold for 1.1 Moz.
Table 1: Mt Ida Gold Project October 2025 Exploration Target
Tonnes (Mt)
Low
Tonnes (Mt)
High
Grade (g/t Au)
Low
Grade (g/t Au)
High
11.8 14.6 2.6 3.9
The October 2025 Exploration Target was estimated on the basis of:
• The existing Mt Ida Mineral Resource estimate of 10.3 Mt at 3.3 g/t containing 1.1 Moz4
Au, noting
that the October 2025 Exploration target is separate from and in addition to this Mineral Resource
estimate.
• Geological information indicating that mineralisation persists at depth below existing deposits as
confirmed by deeper drilling.
• Encouraging gold assay results returned from exploration drilling over several kilometres of strike
and to a depth of ~120m.
4
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary Prospectus
lodged with ASIC and dated 17 June 2025) for further information on the MRE.
10
ASX: BM1
ballardmining.com.au
• A gold grade range of the October 2025 Exploration Target calculated from the significant number
of drill intercepts returned from the existing drilling database.
• The volume range (tonnages) of the October 2025 Exploration Target defined by modelling existing
deposits to depth and along strike where drilling shows mineralisation.
• October 2025 Exploration Target ounces output ranges rounded to reflect the conceptual nature
of the calculations.
Table 2: Specific Exploration Targets based on prospect
Tonnes (Mt)
Lower Range (tonnes
& grade)
Upper Range (tonnes
& grade)
Baldock - Panel 1 (300mbs to 750mbs) 4.3 Mt @ 3 g/t 5.0 Mt @ 5 g/t
Baldock - Panel 2 (750mbs to 1,000mbs) 2.0 Mt @ 3 g/t 2.1 Mt @ 5 g/t
Timoni Lode 0.9 Mt @ 3 g/t 1.1 Mt @ 4 g/t
Kestrel & West Knell 1.0 Mt @ 2.5 g/t 1.4 Mt @ 3 g/t
Ballard Fault (various regional prospects) 1.5 Mt @ 2 g/t 2.0 Mt @2.5 g/t
Baldock Thrust (various regional prospects) 2.1 Mt @ 2 g/t 3.0 Mt @ 2.5 g/t
October 2025 Exploration Target 11.8 Mt @ 2.6 g/t 14.6 Mt @ 3.9 g/t
Cautionary Statement: The potential quantity and grade of the October 2025 Exploration Target is
conceptual in nature. There has been insufficient exploration to estimate a Mineral Resource within the
October 2025 Exploration Target, and it is uncertain if further exploration will result in the estimation of a
Mineral Resource. The October 2025 Exploration Target has been prepared and reported by Ballard, in
accordance with the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and
Ore Reserves, 2012 Edition (JORC Code).
Baldock and Timoni – Exploration Targets Planned Works
The Company has planned a substantial drilling program to test the Baldock deposit from 350 metres
depth to 750 metres depth (400 vertical metres). (Figure 4). Drill hole spacing is planned for 100 m x 50 m
and 50 m x 50 m centres covering the 3.1 km strike of the Baldock system.
A substantial drilling program has also been planned to test the Timoni deposit below and to the south of
the historical workings down to a depth of 500 metres below surface. The Timoni North (2200) lode will also
be drill tested to approximately 500 metres as part of the Baldock drilling program which while targeting
Baldock lodes will drill through the Timoni lode. Drill hole spacing is planned for 100 m x 50 m and 50 m x
50 m centres.
To inform deeper drilling targets an Electromagnetic (EM) survey was completed in November 2025. This
will allow drill holes to be planned, and drilling is expected to occur over CY2026 utilising a combination of
RC and diamond drilling.
11
ASX: BM1
ballardmining.com.au
Figure 4 - Long section showing the Baldock deposit, deeper drilling results and Exploration Target. The size and grade
of the October 2025 Exploration Target is conceptual in nature. There has been insufficient exploration to estimate a
Mineral Resource, and it is uncertain if further exploration will result in the estimation of a Mineral Resource.
Mt Ida Project Development
Mt Ida fully permitted
During the December quarter, Ballard received a Works Approval from the Department of Water and
Environmental Regulation (DWER) for the construction of up to a 2.0 Mtpa Processing and Tails Storage
Facility (TSF). Notably, this represents the final approval required to enable mining and processing at Mt
Ida.
Increase in Water License
During the December quarter, Ballard received an additional 2.5 GL/yr water abstraction license from a
planned bore field on the Lake Raeside Paleochannel, located approximately 35km north of the Mt Ida
Project. This has increased Ballard’s approved water abstraction from the existing 1.2 GL/yr to 3.7 GL/yr.
Strategic tenure expansion
During the quarter, Ballard purchased the E29/1032 and E29/1006 tenements, where the three production
bores are located (Figure 5). This ensures control over the underlying tenure and expands the Company’s
land position over the prospective Ballard Fault by an additional ~15 km of prospective strike.
Ballard has also purchased the E29/1033 tenement, providing contiguous tenure between the current
Mining Leases and Mining Lease applications at Mt Ida (Figure 5). This allows for any Mine expansion
infrastructure requirements outside of the mineralised Baldock shear and Ballard Fault gold systems and
provides potential access routes to the fully permitted Mining Centre at the Baldock Deposit.
Furthermore, the recent Project-wide geophysical review has highlighted the existence of major shear
zones within the granite and may host gold mineralisation.
The total consideration for the three tenure purchases is via the issue of 608,868 Ballard Shares. Both
parties to the sales agreement have agreed to a six-month voluntary escrow.
12
ASX: BM1
ballardmining.com.au
Figure 5 – Ballard tenure overview with new tenement purchases
13
ASX: BM1
ballardmining.com.au
Application for additional Mining Lease tenure
Mining Lease applications M29/458 and M29/459 are now in progress to allow for eventual mining of the
Bombay and West Knell gold deposits. These deposits form part of the strategy to build a 8-10 year mine
life at Mt Ida.
Figure 6 – Mt Ida Project overview with new mining lease applications
14
ASX: BM1
ballardmining.com.au
Corporate
Successful Capital Raising
In October 2025, Ballard completed a placement to raise approximately $20.6 million (Placement).
Under the Placement, separate agreements were entered into with existing shareholders as well as new
strategic investor Aurenne Group Holdings Pty Ltd (Aurenne) to subscribe (either directly or through a
nominee) for 37,383,198 Placement Shares at a price of $0.55 per share to raise $20.6 million.
The Chairman of Ballard, Mr Simon Lill, also participated in a separate placement for $200k of fully paid
ordinary shares at the same issue price as the Placement (Director Shares).
Shareholder approval for the issuance of the Director Shares, along with the ratification of the Placement
issuance was received at the Company’s 2025 Annual General Meeting (AGM) held on Friday, 28
November 2025.
Capital Structure
The current capital structure of Ballard is shown below.
Class of Shares Number
Ordinary Shares* 378,355,804
Unlisted Options (at various exercise prices & expiry dates) 7,000,000
Performance Rights^ 14,607,600
* Delta Lithium Ltd hold 41.4% of the issued capital. This holding is subject to a mandatory escrow period
from the ASX ending 2 years from the IPO. In addition, 3 other major shareholders of Ballard agreed to a 6-
month voluntary escrow and a further 6-month orderly market condition for the shares they received as
part of the in-specie distribution by Delta to its shareholders. Subsequent to end of the December quarter,
Ballard announced that pursuant to ASX Listing Rule 3.10A, 29,453,592 fully paid ordinary shares were
released from voluntary escrow on 9 January 2026. Refer to the Prospectus lodged on 10 July 2025 and ASX
announcement dated 5 January 2025 for additional information.
^ The performance rights issued to management and staff all have the same vesting criteria, split across 3
tranches, that are aligned to the future growth and success of Ballard. Refer to the Annual report released
on 22 September 2025 for additional information.
Cash Balance
At the end of the December quarter the Company had a cash balance of $28.8 million (Sep Qtr: $19.9
million). The operational outflow for the quarter was due predominantly to exploration and evaluation
expenditure at the Mt Ida project of $10.8 million.
ASX Compliance
ASX Listing Rule 5.3.1: Exploration and Evaluation Expenditure during the December 2025 Quarter was
$6,086,000. Full details of exploration activity during the December 2025 Quarter
are set out in this report.
ASX Listing Rule 5.3.2: There was no substantive mining production and development activities during
the December 2025 Quarter.
15
ASX: BM1
ballardmining.com.au
ASX Listing Rule 5.3.5: Payments to related parties of the Company and their associates during the
December Quarter: $265,000. The Company advises that this relates to non-
executive director’s fees and executive directors’ salaries and entitlements only.
Please see Remuneration Report in the Annual Report for further details on
Directors’ remuneration.
December 2025 Quarter – ASX Announcements
This Quarterly Activities Report contains information extracted from ASX market announcements reported
in accordance with the 2012 edition of the “Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves” (2012 JORC Code). Further details (including 2012 JORC Code reporting
tables where applicable) of exploration results referred to in this Quarterly Report can be found in the
following announcements lodged on the ASX:
Title Date
Mt Ida Resource Growth and Development Update^ 13 January 2026
Baldock drilling delivers – Phase 1 Infill Drill Program complete 22 December 2025
Mt Ida Exploration Update 15 December 2025
Infill drilling results at Baldock delivers more high-grade gold 18 November 2025
Strategic Investor cornerstones $20.6M Placement 29 October 2025
Infill drill results continue to confirm high grade Baldock 20 October 2025
Mt Ida Exploration Update 14 October 2025
Mt Ida Fully Permitted 2 October 2025
^ released subsequent to the end of the Quarter
The announcements can be viewed on the Company’s website www.ballardmining.com.au under the
Investors tab.
Ballard confirms that it is not aware of any new information or data that materially affects the information
included in any original ASX announcement.
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Finance Director
info@ballardmining.com.au
16
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open cut and underground mining approvals witha Works Approvalfor a 2.0 Mtpa Processing Plant and Tailings Storage Facility.
Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the current MRE and increase
the global resource inventory via an aggressive exploration program. All modifying factors will be advanced simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms that
the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the date
of this release, except as required by applicable laws and the ASX Listing Rules.
17
ASX: BM1
ballardmining.com.au
Appendix A: April 20255
Mineral Resource Estimate
5
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Baldock 2,600 4.5 365 1,570 3.6 200 4,120 4.2 563
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Mt Ida Tailings - - - 500 0.5 8 500 0.5 8
Baldock 242 4.8 37 2,610 4.0 338 2,850 4.0 368
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3.0 3 30 3.0 3
West Knell 192