ASX Announcement – 11 March 2026
Regional Prospects advance Mt Ida Development strategy
Satellite open pit prospects targeted to supplement baseload from Baldock
• Exploration results from Neptune on the Ballard Fault:
o 4 metres at 4.0 g/t gold from 55 metres in BMEX198
o 6 metres at 5.6 g/t gold from 131 metres in BMEX199
o 2 metres at 41.5 g/t gold from 156 metres in BMEX208
o Previous results1
at Neptune include 23m @ 1.8 g/t from 21m, 7m @
1.7 g/t from 48m and 7m @ 5.8 g/t from 113m
o Further drilling scheduled
• Exploration results from Golden Vale on the Ballard Fault:
o 1 metre at 7.0 g/t gold from 9 metres in GVEX039
o 14 metres at 1.5 g/t gold from 36 metres in GVEX040
o 1 metre at 14.1 g/t gold from 45 metres in GVEX035
o Several shallow wide low-grade intervals suitable for open pit mining
identified in drilling
o Further drilling scheduled
• Highlights opportunity for satellite open pit projects in close
proximity to proposed central processing facility at Baldock
o West Knell, which is also on the Ballard Fault, returned 10m @ 6.4 g/t
from 28m in February2
• Resource growth drilling accelerates with extra rigs mobilised
o Six drill rigs operating – 3 x diamond, 3 x reverse circulation
Commenting on Ballard’s active Growth program, Managing Director Paul Brennan said:
“This is a very encouraging start to our 220,000m resource growth drill program for 2026. Our
top-down goal for Mt Ida is a minimum eight year mine life supported by baseload feed from
Baldock, with additional production uplift from satellite projects.
Golden Vale, Neptune and West Knell are all demonstrating the opportunity to provide that
contribution from the underexplored Ballard Fault. We look forward to advancing the drilling
programs and updating Mineral Resource Estimates throughout the year.”
1
Refer to the ASX Announcement lodged by Ballard on 15 September 2025 for further information
2
Refer to the ASX Announcement lodged by Ballard on 2 February 2026 for further information
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
the recent drilling at its regional prospects within the Mt Ida Gold Project, located 540km
northeast of Perth in the Goldfields region of Western Australia (Figure 1). The Mt Ida Gold
Project covers 26km of prospective greenstone belt, folded around the Copperfield Granite
(Figure 2).
Ballard is pursuing a dual stream Resource Growth and Project Development strategy. The
Company is aiming to announce a Maiden Ore Reserve at Baldock mid-year. The Company’s
focus for 2026 is Resource Growth (extensional and regional) to deliver production uplift in
addition to Baldock as well as a longer mine life for a standalone operation.
Figure 1 - Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
3
ASX: BM1
ballardmining.com.au
Figure 2 - Aeromagnetic image showing Baldock and the satellite exploration targets.
Regional Resource Growth on Target
During February 2026, regional resource growth drilling has been carried out along the Ballard
fault zone at Neptune, Golden Vale, West Knell and Europa. Drilling consisted of 52 drill holes
for 7,297 metres. Initial drill results for Neptune and Golden Vale are discussed below.
4
ASX: BM1
ballardmining.com.au
More high-grade gold intersections at Neptune prospect
Drill testing around historical shafts at the Neptune prospect has identified an anastomosing
mineralised zone within an intrusive anorthosite unit that extends 990 metres in a north-
northwest direction and dips steeply (70 degrees) to the east-northeast. The mineralised zone
is offset regularly by NNE and NE trending faults (Figure 3). Mineralisation consists of pyrite-
albite-biotite alteration and quartz veining. Drilling announced in the release includes:
• 4 metres at 4.0 g/t gold from 55 metres in BMEX198
• 6 metres at 5.6 g/t gold from 131 metres in BMEX199
• 2 metres at 41.5 g/t gold from 156 metres in BMEX208
The full assay results table is in Appendix B. The Company is continuing to drill test the Neptune
zone with the objective of defining a maiden mineral resource estimate.
Wide shallow gold mineralisation expands Golden Vale deposit
The Golden Vale deposit has an existing inferred gold resource of 27,0003
ounces and has
previously produced 13,0004
ounces (62,000t at 6.0 g/t Au) from historical open pit mining.
Mineralisation in the open pit occurs as a series of shallow southeast dipping quartz lodes in
basaltic amphibolite immediately adjacent to the contact with the Ballard Fault zone.
The Company is pleased to report that recent drilling has identified widespread shallow gold
mineralisation with the potential for open pit mining, with mineralization encountered only 4
metres from surface. Results include:
• 4 metres at 1.2 g/t gold from 4 metres in GVEX040
• 1 metre at 7.0 g/t gold from 9 metres in GVEX039
• 4 metres at 1.3 g/t gold from 16 metres in GVEX037
• 2 metres at 1.6 g/t gold from 27 metres in GVEX035
• 14 metres at 1.5 g/t gold from 36 metres in GVEX040
• 4 metres at 0.9 g/t gold from 39 metres in GVEX039
• 1 metre at 14.1 g/t gold from 45 metres in GVEX035
• 8 metres at 0.9 g/t gold from 55 metres in GVEX038
• 9 metres at 0.9 g/t gold from 59 metres in GVEX039
The Company is encouraged by the recent drilling and has scheduled a larger drilling program
to extend the deposit to the south and east. The full assay results table is in Appendix B.
Drill results from the resource growth program at Baldock will be reported when assays are
available.
3
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
4
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the
Supplementary Prospectus lodged with ASIC and dated 17 June 2025) for further information
5
ASX: BM1
ballardmining.com.au
Figure 3 – Plan view of the drilling at Neptune with recent drilling highlighted.
6
ASX: BM1
ballardmining.com.au
Figure 4 - Cross section 1 from Neptune showing interpreted lodes and drilling results.
7
ASX: BM1
ballardmining.com.au
Figure 5 – Cross section 2 from Neptune showing interpreted lodes and drilling results.
.
8
ASX: BM1
ballardmining.com.au
Figure 6 – General geological plan of the southern end of the Copperfield granite and the Golden Vale project which
sits on the contact of the Ballard Shear zone.
9
ASX: BM1
ballardmining.com.au
Figure 7 – Detailed geological map of the Golden Vale area showing faults, drilling and significant results
announced in this release.
10
ASX: BM1
ballardmining.com.au
Figure 8 - Cross section 1 and Golden Vale showing initial growth assay results and interpreted lodes.
11
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 12.2
million tonnes @ 3.0 g/t Au for 1.2 million ounces5
of contained gold (Inferred and Indicated).
The Baldock deposit, which hosts 1.006Moz @ 3.5 g/t5
forms the basis for initial development
opportunities at Mt Ida.
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tailings Storage Facility has been received
as well as a granted 3.7 GL/yr water abstraction licenses.
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN TIM MANNERS
Managing Director Executive Director
info@ballardmining.com.au
5
Refer to the ASX Announcement lodged by Ballard on 26 February 2026 for further information
12
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 12.2Mt @ 3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open cut and underground mining approvals with a Works Approval for a 2.0 Mtpa Processing Plant and Tailings Storage
Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the current MRE and
increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
13
ASX: BM1
ballardmining.com.au
Appendix A: Ballard Global Mineral Resource Estimate (February 2026)
Cutoff Deposit
Indicated Inferred Total
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Open cut
0.5g/t Au
Baldock 2,916 3.9 362 395 2.6 33 3,311 3.7 395
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Tailings - - - 500 0.5 8 500 0.5 8
Underground
1.5g/t Au
Baldock 2,658 3.6 307 2,992 3.2 304 5,651 3.4 610
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3 3 30 3 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
All
Baldock 5,574 3.7 669 3,388 3.1 337 8,962 3.5 1,006
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Tailings 500 0.5 8 500 0.5 8
Total 5,574 3.7 669 6,684 2.4 509 12,258 3.0 1,178
Notes:
• Open pit resources are reported within optimised pit shells based on A$4,500 per ounce gold price and
reported at 0.5 g/t Au cut-off grade.
• Underground resources are reported below optimised pits and constrained within mineralised domains in
optimised mineable shapes at 1.5g/t gold cut-off grade.
• All figures are rounded to reflect appropriate levels of confidence.
• Apparent differences may occur due to rounding.
14
ASX: BM1
ballardmining.com.au
Appendix B: Recent Project Data
Appendix B1: Recent Exploration Significant Intercepts reported in this announcement
* Intersections reported about 0.5 g/t with a maximum of 2 metres of internal dilution
* NSI values indicate that No Significant Intersection was identified
Hole ID From To Length Gold g/t Lode
BMEX208 156 158 2 41.53 Neptune
BMEX198 57 59 4 4.0 Neptune
BMEX199 131 137 6 5.6 Neptune
BMEX198 85 86 1 1.73 Neptune
BMEX196 79 80 1 1.33 Neptune
BMEX194 12 13 1 1.29 Neptune
BMEX207 143 144 1 1.06 Neptune
BMEX196 97 98 1 1.04 Neptune
BMEX200 29 32 3 1.03 Neptune
BMEX199 127 128 1 0.87 Neptune
BMEX196 53 57 4 0.85 Neptune
BMEX208 146 147 1 0.83 Neptune
BMEX197 113 114 1 0.82 Neptune
BMEX209 77 78 1 0.8 Neptune
BMEX202 186 187 1 0.79 Neptune
BMEX213 58 60 2 0.78 Neptune
BMEX211 171 173 2 0.76 Neptune
BMEX201 144 145 1 0.67 Neptune
BMEX196 62 63 1 0.65 Neptune
BMEX201 121 122 1 0.63 Neptune
BMEX196 34 35 1 0.61 Neptune
BMEX213 67 68 1 0.58 Neptune
BMEX213 63 64 1 0.55 Neptune
BMEX205 27 29 2 0.53 Neptune
BMEX206 47 48 1 0.5 Neptune
BMEX210 194 195 1 0.5 Neptune
BMEX192 NSI Neptune
BMEX193 NSI Neptune
BMEX195 NSI Neptune
BMEX203 NSI Neptune
BMEX204 NSI Neptune
BMEX212 NSI Neptune
GVEX035 45 46 1 14.11 Golden Vale
GVEX039 9 10 1 7.04 Golden Vale
GVEX035 27 29 2 1.56 Golden Vale
GVEX040 39 53 14 1.55 Golden Vale
15
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
GVEX037 16 20 4 1.35 Golden Vale
GVEX040 28 32 4 1.2 Golden Vale
GVEX038 55 63 8 0.9 Golden Vale
GVEX039 39 43 4 0.86 Golden Vale
GVEX039 59 68 9 0.9 Golden Vale
GVEX043 60 61 1 0.84 Golden Vale
GVEX038 0 2 2 0.83 Golden Vale
GVEX037 0 4 4 0.78 Golden Vale
GVEX028 121 122 1 0.77 Golden Vale
GVEX041 111 113 2 0.77 Golden Vale
GVEX038 5 6 1 0.72 Golden Vale
GVEX028 116 117 1 0.71 Golden Vale
GVEX040 63 64 1 0.69 Golden Vale
GVEX033 97 98 1 0.67 Golden Vale
GVEX038 40 45 5 0.65 Golden Vale
GVEX038 14 19 5 0.61 Golden Vale
GVEX041 120 125 5 0.61 Golden Vale
GVEX041 94 95 1 0.59 Golden Vale
GVEX038 27 30 3 0.57 Golden Vale
GVEX038 11 12 1 0.55 Golden Vale
GVEX027 138 139 1 0.54 Golden Vale
GVEX034 28 32 4 0.51 Golden Vale
GVEX028 113 114 1 0.5 Golden Vale
GVEX031 0 1 1 0.5 Golden Vale
GVEX041 115 116 1 0.5 Golden Vale
GVEX029 NSI Golden Vale
GVEX030 NSI Golden Vale
GVEX032 NSI Golden Vale
GVEX036 NSI Golden Vale
GVEX042 NSI Golden Vale
GVEX044 NSI Golden Vale
16
ASX: BM1
ballardmining.com.au
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth East North RL Azi Dip
BMEX192 186 258,219 6,779,624 451 269 - 56
BMEX193 210 258,241 6,779,470 454 270 - 55
BMEX194 156 258,182 6,779,419 454 268 - 56
BMEX195 198 258,235 6,779,415 455 271 - 55
BMEX196 119 257,890 6,780,673 445 214 - 62
BMEX197 173 257,931 6,780,696 445 234 - 60
BMEX198 131 257,926 6,780,633 445 230 - 60
BMEX199 143 257,986 6,780,657 445 247 - 53
BMEX200 107 257,979 6,780,611 445 229 - 56
BMEX201 145 257,998 6,780,633 446 223 - 57
BMEX202 197 258,035 6,780,659 447 229 - 61
BMEX203 197 258,073 6,780,691 447 235 - 60
BMEX204 197 258,111 6,780,723 448 232 - 60
BMEX205 131 257,990 6,780,556 446 229 - 60
BMEX206 113 258,022 6,780,518 446 231 - 60
BMEX207 173 258,060 6,780,550 447 232 - 60
BMEX208 173 258,041 6,780,599 448 233 - 54
BMEX209 215 258,067 6,780,620 448 236 - 60
BMEX210 203 258,099 6,780,582 448 237 - 61
BMEX211 209 258,142 6,780,620 450 234 - 58
BMEX212 162 258,175 6,780,646 449 229 - 60
BMEX213 77 258,058 6,780,485 447 232 - 55
GVEX027 156 258,145 6,775,751 471 267 - 60
GVEX028 162 258,096 6,775,698 468 266 - 61
GVEX029 108 258,042 6,775,806 472 271 - 60
GVEX030 107 258,089 6,775,801 472 267 - 60
GVEX031 107 257,966 6,775,911 468 265 - 60
GVEX032 101 258,013 6,775,909 469 269 - 60
GVEX033 101 258,049 6,775,919 469 268 - 61
GVEX034 101 258,123 6,775,923 469 264 - 61
GVEX035 119 257,954 6,776,104 464 270 - 59
GVEX036 191 258,017 6,776,105 464 268 - 61
GVEX037 113 257,916 6,775,844 471 269 - 61
GVEX038 83 257,825 6,775,842 469 270 - 60
GVEX039 71 257,879 6,775,761 471 268 - 60
GVEX040 113 257,933 6,775,760 471 266 - 60
GVEX041 125 257,999 6,775,603 469 268 - 60
GVEX042 101 258,046 6,775,613 468 268 - 60
GVEX043 107 258,077 6,775,616 468 268 - 61
GVEX044 239 258,095 6,776,098 464 269 - 60
17
ASX: BM1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Lithium Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered to be
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
18
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling, TopDrill & PXD, RC
drilling utilised an Explorac 220RC rig, T66
Schramm RC Rig with a 143 mm face sampling
hammer bit, DD drilling was completed by a truck
mounted Sandvik DE820 and a KWL 1500 and has
been a combination of PQ2, HQ2 and NQ2
diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
in full
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
19
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• Ballard have recently amended the photon
methodology to carry out analysis on pulverised
material rather than crushed material, studies
suggest the results are comparable.
• RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
• The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
• Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
• Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
• Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
20
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Samples have been analysed by external
laboratories utilising industry standard methods
• The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
• Photon assay is a non-destructive total analysis
technique
• Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
• QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
• All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
• Limited historic QAQC data has been supplied,
industry standard best practice is assumed
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel. The use
of twinned holes. Documentation of
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
• Significant intercepts have been reviewed by
senior personnel
• No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
• Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data was supplied in various
formats and has been validated as much as
practicable
• No adjustments to assay data have been made
• Data entry, verification and storage protocols
remain unknown for historic operators
Location of data
points
Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation. Specification of
the grid system used. Quality and
adequacy of topographic control
• MGA94 zone 51 grid coordinate system is used
• Current drilling collars have been pegged using a
DGPS unit, all collars will be surveyed upon
program completion by an independent third
party
• All infill drill holes are pegged using a DGPS for
maximum accuracy
• Downhole surveys are completed by the drilling
contractors using a true north seeking gyro
instrument, AC drillholes did not have downhole
surveys carried out
• Topography has been surveyed by recent
operators. Collar elevations are consistent with
surrounding holes and the natural surface
elevation
• Historic collars are recorded as being picked up
by DGPS, GPS or unknown methods and utilised
the MGA94 zone 51 coordinate system
• Historic downhole surveys were completed by
north seeking gyro, Eastman single shot and multi
shot downhole camera
21
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Data spacing and
distribution
Data spacing for reporting of Exploration
Results. Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s) and classifications
applied. Whether sample compositing
has been applied.
• Drill hole spacing is variable throughout the
program area
• Spacing is considered appropriate for this style of
exploration
• Sample compositing has not been applied
Orientation of
data in relation to
geological
structure
Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type. If
the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
should be assessed and reported if
material
• Drill holes are orientated perpendicular to the
regional trend of the mineralisation previously
drilled at the project; drill hole orientation is not
considered to have introduced any bias to
sampling techniques u