Infill drill results continue to confirm high grade Baldock
Released
Released
Announcement PDF
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
ASX Announcement – 20th
October 2025
MORE VISIBLE GOLD IN INFILL
DRILLING AT BALDOCK
HIGHLIGHTS
• More visible gold in infill drilling continues to confirm the existing high-grade
Baldock gold Mineral Resource Estimate (930koz @ 4.1 g/t1
Indicated &
Inferred).
• Infill drilling highlights include:
o 1.4 metres at 51 g/t gold from 142 metres in DFS266
o 2 metres at 17.7 g/t gold from 145 metres in DFS015
o 7 metres at 16.8 g/t gold from 268 metres in DFS058
o 4 metres at 7.6 g/t gold from 288 metres in DFS445
o 6 metres at 7.4 g/t gold from 220 metres in DFS427
o 9 metres at 7 g/t gold from 238 metres in DFS423
o 4 metres at 5.5 g/t gold from 31 metres in DFS490
o 6 metres at 4.2 g/t gold from 183 metres in DFS436
o 14 metres at 3.9 g/t gold from 204 metres in DFS351
• Infill program 74% complete with 313 holes and 58,311 metres drilled
• Infill program at Baldock should be complete in December Quarter followed
by Extensional drilling focussed on resource growth
Managing Director, Paul Brennan commenting on the new results noted:
“We continue to see drill intersections with substantial width and grade that build the quality of
the current Mineral Resource Estimate at Baldock.
The 80,000 metre infill drilling program at Baldock will allow a significant portion of the inferred
resource to be converted into indicated resource and thence to Probable Reserves.
We are targeting a Maiden Ore Reserve for Baldock by the middle of next year which we expect
to support an initial 5 – 6 Year Reserve Life at Baldock. With the infill drilling program now 74%
complete and ongoing confirmatory results we have good reason to be optimistic in achieving
that outcome.”
1
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
2
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
the infill drilling program at its Mt Ida Gold Project located 540km northeast of Perth in the
Goldfields region of Western Australia (Figure 10). The Mt Ida Gold Project covers 26km of
prospective greenstone belt, folded around the Copperfield Granite (Figure 11).
Three drill rigs, comprising two Reverse Circulation and one Diamond, are currently undertaking
the infill drilling program with the diamond drilling intersecting visible gold intersections on a
regular basis (Error! Reference source not found.).
Figure 1 - Mineralised Interval from infill drill hole DFS266 – 1.4 metres at 51 g/t gold from the 2140 lode consisting of
massive pyrite-chalcopyrite in a silica matrix with visible gold.
Compelling Infill drilling results to drive resource conversion
The current release of infill assay results from the Baldock gold deposit includes 80 drill holes
for 14,771 metres that have been drilled at the northern, central and southern parts of the
Baldock zone (Figures 3-9).
The current infill drilling program is designed to increase the confidence of the existing Mineral
Resource Estimate at Baldock and aims to upgrade the resource classification from inferred to
indicated categories.
The infill drilling program is approximately 74% complete. As noted on page 1, the drilling
intersected multiple holes with high grade intersections.
3
ASX: BM1
ballardmining.com.au
Resource Development Strategy
The strategy for the Phase One infill drilling is to convert an initial 400,000-500,000 ounces of
the current 930koz at 4.1 g/t2
Baldock deposit such that Probable Reserves can then be
established. This will provide the basis for an initial 5 – 6 Year mine Reserve at Baldock.
The Company is currently focussed on just five major lodes (1090, 1100, 2140, 2120, and 2160)
out of a total of 47 lodes. Many of the results in this announcement are from outside these five
lodes and fall into open pit resource optimisation shells which should add to the overall mineral
resource at Baldock.
The full assay results table is set out in Appendix B, and outlines which results are included
within the current Mineral Resource Estimate, and those which fall outside.
Infill and Extensional Drilling Schedule
Phase one infill drilling (20m by 20m) is 74% complete with 19,255 metres remaining to drill.
This program should be completed at the end of November / early December. Extensional
drilling will then commence at Baldock which is designed to add additional resources (Figure
2).
Figure 2 - FY2026 Baldock Work Streams
2
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the
Supplementary Prospectus lodged with ASIC and dated 17 June 2025) for further information on the
MRE
4
ASX: BM1
ballardmining.com.au
Figure 3 - Baldock infill drill hole locations reported in this ASX release overlaid on gold mineral resource
outlines.
5
ASX: BM1
ballardmining.com.au
Figure 4 – Detailed drilling location plan (Baldock area) showing significant gold intersections reported in this
announcement.
6
ASX: BM1
ballardmining.com.au
Figure 5 - Detailed drilling location plan (Meteor North) showing significant gold intersections reported in this
announcement.
7
ASX: BM1
ballardmining.com.au
Figure 6 - Cross section A-A’ showing multiple new assay intersections including 9 metres at 7g/t gold in DFS423
in the Baldock 1090 lode. Pit Shells shown are conceptual
8
ASX: BM1
ballardmining.com.au
Figure 7 - Cross section B-B’ of new assay intersection of 6 metres at 7.4 g/t gold in in DFS427 in the Baldock 1090
lode. Pit Shells shown are conceptual
9
ASX: BM1
ballardmining.com.au
Figure 8 - Cross section C-C’ of new assay intersection of 7 metres at 16.8 g/t gold, in DFS058 at Baldock within the
1100 lode
10
ASX: BM1
ballardmining.com.au
Figure 9 – Long section of the 2140 lode covering 900 metres of strike showing shallow south plunging high grade
shoots and a new assay result of 1.4 metres at 51 g/t gold in DFS266 at the southern end highlighting a potential
new shoot. Pit shells shown are conceptual
11
ASX: BM1
ballardmining.com.au
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3
million tonnes @3.3g/t Aufor 1.1 million ounces3
of contained gold. The Baldock deposit, which
hosts 930koz @ 4.1g/t3
, forms the basis for future development opportunities at Mt Ida.
Figure 10 Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region
A 130,000m drill program is underway across the Project, targeting 80,000 metres of infill and
50,000 metres regional exploration program testing highly prospective and underexplored
zones along the 26km strike of both the Baldock Thrust and the Ballard Fault (Figure 11).
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and Native Vegetation Clearing Permit.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval for up to 2.0 Mtpa Processing and Tails Storage Facility has been received and
an additional 2.5 GL/yr water abstraction license is pending.
3
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
12
ASX: BM1
ballardmining.com.au
Figure 11 – Mt Ida identified Au prospects with planned infill and Phase 1 exploration programs
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
13
ASX: BM1
ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3 g/t Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open pit and underground mining approvals with a Works Approval for a 2.0 Mtpa Processing Plant and Tailings Storage
Facility. Ballard is rapidly advancing the Mt Ida Project through a dual stream plan to increase confidence in the current MRE and
increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
14
ASX: BM1
ballardmining.com.au
Appendix A: April 20254
Mineral Resource Estimate
4
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces
(000s) g/t Au (000s) (000s) g/t Au (000s) (000s) g/t Au (000s)
Baldock 2,600 4.5 365 1,570 3.6 200 4,120 4.2 563
Kestrel - - - 940 1.6 48 940 1.6 48
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 711 1.3 30 711 1.3 30
West Knell 238 3.3 25 238 3.3 25
Jupiter 50 1.7 3 50 1.7 3
Mt Ida Tailings - - - 500 0.5 8 500 0.5 8
Baldock 242 4.8 37 2,610 4.0 338 2,850 4.0 368
Kestrel - - - 80 1.8 5 80 1.8 5
Bombay 30 3.0 3 30 3.0 3
West Knell 192 2.4 15 192 2.4 15
Jupiter 90 2.7 8 90 2.7 8
Baldock 2,840 4.5 402 4,220 3.9 532 7,000 4.1 930
Kestrel - - 1,000 1.7 53 1,000 1.7 53
Golden Vale - - - 496 1.7 27 496 1.7 27
Bombay 740 1.4 33 740 1.4 33
West Knell 420 2.9 40 420 2.9 40
Jupiter 140 2.3 11 140 2.3 11
Mt Ida Tailings 500 0.5 8 500 0.5 8
Total 2,840 4.5 402 7,500 3.0 699 10,310 3.3 1,102
Total
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Cut off Deposit
Indicated Inferred
15
ASX: BM1
ballardmining.com.au
Appendix B: Recent Project Data
Appendix B1: Recent Significant Intercepts reported in this announcement
* Intersections reported about 0.5 g/t with a maximum of 2 metres of internal dilution
* Blank Cu values indicate that Cu assays have not yet been received
Hole ID From To Length Gold g/t Lode
DFS266 142 144 1.4 51.0 2140
DFS015 145 147 1.9 17.7 1090
DFS058 268 272 7.0 16.8 1100
DFS061 146 148 2.2 10.0 1100
DFS427 220 222 6.0 7.4 1090
DFS423 243 247 9.0 7.0 1090
DFS357 214 216 2.0 6.9 2140
DFS343 156 159 3.0 6.9 2140
DFS355 110 112 2.0 5.1 2141
DFS352 243 244 1.0 4.0 2140
DFS351 204 218 14.0 3.9 2140
DFS370 230 231 1.0 2.9 2140
DFS364 198 206 8.0 2.9 2140
DFS362 243 246 3.0 2.6 2140
DFS354 127 132 5.0 2.5 2141
DFS352 228 230 2.0 2.4 2140
DFS427 216 217 1.0 2.3 1089
DFS364 40 41 1.0 2.1 2161
DFS338A 102 106 4.0 2.0 2141
DFS345 222 224 2.0 2.0 2140
DFS355 143 146 3.0 1.8 2141
DFS309 147 148 1.0 1.8 2140
DFS368 183 184 1.0 1.7 2141
DFS423 253 257 4.0 1.6 1090
DFS345 207 211 4.0 1.5 2141
DFS351 49 51 2.0 1.2 2161
DFS352 58 59 1.0 1.1 2161
DFS368 24 30 6.0 1.1 2161
DFS291 199 201 2.0 1.1 2140
DFS368 169 170 1.0 1.0 2141
DFS350 164 165 1.0 1.0 2141
DFS357 222 223 1.0 0.9 2140
DFS350 156 158 2.0 0.8 2141
DFS222 134 135 1.0 0.8 2200
DFS352 234 235 1.0 0.8 2140
DFS362 72 74 2.0 0.8 2161
16
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS357 52 53 1.0 0.8 2161
DFS351 193 195 2.0 0.7 2141
DFS522 16 17 1.0 0.7 2180
DFS368 33 35 2.0 0.7 2161
DFS344 161 165 4.0 0.7 2141
DFS362 241 242 1.0 0.7 2141
DFS364 49 50 1.0 0.7 2161
DFS364 208 209 1.0 0.6 2140
DFS455 306 307 1.0 0.6 1100
DFS349 117 119 2.0 0.5 2141
DFS180A 62 62 0.4 9.8 Pit
DFS381 124 125 0.9 6.8 Pit
DFS490 31 35 4.0 5.5 Pit
DFS517 51 53 2.0 4.9 Pit
DFS437 201 204 3.0 4.8 Pit
DFS061 182 185 2.9 4.4 Pit
DFS436 183 189 6.0 4.2 Pit
DFS144 204 205 0.9 3.4 Pit
DFS416 138 139 1.0 3.3 Pit
DFS446 275 276 1.0 3.1 Pit
DFS446 167 168 1.0 3.1 Pit
DFS058 274 277 3.0 3.0 Pit
DFS156 219 222 3.0 2.8 Pit
DFS144 141 142 0.7 2.7 Pit
DFS455 219 224 5.0 2.5 Pit
DFS381 119 121 1.4 2.3 Pit
DFS342 97 101 4.0 2.3 Pit
DFS520 36 38 2.0 2.3 Pit
DFS523 37 40 3.0 2.2 Pit
DFS427 75 76 1.0 2.2 Pit
DFS447 333 336 3.0 1.9 Pit
DFS425 182 183 1.0 1.7 Pit
DFS518 28 31 3.0 1.7 Pit
DFS015 64 67 3.0 1.7 Pit
DFS445 152 154 2.0 1.6 Pit
DFS381 115 115 0.5 1.6 Pit
DFS343 208 209 1.0 1.5 Pit
DFS519 61 64 3.0 1.5 Pit
DFS381 132 134 1.4 1.5 Pit
DFS061 130 132 2.1 1.5 Pit
DFS425 176 178 2.0 1.4 Pit
17
ASX: BM1
ballardmining.com.au
Hole ID From To Length Gold g/t Lode
DFS210 116 120 4.0 1.4 Pit
DFS425 192 195 3.0 1.3 Pit
DFS520 47 49 2.0 1.2 Pit
DFS440 182 183 1.0 1.2 Pit
DFS416 32 36 4.0 1.2 Pit
DFS436 112 116 4.0 1.0 Pit
DFS455 308 309 1.0 1.0 Pit
DFS447 192 193 1.0 0.9 Pit
DFS344 224 225 1.0 0.9 Pit
DFS163 136 137 1.0 0.9 Pit
DFS445 290 292 4.0 7.6 Outside MRE
DFS106 192 193 1.6 3.0 Outside MRE
DFS428 233 235 2.0 2.8 Outside MRE
DFS447 291 299 8.0 2.3 Outside MRE
DFS180A 32 35 2.5 1.8 Outside MRE
DFS386 131 132 0.6 1.6 Outside MRE
DFS163 106 107 0.3 1.6 Outside MRE
DFS180A 20 25 5.5 1.3 Outside MRE
DFS015 61 62 1.0 1.1 Outside MRE
DFS266 93 94 1.2 1.0 Outside MRE
DFS212 NSI
DFS224 NSI
DFS224A NSI
DSF236 NSI
DFS275 NSI
DFS276 NSI
DFS294 NSI
DFS301 NSI
DFS309 NSI
DFS323 NSI
DFS338 NSI
DFS365 NSI
DFS366 NSI
DFS489 NSI
DFS514 NSI
18
ASX: BM1
ballardmining.com.au
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth East North RL Azi Dip
AURD027A 47 252,675 6,779,531 487 57.3 - 60.3
DFS010 163 253,319 6,778,401 475 56.5 - 60.7
DFS015 187 253,300 6,778,439 479 55.6 - 61.7
DFS018 180 253,237 6,778,395 475 54.9 - 60.7
DFS058 310 253,209 6,778,501 474 58.2 - 60.3
DFS061 192 253,259 6,778,634 472 54.4 - 60.4
DFS106 238 253,031 6,778,717 472 55.4 - 59.7
DFS144 234 252,941 6,778,823 470 53.5 - 58.5
DFS156 223 252,912 6,778,867 470 55.5 - 61.2
DFS163 160 252,973 6,778,976 469 56.4 - 59.4
DFS180A 84 253,325 6,778,660 470 53.7 - 59.4
DFS201 222 252,573 6,778,884 472 55.6 - 59.3
DFS210 138 252,595 6,778,947 474 55.1 - 58.2
DFS212 198 252,563 6,778,925 474 55.2 - 58.6
DFS222 150 252,575 6,778,982 471 55.2 - 59.0
DFS224 162 252,532 6,778,952 471 55.3 - 58.3
DFS224A 120 252,534 6,778,953 471 58.2 - 58.3
DFS236 102 252,525 6,779,000 471 56.7 - 58.2
DFS266 181 252,842 6,779,071 469 56.6 - 60.7
DFS275 156 252,825 6,779,105 470 55.0 - 60.5
DFS276 192 252,810 6,779,094 470 56.0 - 60.4
DFS291 234 252,763 6,779,108 470 55.2 - 60.1
DFS294 120 252,824 6,779,176 469 53.7 - 60.8
DFS301 194 252,753 6,779,151 470 52.3 - 61.0
DFS309 186 252,691 6,779,302 469 52.1 - 61.1
DFS323 70 252,646 6,779,320 469 54.3 - 60.9
DFS338 55 252,614 6,779,371 468 52.5 - 59.2
DFS338A 186 252,615 6,779,371 468 57.0 - 60.6
DFS342 180 252,616 6,779,397 469 51.2 - 60.8
DFS343 216 252,599 6,779,386 468 56.8 - 60.4
DFS344 240 252,584 6,779,377 468 54.4 - 60.4
DFS345 270 252,570 6,779,365 468 56.7 - 60.7
DFS346 270 252,555 6,779,354 468 54.0 - 60.4
DFS348 168 252,611 6,779,419 468 55.1 - 59.8
DFS349 192 252,594 6,779,409 468 54.1 - 61.1
DFS350 210 252,581 6,779,400 468 57.4 - 59.9
DFS351 234 252,565 6,779,388 468 51.6 - 60.0
DFS352 264 252,552 6,779,379 468 56.2 - 59.9
DFS353 150 252,616 6,779,444 468 56.1 - 58.9
DFS354 180 252,602 6,779,434 468 54.0 - 60.0
DFS355 192 252,586 6,779,423 468 56.1 - 59.8
19
ASX: BM1
ballardmining.com.au
Hole ID Depth East North RL Azi Dip
DFS356 228 252,568 6,779,411 468 54.5 - 60.3
DFS357 252 252,554 6,779,403 468 53.6 - 60.5
DFS362 246 252,539 6,779,415 468 55.7 - 61.0
DFS364 216 252,545 6,779,445 468 55.8 - 60.9
DFS365 234 252,530 6,779,434 468 55.5 - 60.2
DFS366 150 252,576 6,779,493 467 57.0 - 60.4
DFS368 192 252,547 6,779,474 467 56.3 - 60.9
DFS370 264 252,515 6,779,448 468 54.0 - 60.7
DFS381 193 252,453 6,779,658 466 55.3 - 59.4
DFS386 160 252,438 6,779,694 466 55.8 - 60.8
DFS416 180 253,422 6,778,271 473 55.1 - 60.2
DFS417 186 253,407 6,778,258 473 53.7 - 60.0
DFS418 210 253,391 6,778,247 473 52.9 - 59.9
DFS419 228 253,375 6,778,235 474 52.4 - 61.3
DFS420 240 253,358 6,778,224 474 53.5 - 60.6
DFS421 264 253,343 6,778,212 474 54.1 - 60.5
DFS423 258 253,337 6,778,233 474 55.4 - 60.2
DFS425 198 253,369 6,778,280 473 54.1 - 59.3
DFS426 204 253,354 6,778,269 474 54.4 - 59.1
DFS427 228 253,338 6,778,258 474 54.3 - 60.3
DFS428 252 253,322 6,778,247 474 54.9 - 60.1
DFS436 216 253,328 6,778,304 473 54.1 - 59.8
DFS437 234 253,314 6,778,293 474 53.7 - 59.6
DFS440 318 253,316 6,778,316 473 54.5 - 60.2
DFS445 294 253,329 6,778,350 475 54.9 - 62.4
DFS446 282 253,312 6,778,341 474 55.1 - 62.5
DFS447 336 253,301 6,778,328 474 56.9 - 62.6
DFS455 335 253,277 6,778,338 475 55.3 - 61.8
DFS489 32 252,371 6,780,104 464 56.6 - 60.6
DFS490 66 252,356 6,780,093 464 54.7 - 60.7
DFS514 60 252,188 6,780,283 462 55.2 - 60.7
DFS516 60 252,186 6,780,306 462 58.3 - 60.3
DFS517 60 252,175 6,780,298 462 56.7 - 60.1
DFS518 48 252,175 6,780,323 462 55.7 - 60.1
DFS519 72 252,154 6,780,308 462 57.2 - 60.5
DFS520 60 252,160 6,780,336 462 53.8 - 60.7
DFS521 102 252,148 6,780,328 462 55.8 - 60.4
DFS522 37 252,357 6,780,123 464 56.4 - 60.5
DFS523 68 252,343 6,780,114 464 57.2 - 60.3
20
ASX: BM1
ballardmining.com.au
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Gold Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria Explanation Commentary
Sampling
techniques
Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
pulverised to produce a 30 g charge for
fire assay’). In other cases, more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
• Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
• RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
• Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
• Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
• Historic core has been cut and sampled to
geological intervals
• These methods of sampling are considered to be
appropriate for this style of exploration
• No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
• It is assumed that these were collected and
assayed using industry standard practices
21
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Drilling
techniques
Drill type (eg core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, face-
sampling bit or other type, whether core
is oriented and if so, by what method,
etc).
• RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling & PXD, RC drilling
utilised an Explorac 220RC rig, T66 Schramm RC
Rig with a 143 mm face sampling hammer bit, DD
drilling was completed by a truck mounted
Sandvik DE820 and a KWL 1500 and has been a
combination of PQ2, HQ2 and NQ2 diameter.
• Diamond tails average 200-300m depth
• Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
• Historic DD drilling was NQ sized core
• It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Drill sample
recovery
Method of recording and assessing core
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
• Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
• Recovery on diamond core is recorded by
measuring the core metre by metre
• Limited sample recovery and condition
information has been supplied or found for
historic drilling
Logging Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
• Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
• Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
• All RC chip trays, and drill core are photographed
in full
• A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
• It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
• No historic core or chip photography has been
supplied
• Historic comments on logging are very useful in
to verify geological details between lithologies.
• Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
22
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry. For all sample
types, the nature, quality and
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
duplicate/second-half sampling.
Whether sample sizes are appropriate to
the grain size of the material being
sampled.
• DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
• Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
• Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
• RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
• Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
• Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
• An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
• Ballard have recently amended the Photon
methodology to carry out analysis on Pulverised
material rather than crushed material, studies
suggest the results are comparable.
• RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
• The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
• Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
• Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
• Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
23
ASX: BM1
ballardmining.com.au
Criteria Explanation Commentary
Quality of assay
data and
laboratory tests
The nature, quality and appropriateness
of the assaying and laboratory
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and precision
have been established.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
• Samples have been analysed by external
laboratories utilising industry standard methods
• The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
• Photon assay is a non-destructive total analysis
technique
• Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
• QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
• All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
• Limited historic QAQC data has been supplied,
industry standard best practice is assumed
Verification of
sampling and
assaying
The verification of significant
intersections by either independent or
alternative company personnel. The use
of twinned holes. Documentation of
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
• Significant intercepts have been reviewed by
senior personnel
• No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
• Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data w