High Grade Infill and Extensional Drill Results at Mt Ida
Released
Released
Announcement PDF
ASX Announcement – 26th August 2025
BROAD HIGH GRADE RESOURCE
EXTENSION & INFILL RESULTS
HIGHLIGHTS
•
Further Baldock Infill results received confirming and increasing confidence in
the existing high-grade resource. Highlights include:
o 4 metres @ 32g/t gold from 232 metres in DFS066B
o 7 metres @ 16.8g/t gold from 267 metres in DFS058
o 13 metres @ 3.4g/t gold from 20 metres in DFS512
o 7 metres @ 6.3g/t gold from 94 metres in DFS273
o 6 metres @ 7g/t gold from 78 metres in DFS269
o 8 metres @ 3.9g/t gold from 24 metres in DFS268
o 4 metres @ 7.4g/t gold from 207 metres in DFS008
o 4 metres @ 5.9 g/t gold from 189 metres in DFS305
o 6 metres at 3.6 g/t gold from 250 metres in DFS059
o 1 metre at 27 g/t gold from 129 metres in DFS264A
•
Initial Baldock extensional drilling results received, potentially extending the
2160 lode a further 160 metres up dip. Highlights include:
o 14 metres at 11.3 g/t gold from 14m in DFS284
•
Exploration drilling advancing with three prospects tested to date. First assay
results expected in September.
Commenting on the results, Geology Manager Todd Hibberd said:
“The new high-grade infill and resource extension results are very pleasing, particularly the first
extensional result of 14 metres at 11.3 g/t gold which highlights the potential of the mineral
resource to increase in size as drilling progresses. We are rapidly progressing through the infill
program which is approximately 40% complete and then will focus on extensional drilling at
Baldock.
On the exploration growth work stream, we have now drill tested the first three prospects and
are systematically making our way through the Phase 1 drill program. First assays are
anticipated in September, and these will be used to inform the Phase 2 drill program, along with
the structural interpretation of the high-resolution Aero Mag survey which will also be
completed in September”.
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on
extensional and infill drilling programs at its Mt Ida Gold Project located 540km northeast of
Perth in the Goldfields region of Western Australia (Figure 5). The Mt Ida Gold Project covers
26km of prospective greenstone belt, folded around the Copperfield Granite (Figure 6).
Baldock Extensional Drilling
During the infill drilling program targeting the 2140 and 2161 lodes, DFS 284 intersected 14
metres at 11.3 g/t gold from 14 metres. The area surrounding the intersection is not currently
in the mineral resource estimate (Figure 1 and 2). The new intersection and historical
intersections to the north potentially support the interpretation that the 2160 lode extends to
the surface (see Figure 2 showing interpreted extension of 2160 lode as dashed lines).
Additional DFS drilling around these intersections is underway with the objective of including
this area in the next resource update.
Further Baldock Infill Drilling Results
The current release of infill results comprises 71 drill holes for 10,456 metres that have been
mainly drilled at the northern end of the Baldock zone to convert inferred resources to indicated
resources (Figure 1). The infill drilling program is approximately 40% complete. As noted on
page 1, the drilling intersected multiple holes with higher grade intersections including:
•
4 metres @ 32g/t gold from 232 metres in DFS066B
•
7 metres @ 16.8g/t gold from 267 metres in DFS058
•
13 metres @ 3.4g/t gold from 20 metres in DFS512
•
7 metres @ 6.3g/t gold from 94 metres in DFS273
•
6 metres @ 7g/t gold from 78 metres in DFS269
•
8 metres @ 3.9g/t gold from 24 metres in DFS268
•
4 metres @ 7.4g/t gold from 207 metres in DFS008
•
4 metres @ 5.9 g/t gold from 189 metres in DFS305
•
6 metres at 3.6 g/t gold from 250 metres in DFS059
•
1 metre at 27 g/t gold from 129 metres in DFS264A
The current infill drilling program is designed to increase the confidence of the existing Mineral
Resource at Baldock and aims to upgrade the Resource classification from Inferred to Indicated
categories and to increase the overall size of the mineral resource.
The full assay results table is outlined in Appendix B. Drilling continues to confirm and extend
the existing mineral resource estimate.
ASX: BM1
ballardmining.com.au
2
Figure 1 - Baldock infill drilling covered in this ASX release over gold resource area showing
selected infill and extensional results
ASX: BM1
ballardmining.com.au
3
Figure 2 - Cross section of new assay intersection of 14 metres at 11.3 g/t gold, potentially an
extension of the 2160 lode
ASX: BM1
ballardmining.com.au
4
Figure 3 - Cross section of new assay intersection of 7.1 metres at 16.8 g/t gold, within the
1100 lode.
ASX: BM1
ballardmining.com.au
5
Figure 4 - Cross section of new assay intersection of 13 metres at 3.4 g/t gold, within the 2140 lode
Mt Ida Exploration Drilling – Growth
The first three of an initial 18 exploration targets have now been drill tested as part of a staged
drill program (Figure 6). These 18 prospects are the basis for the first pass Phase 1 exploration
program while Phase 2 will focus on follow up drilling from Phase 1 as well as additional targets
identified via the detailed structural interpretation of the high-resolution drone mag survey.
The Company also expects to release assay results for exploration drilling at the Dickson,
Neptune and Pulsar prospects in September.
ASX: BM1
ballardmining.com.au
6
Project Background
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3
million tonnes @ 3.3g/t Au for 1.1 million ounces 1 of contained gold. The Baldock deposit, which
hosts 930koz @ 4.1g/t1 forms the basis for future development opportunities at Mt Ida.
Figure 5 Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
A 130,000m drill program is underway across the Project, targeting highly prospective and
underexplored zones along the 26km strike of both the Baldock Thrust and the Ballard Fault
(Figure 6).
The Project includes six granted mining leases and is fully permitted for mining including an
approved Mining Proposal, Mine Closure Plan and no Native Title claims currently exist over the
tenements.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit.
A Works Approval application for up to 1.5Mtpa Processing and Tails Storage has been
submitted and is currently under assessment.
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
1
ASX: BM1
ballardmining.com.au
7
Figure 6 – Mt Ida identified Au prospects with planned infill and Phase 1 exploration programs
-END-
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
ASX: BM1
ballardmining.com.au
8
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3g/Au, strong balance sheet and an experienced team driving
the project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open cut and underground mining approvals with a works approval for a 1.5Mtpa processing facility submitted to DWER and
under assessment. Ballard is rapidly advancing the Mt Ida project through a strategic plan to increase confidence in the current
MRE and also increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr Todd Hibberd, a
Competent Person who is a Member of the Australasian Institute of mining and Metallurgy (AusIMM). Mr. Hibberd has sufficient
experience that is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration
Results, Mineral Resources and Ore Reserves’ (“JORC Code”). Mr. Hibberd consents to the inclusion in this announcement of the
matters based on his information in the form and context in which it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms
that the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the
date of this release, except as required by applicable laws and the ASX Listing Rules.
ASX: BM1
ballardmining.com.au
9
Appendix A: April 2025 2 Mineral Resource Estimate
Cut off
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Deposit
Tonnes
(000s)
Indicated
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Inferred
Grade Ounces
g/t Au
(000s)
Total
Grade
g/t Au
Ounces
(000s)
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Baldock
Kestrel
Bombay
West Knell
Jupiter
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Total
2,600
4.5
365
1,570
3.6
200
-
-
-
940
1.6
48
4,120
4.2
563
940
1.6
-
-
-
496
1.7
48
27
496
1.7
711
27
1.3
30
711
1.3
30
238
3.3
25
238
3.3
25
50
1.7
3
50
1.7
3
Tonnes
(000s)
-
-
-
500
0.5
8
500
0.5
8
242
4.8
37
2,610
4.0
338
2,850
4.0
368
-
-
-
2,840
4.5
-
-
-
-
2,840
4.5
402
-
402
80
1.8
5
80
1.8
5
30
3.0
3
30
3.0
3
192
2.4
15
192
2.4
15
90
2.7
8
90
2.7
8
4,220
3.9
532
7,000
4.1
930
1,000
1.7
53
1,000
1.7
53
496
1.7
27
496
1.7
27
740
1.4
33
740
1.4
33
420
2.9
40
420
2.9
40
140
2.3
11
140
2.3
11
500
0.5
8
500
0.5
7,500
3.0
699
10,310
3.3
8
1,102
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
2
ASX: BM1
ballardmining.com.au
10
Appendix B: Recent Project Data
Appendix B1: Recent Significant Intercepts reported in this announcement
* Blank Cu values indicate that Cu assays have not yet been received
Hole ID
DFS007
DFS007
DFS007
DFS007
DFS008
DFS008
DFS015
DFS015
DFS015
DFS027
DFS027
DFS058
DFS058
DFS059
DFS059
DFS059
DFS059
DFS066B
DFS066B
DFS066B
DFS088
DFS088
DFS088
DFS262
DFS263
DFS263
DFS264A
DFS264A
DFS265
DFS267
DFS268
DFS269
DFS270
DFS270
DFS270
DFS270
DFS271
From
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
3
189
279
207
61
64
71
268
276
94
250
260
177
233
238
74
83
151
96
38
121
129
139
85
24
78
45
111
129
134
98
To
1
4
190
281
3
211
8
62
67
4
72
275
277
6
95
256
262
178
237
239
76
84
154
97
41
122
130
140
87
4
32
84
47
112
130
135
99
Length
1.00
1.00
1.00
2.00
3.00
4.00
8.00
1.00
3.00
4.00
1.00
7.15
0.97
6.00
1.00
6.00
2.00
1.00
4.05
0.85
2.18
0.99
3.50
1.00
3.00
1.00
1.00
1.00
2.00
4.00
8.00
6.00
2.00
1.00
1.00
1.00
1.00
Gold g/t
0.52
0.51
1.77
1.15
0.53
7.44
0.84
1.10
1.70
0.61
1.53
16.78
1.38
0.61
5.59
3.60
5.25
0.89
32.74
11.28
1.61
0.50
1.01
6.98
1.79
1.26
27.00
2.05
0.83
0.59
3.91
7.04
1.77
4.48
3.54
1.77
0.59
Copper ppm
198
179
901
302
290
7,755
346
48
19
391
523
ASX: BM1
ballardmining.com.au
406
48
2,095
1,800
2,020
2,636
510
136
160
1,295
309
532
988
402
2,970
409
692
155
11
Hole ID
DFS273
DFS273
DFS273
DFS284
DFS303
DFS303
DFS304
DFS304
DFS305
DFS306
DFS306
DFS306
DFS306
DFS310
DFS310
DFS311
DFS311
DFS313
DFS313
DFS315
DFS315
DFS315
DFS399
DFS399
DFS399
DFS399
DFS422A
DFS422A
DFS422A
DFS470
DFS503
DFS505
DFS506
DFS508
DFS508
DFS509
DFS509
DFS510
DFS511
DFS511
DFS511
From
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
and
24
75
94
14
60
151
74
166
189
68
206
214
253
65
158
78
192
113
272
59
154
159
296
299
335
380
69
90
227
24
44
21
40
30
6
21
To
25
76
101
28
61
152
76
172
193
69
207
215
254
67
159
79
193
115
273
60
155
161
297
299
336
380
70
91
228
7
1
25
45
2
22
1
43
32
2
12
22
Length
1.00
1.00
7.00
14.00
1.00
1.00
2.00
6.00
4.00
1.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
2.00
1.00
1.00
1.00
2.00
0.74
0.34
0.88
0.35
1.00
1.00
1.05
7.00
1.00
1.00
1.00
2.00
1.00
1.00
3.00
2.00
2.00
6.00
1.00
Gold g/t
1.36
1.75
6.29
11.35
8.11
0.51
0.54
1.24
5.89
1.24
1.90
2.77
1.87
0.92
7.04
0.60
9.31
1.69
2.28
0.65
0.89
0.99
1.31
19.18
1.29
2.86
0.54
1.04
3.70
1.27
1.29
0.98
0.94
3.99
0.80
2.36
0.62
1.83
2.25
1.33
1.70
Copper ppm
1,075
472
953
563
608
499
493
1,222
1,810
663
480
968
2,240
945
4,750
1,205
4,700
602
455
1,255
210
436
585
2,070
3,837
646
2,970
1,395
1,749
1,679
1,080
135
675
ASX: BM1
ballardmining.com.au
231
1,028
770
406
12
Hole ID
DFS512
DFS513
DFS524
DFS525
DFS526
DFS527
DFS527
DFS528
DFS529
DFS061
DFS266
DFS272
DFS504
DFS507
From
and
To
20
24
35
-
33
28
6
7
7
6
36
6
6
Length
13.00
4.00
6.00
7.00
7.00
6.00
1.00
6.00
6.00
Gold g/t
3.43
1.38
1.01
1.19
1.30
1.04
1.69
1.12
1.05
Copper ppm
1,123
707
1,075
716
440
NSI
NSI
NSI
NSI
NSI
Appendix B2: Collar Information for holes reported in this announcement
Hole ID Depth
DFS007
294
DFS008
246
DFS015
110
DFS027
225
DFS058
309.9
DFS059
288
DFS061
120
DFS066B 255.9
DFS088
180.7
DFS090
225.7
DFS127
160
DFS144
119
DFS163
90
DFS217
110
DFS229
89
DFS262
116
DFS263
134
DFS264
72
DFS264A
142
DFS265
151
DFS266
50
DFS267
50
DFS268
145
East
253,268
253,256
253,300
253,227
253,209
253,227
253,259
253,193
253,146
253,081
252,909
252,941
252,973
252,578
252,544
252,906
252,889
252,877
252,875
252,844
252,842
252,826
252,809
North
6,778,398
6,778,390
6,778,439
6,778,415
6,778,501
6,778,476
6,778,634
6,778,613
6,778,749
6,778,698
6,778,731
6,778,823
6,778,976
6,778,961
6,778,982
6,779,116
6,779,104
6,779,095
6,779,094
6,779,072
6,779,071
6,779,060
6,779,049
RL
476
475
480
475
474
475
472
471
470
471
471
470
469
471
471
469
469
469
469
469
469
469
469
Azi
54.73
58.93
57.00
55.24
58.23
60.33
54.35
55.42
57.39
55.92
56.13
53.53
56.42
56.29
56.20
56.39
56.46
55.20
54.79
53.04
57.40
56.10
55.14
ASX: BM1
ballardmining.com.au
-
Dip
60.88
60.61
60.97
60.67
60.34
62.11
60.36
62.07
62.16
54.90
58.97
58.51
59.44
59.79
58.80
60.30
60.11
62.16
62.81
54.01
59.53
60.25
60.37
13
Hole ID Depth
DFS269
114
DFS270
144
DFS271
228
DFS272
202
DFS273
132
DFS274
156
DFS275
156
DFS279
114
DFS284
140
DFS303
200
DFS304
221
DFS305
230
DFS306
281
DFS308
101
DFS309
186
DFS310
215
DFS311
237
DFS313
293
DFS314
178
DFS315
162
DFS316
216
DFS321
202
DFS322
220
DFS323
70
DFS325
132
DFS326
186
DFS327
234
DFS328
240
DFS399
387.1
DFS422A 236.6
DFS470
40
DFS503
25
DFS504
47
DFS505
26
DFS506
60
DFS507
66
DFS508
31
DFS509
53
DFS510
79
DFS511
26
DFS512
46
DFS513
78
DFS524
42
East
252,898
252,872
252,826
252,790
252,876
252,875
252,825
252,873
252,784
252,694
252,678
252,663
252,647
252,615
252,691
252,677
252,663
252,632
252,688
252,674
252,659
252,661
252,646
252,646
252,648
252,634
252,619
252,604
253,354
253,349
253,351
252,944
252,930
252,930
252,900
252,885
252,910
252,893
252,872
252,888
252,873
252,862
253,402
North
6,779,135
6,779,116
6,779,085
6,779,060
6,779,140
6,779,139
6,779,105
6,779,161
6,779,098
6,779,280
6,779,269
6,779,258
6,779,247
6,779,224
6,779,302
6,779,292
6,779,283
6,779,262
6,779,324
6,779,315
6,779,304
6,779,330
6,779,320
6,779,320
6,779,345
6,779,335
6,779,325
6,779,315
6,778,098
6,778,243
6,778,502
6,779,188
6,779,171
6,779,201
6,779,183
6,779,173
6,779,215
6,779,204
6,779,187
6,779,247
6,779,236
6,779,229
6,778,526
RL
469
469
470
470
470
469
470
469
470
469
469
469
469
469
469
469
469
469
469
469
469
468
469
469
468
468
469
469
475
474
478
469
469
469
469
469
469
469
470
469
469
470
476
Azi
53.86
53.49
54.20
54.39
54.15
53.74
54.98
54.67
53.37
53.63
55.85
55.27
53.89
55.83
52.05
55.36
55.46
58.58
55.25
54.47
54.96
53.76
54.65
54.28
55.84
55.23
54.63
51.13
56.11
58.69
56.83
55.78
30.06
31.98
53.61
54.85
54.27
56.21
55.98
55.29
53.47
54.63
56.15
ASX: BM1
ballardmining.com.au
-
Dip
60.07
65.85
59.98
60.91
60.77
69.59
60.50
62.46
60.32
60.79
60.43
59.13
60.85
60.14
61.07
60.42
60.67
59.51
60.46
59.86
60.82
60.65
60.16
60.92
60.36
59.98
60.99
59.12
60.86
60.04
59.91
60.26
59.48
59.03
59.92
59.99
60.09
59.44
60.10
59.33
58.70
70.12
60.67
14
Hole ID
DFS525
DFS526
DFS527
DFS528
DFS529
Depth
62
90
38
61
90
East
253,386
253,373
253,414
253,399
253,385
North
6,778,515
6,778,505
6,778,510
6,778,500
6,778,490
RL
479
480
480
477
479
Azi
56.75
55.99
58.30
55.80
55.06
ASX: BM1
ballardmining.com.au
-
Dip
60.43
60.21
60.34
60.98
60.72
15
Appendix C: JORC Code, 2012 Edition
The following table provides a summary of important assessment and reporting criteria used for the reporting of the
Mt Ida Lithium Project Mineral Resource in accordance with the Table 1 checklist in The Australasian Code for the
Reporting of Exploration Results, Mineral Resources and Ore Reserves (The JORC Code, 2012 Edition) on an ‘if not,
why not’ basis.
JORC Table 1: Section 1: Sampling Techniques and Data
Criteria
Explanation
Sampling
Nature and quality of sampling (eg cut
techniques
channels, random chips, or specific
specialised industry standard
Commentary
•
•
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or handheld
XRF instruments, etc). These examples
•
should not be taken as limiting the broad
meaning of sampling. Include reference
to measures taken to ensure sample
representivity and the appropriate
calibration of any measurement tools or
•
systems used. Aspects of the
determination of mineralisation that are
Material to the Public Report. In cases
where ‘industry standard’ work has been
done this would be relatively simple (eg
•
•
•
‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was
•
pulverised to produce a 30 g charge for
Gold sampling activities carried out by Ballard
Mining at the Mt Ida Project include reverse
circulation (RC)and diamond (DD) drilling.
RC samples were collected from a static cone
splitter mounted directly below the cyclone on
the rig; DD sampling was carried out to
lithological/alteration domain with lengths
between 0.3-1.1m
Limited historical data has been supplied,
historic sampling has been carried out by Delta
Lithium, Hammill Resources, International
Goldfields, La Mancha Resources, Eastern
Goldfields and Ora Banda Mining, Hawk
Resources and has included RC, DD, rotary air
blast (RAB) drilling, rock chip and soil sampling.
Sampling of historic RC has been carried out via
riffle split for 1m sampling, and scoop or spear
sampling for 4m composites, historic RAB drilling
was sampled via spear into 4m composites
Historic core has been cut and sampled to
geological intervals
These methods of sampling are considered to be
appropriate for this style of exploration
No records are available on the exact
methodology of historic rock chip / grab /soil
sampling
It is assumed that these were collected and
assayed using industry standard practices
fire assay’). In other cases more
explanation may be required, such as
where there is coarse gold that has
inherent sampling problems. Unusual
commodities or mineralisation types (eg
submarine nodules) may warrant
disclosure of detailed information
ASX: BM1
ballardmining.com.au
16
Criteria
Explanation
Drilling
Drill type (eg core, reverse circulation,
techniques
open-hole hammer, rotary air blast,
Commentary
•
auger, Bangka, sonic, etc) and details
(eg core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether core
is oriented and if so, by what method,
etc).
Drill sample
Method of recording and assessing core
recovery
and chip sample recoveries and results
assessed. Measures taken to maximise
sample recovery and ensure
representative nature of the samples.
•
•
•
•
•
•
•
Whether a relationship exists between
sample recovery and grade and whether
RC Drilling has been carried out by Orlando
Drilling, Frontline Drilling & PXD, RC drilling
utilised an Explorac 220RC rig, T66 Schramm RC
Rig with a 143 mm face sampling hammer bit, DD
drilling was completed by a truck mounted
Sandvik DE820 and a KWL 1500 and has been a
combination of PQ2, HQ2 and NQ2 diameter.
Diamond tails average 200-300m depth
Historic drilling has been completed by various
companies including Kennedy Drilling, Wallis
Drilling, Ausdrill and unnamed contractors
Historic DD drilling was NQ sized core
It is assumed industry standard drilling methods
and equipment were utilised for all historic
drilling
Sample condition is recorded for every RC drill
metre including noting the presence of water or
minimal sample return, inspections of rigs were
carried out daily
Recovery on diamond core is recorded by
measuring the core metre by metre
Limited sample recovery and condition
information has been supplied or found for
historic drilling
sample bias may have occurred due to
preferential loss/gain of fine/coarse
material.
Logging
Whether core and chip samples have
•
been geologically and geotechnically
logged to a level of detail to support
appropriate Mineral Resource
estimation, mining studies and
metallurgical studies. Whether logging is
qualitative or quantitative in nature.
•
•
•
Core (or costean, channel, etc)
photography. The total length and
percentage of the relevant intersections
logged.
•
•
•
•
Quantitative and qualitative geological logging of
drillholes adheres to company policy and
includes lithology, mineralogy, alteration, veining
and weathering
Diamond core logging records lithology,
mineralogy, alteration, weathering, veining, RQD,
SG and structural data
All RC chip trays, and drill core are photographed
in full
A complete quantitative and qualitative logging
suite was supplied for historic drilling including
lithology, alteration, mineralogy, veining and
weathering
It is unknown if all historic core was oriented,
limited geotechnical logging has been supplied
No historic core or chip photography has been
supplied
Historic comments on logging are very useful in
to verify geological details between lithologies.
Logging is of a level suitable to support Mineral
resource estimates and subsequent mining
studies
ASX: BM1
ballardmining.com.au
17
Criteria
Explanation
Sub-sampling
If core, whether cut or sawn and
techniques and
whether quarter, half or all core taken.
sample
If non-core, whether riffled, tube
preparation
sampled, rotary split, etc and whether
Commentary
•
•
sampled wet or dry. For all sample
types, the nature, quality and
•
appropriateness of the sample
preparation technique.
Quality control procedures adopted for
•
all sub-sampling stages to maximise
representivity of samples.
•
Measures taken to ensure that the
sampling is representative of the in situ
material collected, including for
instance results for field
•
duplicate/second-half sampling.
Whether sample sizes are appropriate to
•
the grain size of the material being
sampled.
•
•
•
•
•
•
DD sampling is undertaken by
lithological/alteration domain to a maximum of
1.1m and a minimum of 0.3m. Core is cut in half
with one half sent to the lab and one half retained
in the core tray
Occasional wet RC samples are encountered;
extra cleaning of the splitter was carried out
afterward
Should over 6 samples in a row be wet, the hole
will be abandoned if it is aimed to be used in an
MRE, with the intention of Diamond tailing it to
retain sample quality.
RC and DD samples have been analysed for Au
by 50g fire assay in the past by ALS, Nagrom, NAL
and SGS, and via photon assay by ALS
Samples analysed by via fire assay at ALS,
Nagrom, NAL and SGS were dried, crushed and
pulverised to 80% passing 75 microns before
undergoing a selected peroxide fusion digest or 4
acid digest with ICPMS finish or fire assay with
ICPMS finish
Samples are now analysed via photon assay at
ALS are dried and crushed to 3mm with 500g of
material utilised for the analysis
An ICP finish is completed post-Photon to
determine values of other analytes ie Cu, As, S
etc)
Ballard have recently amended the Photon
methodology to carry out analysis on Pulverised
material rather than crushed material, studies
suggest the results are comparable.
RC duplicate field samples were carried out at a
rate of 1:20 and were sampled directly from the
splitter on the rig. These were submitted for the
same assay process as the primary samples and
the laboratory are unaware of such submissions
The sampling methodology allows for select
manual duplicates of known graded zones to
improve QAQC
Historic chip sampling methods include single
metre riffle split and 4m composites that were
either scoop or spear sampled, while historic
core was cut onsite and half core sampled
Historic samples were analysed at LLAS,
Genalysis and unspecified laboratories
Historic Au analysis techniques generally
included crushing, splitting if required, and
pulverisation, with aqua regia or fire assay with
AAS finish used to determine concentration
ASX: BM1
ballardmining.com.au
18
Criteria
Explanation
Quality of assay
The nature, quality and appropriateness
•
data and
of the assaying and laboratory
•
laboratory tests
procedures used and whether the
technique is considered partial or total.
Nature of quality control procedures
adopted (eg standards, blanks,
Commentary
•
•
duplicates, external laboratory checks)
and whether acceptable levels of
•
accuracy (ie lack of bias) and precision
have been established.
•
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
•
parameters used in determining the
Samples have been analysed by external
laboratories utilising industry standard methods
The assay methods utilised by ALS, Nagrom, NAL
and SGS for RC chip and core sampling allow for
total dissolution of the sample where required
Photon assay is a non-destructive total analysis
technique
Standards and blanks are inserted at a rate of 1 in
20 in RC and DD sampling, All QAQC analyses
were within tolerance
QAQC reviews are completed on a monthly basis
with any fails being investigated thoroughly in
conjunction with the lab.
All historic samples are assumed to have been
prepared and assayed by industry standard
techniques and methods
Limited historic QAQC data has been supplied,
industry standard best practice is assumed
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation, etc.
Verification of
The verification of significant
•
sampling and
intersections by either independent or
•
assaying
alternative company personnel. The use
of twinned holes. Documentation of
•
primary data, data entry procedures,
data verification, data storage (physical
and electronic) protocols. Discuss any
adjustment to assay data
Location of data
Accuracy and quality of surveys used to
points
locate drill holes (collar and down-hole
•
•
•
•
surveys), trenches, mine workings and
other locations used in Mineral
Resource estimation. Specification of
the grid system used. Quality and
•
•
adequacy of topographic control
•
•
•
Significant intercepts have been reviewed by
senior personnel
No specific twinned holes have been completed,
but drilling has verified historic drilling intervals
Primary data is collected via excel templates and
third-party logging software with inbuilt validation
functions, the data is forwarded to the Database
administrator for entry into a secure SQL
database. Historic data was supplied in various
formats and has been validated as much as
practicable
No adjustments to assay data have been made
Data entry, verification and storage protocols
remain unknown for historic operators
MGA94 zone 51 grid coordinate system is used
Current drilling collars have been pegged using a
DGPS unit, all collars will be surveyed upon
program completion by an independent third
party
All infill drill holes are pegged using a DGPS for
maximum accuracy
Downhole surveys are completed by the drilling
contractors using a true north seeking gyro
instrument, AC drillholes did not have downhole
surveys carried out
Topography has been surveyed by recent
operators. Collar elevations are consistent with
surrounding holes and the natural surface
elevation
Historic collars are recorded as being picked up
by DGPS, GPS or unknown methods and
Share your feedback
Discover