First Infill Results & Exploration Commenced
Released
Released
Announcement PDF
ASX Announcement – 31st July 2025
HIGH GRADE INFILL RESULTS &
EXPLORATION DRILLING UNDERWAY
HIGHLIGHTS
•
Four Rigs (Three Reverse Circulation and one Diamond) are now drilling at Mt Ida
undertaking the planned 130,000m drill program
•
Initial Baldock Infill results received confirming and increasing confidence in
the existing high-grade resource of 930koz1 at 4.1g/t. Highlights include:
o 3m @ 17.7g/t Au from 49m DFS062
o 4m @ 12.0g/t Au from 182m in DFS063
o 4m @ 7.3g/t Au from 146m in DFS146
o 3m @ 7.8g/t Au from 123m in DFS044
•
Reconnaissance rock chips confirm and extend strike up to 700m along
untested high-grade regional structures with results including:
o 62.2g/t Au – MIR328 (Europa Prospect)
o 43.1g/t Au – MIR409 (Sandstone Prospect)
o 23.3g/t Au – MIR451 (Astro – Quasar Prospects)
•
Exploration drilling commenced on initial 18 high priority targets
•
High Resolution Drone Mag survey data received with interpretation ongoing and
final deliverable expected in the coming weeks. Anticipated to generate
additional exploration targets
•
Experienced Geologist and Executive Todd Hibberd to join Ballard Mining
Refer to the Ballard IPO Prospectus lodged with the Australian Securities and Investment Commission (“ASIC”) and
dated 30 May 2025 (as amended by the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) for
further information on the MRE
1
P: +61 8 6466 7500
E: info@ballardmining.com.au
A: Level 2, 18 Richardson Street,
West Perth WA 6005
ASX: BM1
ballardmining.com.au
Commenting on the results, Managing Director Paul Brennan said:
“We are pleased to announce that we have now commenced exploration drilling at Mt Ida, targeting the
initial 18 prospects identified over 26km of prospective strike. Field reconnaissance activities including
mapping and rock chip sampling results continue to provide confidence in the exploration potential at Mt
Ida. Furthermore, with the first confirmatory high-grade infill results now received from Baldock, we
anticipate regular news flow as assays are received for both exploration growth and infill drilling.
I’d also like to welcome highly experienced geologist and mining Executive Todd Hibberd who commences
with Ballard in early August and acknowledge the tireless efforts of Shane Murray from Delta Lithium who
along with his team has progressed Mt Ida to its current status prior to the demerger into Ballard Mining”.
Ballard Mining (ASX:BM1) (“Ballard” or “the Company”) is pleased to provide an update on exploration
and infill drilling programs at its Mt Ida Gold Project located 540km northeast of Perth in the Goldfields
region of Western Australia (Fig.1). The Mt Ida Gold Project covers 26km of prospective greenstone belt,
folded around the Copperfield Granite (Fig.2).
The Mt Ida Gold Project hosts a JORC 2012-compliant Mineral Resource Estimate totalling 10.3 million
tonnes @ 3.3g/t Au for 1.1 million ounces2 of contained gold. The Baldock deposit, which hosts 930koz @
4.1g/t2 forms the basis for future development opportunities at Mt Ida.
Figure 1 – Ballard’s Mt Ida Gold Project, located in Western Australia’s Goldfield Region.
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
2
ASX: BM1
ballardmining.com.au
2
A 130,000m drill program is underway across the Project, targeting highly prospective and underexplored
zones along the 26km strike of both the Baldock Thrust and the Ballard Fault (Fig.2).
The Project includes six granted mining leases and is fully permitted for mining including an approved
Mining Proposal, Mine Closure Plan and no Native Title claims currently exist over the tenements.
Mining approvals are in place for both open pit and underground mining at the Baldock deposit. A Works
Approval application for up to 1.5Mtpa Processing and Tails Storage has been submitted and is currently
under assessment.
Figure 2 – Mt Ida identified Au prospects with planned infill and Phase 1 exploration programs3
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
3
ASX: BM1
ballardmining.com.au
3
Regional Exploration incl. 50,000m drill program
The Mt Ida Gold Project has significant exploration potential outside of known Resource areas in a wellendowed gold district. The Company is undertaking an aggressive drilling exploration campaign which
includes 50,000 metres of drilling on an initial 18 identified prospects.
These 18 prospects have provided the basis for the first-pass Phase 1 exploration program while Phase 2
will focus on follow up drilling from Phase 1 as well as additional targets identified via the detailed
structural interpretation of the high-resolution drone mag survey.
Ballard Fault
Covering the eastern flank of the Mt Ida Project, the 13km-long prospective Ballard Fault is a richly gold
endowed structure which currently hosts the Kestrel (53,000oz), West Knell (40,000oz) and Golden Vale
(27,000oz) Deposits4. These prospects are characterised by a series of substantial historic workings, highgrade rock chips and very limited drilling (Fig. 3). A full review of the database as well as detailed field
mapping campaigns have identified 10 new prospects along the Ballard fault, all of which provide
compelling drill targets.
Recent rock chip results taken while undertaking field reconnaissance has confirmed historical data as
well as extended the mineralised strike in some areas between existing prospects. Table 1 shows results
from some of Ballard’s sampling campaigns which confirms the high-grade nature of the Ballard fault and
regional tenure. The majority of these 10 additional prospects have never been drill tested and will be an
early focus of this Phase 1 exploration campaign.
Sample ID
MIR311
MIR328
MIR409
MIR451
MIR425
MIR334
MIR354
MIR410
MIR366
MIR335
MIR430
MIR431
MIR445
MIR369
MIR367
MIR352
Type
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
East
257247
257384
258401
251359
257376
257223
257837
258403
253108.5
257224
257323
257396
North
6783769
6783081
6775407
6781390
6783079
6782621
6780795
6775382
6779226.18
6782620
6782099
6781709
252680.9
253109.89
253104
257852.06
6779854
6779205.85
6779224.61
6780778.38
Location
West Knell
Europa
Sandstone
Between Astro - Quasar
Europa
Between Pulsar - Ayla
Neptune
Sandstone
Dick
Between Pulsar - Ayla
Pulsar South
Between Neptune - Pulsar
Dick North
Dick
Dick
Neptune
Au gpt
84
62.2
43.1
23.3
22.7
21.2
18.95
15.6
15.3
14.2
13.5
13.35
12.8
11.95
10.65
9.17
Table 1 – BM1’s high grade rock chips returned from prospects - See Appendix B for surface sample information
4Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
ASX: BM1
ballardmining.com.au
4
Figure 3 – Mt Ida Ballard Fault hosting multiple historic workings with current and historic high-grade rock chips ->1g/t
– See Appendix B for surface sampling information and previous announcement for historical information5
Ballard Fault - Neptune Prospect
Located ~10km NNE from the main Baldock deposit on the 13km-long Ballard Fault, the Neptune Prospect
now has an apparent mineralised strike of ~700m representing a high priority target in the current Phase 1
exploration program.
Initial systematic sampling programs (Fig.4) across historic workings and the mineralised trend have
returned additional high-grade rock chip results including 18.9g/t Au (MIR354) which confirms the
historical data from 2003 & 20045. These sampling campaigns also provides the exploration team with an
understanding on the controls of mineralisation and target hosts which will inform the current drill
program.
5Refer to ASX announcement dated 22nd July 2025 “Mt Ida Drill Program Underway”
ASX: BM1
ballardmining.com.au
5
Figure 4 – Neptune Prospect at the Mt Ida Project, with rock chip sampling programs completed across historic
workings over 700m of strike - >1g/t - See Appendix B for surface sampling information and previous announcement
for historical information6
Baldock Infill Drilling Results
The infill drilling program at the Baldock deposit (Fig. 5) is the second component of Ballard’s dual stream
“Grow and Develop” strategy.
The infill drilling program is designed to increase the confidence of the existing Mineral Resource at
Baldock upgrading the Resource classification from Inferred to Indicated categories. The drilling will also
support geotechnical and metallurgical studies to a Feasibility Level of detail which will provide the basis
for a Maiden Ore Reserve at Baldock.
6Refer to ASX announcement dated 22nd July 2025 “Mt Ida Drill Program Underway”
ASX: BM1
ballardmining.com.au
6
Figure 5 – Baldock infill drill plan overlain block model & imagery (left) and drill hole collars overlain the satellite image
showing infill program (right).
Encouraging drilling results have been returned to date including 3m @ 7.8g/t Au from 123m (DFS044)
which can be seen in Figure 7. These results will refine current models and increase confidence with the
intention to develop and derisk the Baldock Resource. The entire 80,000m infill and extensional drilling
program is well underway and fully prepared with earth works complete at every drilling location.
Figure 6 – Multiple instances of visible gold6 throughout DFS058. See figure 7 for reference
6 Cautionary Statement:
Visual estimates of mineral abundance should never be considered a proxy or substitute
for laboratory analyses where concentrations or grades are the factor of principal economic interest. Visual estimates
also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations.
ASX: BM1
ballardmining.com.au
7
Figure 7 – 15 m slice showing Mt Ida Baldock Infill Cross Section N6778595, with current and historic drilling.
Appointment of General Manager of Exploration and Geology
Ballard is pleased to announce that highly experienced Executive Todd Hibberd will join Ballard Mining
commencing 4th August 2025. Mr Hibberd has a wide range of expertise including exploration, resource
estimation, mine development, feasibility studies and production with Newmont Australia. Business
development experience includes extensive evaluation of gold opportunities within the northern goldfields
of Western Australia including assisting St Barbara Limited with the acquisition of Bardoc Gold Limited and
the sale of Gwalia to Genesis Minerals Limited.
-END-
ASX: BM1
ballardmining.com.au
8
This release is authorised by the Board of Directors of Ballard Mining Limited.
For further information visit our website at ballardmining.com.au or contact:
PAUL BRENNAN
Managing Director
info@ballardmining.com.au
About Ballard Mining
Ballard Mining Limited (ASX: BM1) is an exploration and development company focused on advancing its Mt Ida asset towards
production. With current JORC compliant resources of 10.3Mt @ 3.3g/Au, strong balance sheet and an experienced team driving the
project development, Ballard is pursuing a growth and development strategy.
The Mt Ida Project has high grade gold resources with 93% located on granted mining leases. The main Baldock area has received
full open cut and underground mining approvals with a works approval for a 1.5Mtpa processing facility submitted to DWER and
under assessment. Ballard is rapidly advancing the Mt Ida project through a strategic plan to increase confidence in the current
MRE and also increase the global resource inventory via an aggressive exploration program. All modifying factors will be advanced
simultaneously.
Competent Person's Statement
Information in this announcement that relates to exploration results is based upon work undertaken by Mr. Shane Murray, a
Competent Person who is a Member of the Australasian Institute of Geoscientists (AIG). Mr. Murray has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as
a ‘Competent Person’ as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves’ (“JORC Code”). Mr. Murray is an employee of Delta Lithium Limited (ASX:DLI) which provides contract services to
Ballard and consents to the inclusion in this announcement of the matters based on his information in the form and context in which
it appears.
Past Exploration results and Mineral Resource Estimates reported in this announcement have been previously prepared and
disclosed by Ballard in accordance with the JORC Code in its Prospectus lodged with ASIC and dated 30 May 2025 (as amended by
the Supplementary Prospectus lodged with ASIC and dated 17 June 2025) (the Prospectus). The Company confirms that it is not
aware of any new information or data that materially affects the information included in the Prospectus. The Company confirms that
the form and content in which the Competent Person's findings are presented here have not been materially modified from the
Prospectus, and all material assumptions and technical parameters underpinning Mineral Resource Estimates in the Prospectus
continue to apply and have not materially changed. Refer to the Prospectus for further information.
Disclaimer
This release may include forward-looking and aspirational statements. These statements are based on Ballard management’s
expectations and beliefs concerning future events as of the time of the release of this announcement. Forward-looking and
aspirational statements are necessarily subject to risks, uncertainties and other factors, some of which are outside the control of
Ballard, which could cause actual results to differ materially from such statements. Ballard makes no undertaking to subsequently
update or revise the forward looking or aspirational statements made in this release to reflect events or circumstances after the date
of this release, except as required by applicable laws and the ASX Listing Rules.
ASX: BM1
ballardmining.com.au
9
Appendix A: April 20257 Mineral Resource Estimate
Cut off
Open cut Au
0.5 g/t
Underground Au
1.5 g/t
All
Deposit
Tonnes
(000s)
Indicated
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Baldock
Kestrel
Bombay
West Knell
Jupiter
Baldock
Kestrel
Golden Vale
Bombay
West Knell
Jupiter
Mt Ida Tailings
Total
2,600
4.5
365
1,570
3.6
-
-
-
940
1.6
-
-
-
496
Inferred
Grade Ounces
g/t Au
(000s)
Tonnes
(000s)
Total
Grade
g/t Au
Ounces
(000s)
200
4,120
4.2
563
48
940
1.6
48
1.7
27
496
1.7
27
711
1.3
30
711
1.3
30
238
3.3
25
238
3.3
25
50
1.7
3
50
1.7
3
-
-
-
500
0.5
8
500
0.5
8
242
4.8
37
2,610
4.0
338
2,850
4.0
368
-
-
-
80
1.8
5
80
1.8
5
30
3.0
3
30
3.0
3
192
2.4
15
192
2.4
15
2,840
4.5
-
-
-
-
2,840
4.5
402
-
402
90
2.7
8
90
2.7
8
4,220
3.9
532
7,000
4.1
930
1,000
1.7
53
1,000
1.7
53
496
1.7
27
496
1.7
27
740
1.4
33
740
1.4
33
420
2.9
40
420
2.9
40
140
2.3
11
140
2.3
11
500
0.5
8
500
0.5
7,500
3.0
699
10,310
3.3
8
1,102
Refer to the Ballard IPO Prospectus lodged with ASIC and dated 30 May 2025 (as amended by the Supplementary
Prospectus lodged with ASIC and dated 17 June 2025) for further information on the MRE
7
ASX: BM1
ballardmining.com.au
10
Appendix B: Recent Project Data
Appendix B1: Recent Significant Intercepts
* Blank Cu values indicate that Cu assays have not yet been received
Hole ID
IDRD324
and
and
IDRD359
IDRD395
and
and
IDRD403
IDRD406
DFS001
DFS002
and
DFS003A
and
DFS004
and
and
DFS005
and
DFS006
and
and
DFS009
and
DFS010
DFS011
and
and
and
DFS012
and
DFS013
DFS014
and
and
DFS016
and
and
From
To
Length
Au gpt
Cu ppm
153
155
2
1.89
653
241
242
1
2.8
2400
285
286
1
2.11
576
572.74
573.65
0.91
2.27
231
149.8
151.04
1.24
6.12
475
321.63
322.65
1.02
0.82
313
357.26
357.86
0.6
1.54
2900
297
298
1
1.15
906
131
133
2
1.32
1007
0
7
7
1.03
1312
0
9
9
1.32
966
93
97
4
0.79
613
0
6
6
0.77
247
120
121
1
0.63
116
1
6
5
0.79
185
102
103
1
0.97
1085
139
140
1
0.62
1965
0
6
6
0.81
180
159
160
1
2.08
1175
2
6
4
0.65
167
125
126
1
2.12
962
264
265
1
0.69
529
0
3
3
0.87
336
79
81
2
1.72
232
0
3
3
0.58
224
0
1
1
0.5
162
26
30
4
1.16
288
188
189
1
2.22
2070
282
284
2
0.9
71
0
7
7
0.75
1349
24
28
4
1.1
66
0
8
8
1.4
1239
0
9
9
0.83
917
52
53
1
1.09
52
112
113
1
0.7
1170
0
7
7
0.65
215
141
142
1
1.29
2350
174
178
4
1.58
680
ASX: BM1
ballardmining.com.au
11
Hole ID
DFS017
From
and
and
and
DFS019
and
DFS020
DFS021
DFS022
and
and
and
and
DFS023
and
and
DFS024
and
and
and
and
and
and
DFS025
and
and
and
DFS026
and
and
DFS028
and
and
DFS029
DFS030
and
and
and
DFS031
and
and
and
and
0
166
268
289
0
26
0
0
0
55
99
104
141
2
109
189
0
84
97
124
165
199
253
0
144
152
265
0
79
199
0
60
72
0
0
87
94
102
0
69
84
121
216
To
Length
6
167
269
290
7
27
8
8
8
56
101
105
142
8
112
191
8
85
98
125
169
203
254
6
148
154
266
6
80
200
9
61
73
9
9
89
97
103
8
70
88
122
219
6
1
1
1
7
1
8
8
8
1
2
1
1
6
3
2
8
1
1
1
4
4
1
6
4
2
1
6
1
1
9
1
1
9
9
2
3
1
8
1
4
1
3
Au gpt
Cu ppm
0.63
312
1.4
711
1.12
387
1.39
4580
1.19
1339
1.01
69
1.06
1357
1.37
1018
1.39
823
0.97
216
1.27
591
1.09
572
3.37
1000
1.09
343
0.8
347
4.09
3130
0.92
223
0.63
686
1.02
204
1.06
280
0.75
105
3.22
2294
1.13
307
0.68
338
0.56
463
2.35
685
1.9
155
0.66
343
1.49
4240
0.59
25
1.28
882
0.54
145
1.16
452
1.07
1100
1.39
836
0.64
206
1.64
119
1.69
81
1.24
958
2.86
85
0.66
71
0.65
301
2.72
2753
ASX: BM1
ballardmining.com.au
12
Hole ID
DFS032
From
and
and
and
and
and
and
DFS034
and
and
DFS035
and
and
and
DFS036
DFS037
and
DFS038
and
and
DFS039
and
DFS040
and
and
and
and
DFS041
and
and
and
DFS042
and
and
and
and
and
and
DFS043
and
and
DFS044
and
3
83
89
130
147
175
233
0
125
158
0
184
284
293
0
0
118
0
68
108
0
120
0
60
95
112
139
0
52
70
122
0
44
84
87
91
105
144
0
83
88
0
72
To
Length
7
84
90
131
150
176
234
6
126
159
4
188
285
294
10
8
119
9
69
111
12
121
9
61
96
113
144
9
56
71
125
9
45
85
89
92
106
146
9
84
93
10
74
4
1
1
1
3
1
1
6
1
1
4
4
1
1
10
8
1
9
1
3
12
1
9
1
1
1
5
9
4
1
3
9
1
1
2
1
1
2
9
1
5
10
2
Au gpt
1
0.51
0.68
0.59
4.85
0.97
1.16
0.79
1.22
0.82
0.68
2.97
32.97
8.9
0.8
1.19
1.91
1.28
1.58
4.33
1
1.45
1.01
1.11
0.53
1.28
3.16
0.9
1.52
0.95
2.52
0.96
0.65
0.65
0.59
0.5
3.01
2.42
0.51
1.16
2.18
0.6
1.15
ASX: BM1
ballardmining.com.au
Cu ppm
186
1460
511
129
821
433
1140
260
60
186
476
93
22400
5100
859
1323
841
1159
968
2247
1017
3170
1271
1860
116
77
1325
850
98
1335
4180
1127
573
465
1176
514
87
761
173
2150
1074
458
680
13
Hole ID
and
DFS045
and
and
DFS046
and
DFS047
and
and
and
DFS048
DFS049
and
and
and
and
DFS050
and
and
and
DFS053
DFS053B
DFS056
DFS057
and
and
and
DFS057A
and
and
and
and
and
DFS058
DFS059
DFS060
and
DFS062
and
DFS063
and
DFS064
and
From
To
123
45
78
88
72
122
0
92
139
145
104
72
106
120
128
142
0
22
105
163
18
90
0
2
73
94
97
1
166
237
254
265
276
1
Length
126
47
79
90
73
123
5
93
142
147
112
74
107
122
131
143
2
24
106
166
19
91
1
4
74
95
98
4
169
243
255
266
277
3
3
2
1
2
1
1
5
1
3
2
8
2
1
2
3
1
2
2
1
3
1
1
1
2
1
1
1
3
3
6
1
1
1
2
0
124
49
160
182
211
48
122
1
128
52
162
186
212
51
123
1
4
3
2
4
1
3
1
Au gpt
Cu ppm
7.79
4947
0.81
905
0.5
318
2.5
1613
0.89
278
1.67
734
0.5
164
0.64
100
5.84
3048
1.16
1584
3.59
2326
1.52
1608
0.77
112
4.57
2828
1.57
4417
10.3
408
0.57
153
1.13
857
0.88
476
3.35
38700
0.8
229
1.79
980
0.5
155
0.56
174
0.63
174
0.92
781
1.24
268
0.65
168
1.6
1727
3.36
3156
0.53
545
3.26
266
0.66
1830
0.67
0.52
1.06
17.69
9.63
11.98
1.9
0.57
0.62
ASX: BM1
ballardmining.com.au
149
2469
1552
6050
3920
301
1061
403
14
Hole ID
and
DFS065
and
and
DFS066A
DFS066B
DFS088
DFS167
and
DFS168
and
DFS169
and
and
DFS170
DFS171
and
DFS172
and
DFS173
DFS174
DFS175
DFS176
DFS177
and
and
DFS179
and
DFS180
and
and
DFS181
and
DFS182
and
and
and
DFS183
DFS184
and
DFS185
and
DFS186
From
To
146
0
45
157
0
177
Length
150
1
47
159
1
178
4
1
2
2
1
1
1
27
0
38
0
12
44
1
1
38
3
19
30
50
0
30
26
47
58
17
42
19
31
62
46
58
0
69
89
104
31
4
50
27
43
67
9
30
8
40
8
13
45
4
9
40
4
24
34
52
8
37
27
48
59
19
43
26
35
63
49
59
1
70
90
105
32
6
51
32
44
71
8
3
8
2
8
1
1
3
8
2
1
5
4
2
8
7
1
1
1
2
1
7
4
1
3
1
1
1
1
1
1
2
1
5
1
4
Au gpt
Cu ppm
7.26
3810
0.54
155
1.99
2233
4.56
4385
0.71
0.89
793
0.64
2.42
0.8
4.77
0.69
0.75
0.53
1.27
0.51
3.42
0.61
2.49
0.86
0.88
4.03
1.16
0.84
0.92
4.9
1.02
5.04
1.55
5.93
1.33
1.33
1.08
0.5
0.73
3.73
2.7
0.61
2.25
1.11
0.68
1.07
2.1
ASX: BM1
ballardmining.com.au
357
1452
931
2483
1072
79
517
437
170
786
277
1460
705
3148
637
1276
473
511
1580
1046
694
1536
2329
4400
1801
1785
149
35
72
5560
891
3105
1695
1275
70
2574
15
Hole ID
From
and
DFS187
and
DFS188
and
and
DFS189
DFS399
DFS422
DFS422A
Length
Au gpt
Cu ppm
1.93
1195
6.16
0.7
2.38
1.12
0.71
1.2
91
9
22
31
54
64
57
95
10
28
42
55
65
58
4
1
6
11
1
1
1
89
69
90
0
158
266
289
0
0
38
47
0
54
0
71
0
90
70
91
1
160
267
297
3
8
41
48
13
56
7
73
8
1
1
1
1
2
1
8
3
8
3
1
13
2
7
2
8
1.89
0.54
1.04
0.55
1.48
1.07
3.83
0.5
1.51
1.25
3.95
0.88
9.31
0.9
3.72
1.19
0
48
0
0
20
0
25
0
42
64
18.95
32.05
36.8
8
49
7
9
21
6
27
7
45
65
20
33.8
37.4
8
1
7
9
1
6
2
7
3
1
1.05
1.75
0.6
1.5
0.96
1.1
0.88
0.55
0.84
1.79
1.36
3.98
10.01
0.96
8.65
1.29
1303
256
177
1420
941
1296
87
161
107
178
145
138
96
154
146
142
100
155
1
4
4
1
1.3
0.52
0.63
0.66
97
90
102
69
nsi
and
DFS453
and
and
and
DFS464
DFS466
and
and
DFS467
and
DFS468
and
DFS469
DFS470
DFS471
and
DFS472
DFS473
and
DFS474
and
DFS475
and
FDEX005
JPEX001
KSRD013
KSRD015
KSRD016
KSRD017
To
and
and
nsi
and
ASX: BM1
ballardmining.com.au
180
1885
309
690
159
16
Hole ID
KSRD018
KSRD020
KSRD022
LNEX001
LNEX002
LNEX003
LNEX003A
and
and
nsi
nsi
nsi
From
To
237
240
238
241
Au gpt
Cu ppm
1
0.87
93
1
1.21
71
97
105
98
107
1
2
0.52
1.53
595
364
19
56
60
65
69
81
114
144
20
57
61
66
70
82
115
145
1
1
1
1
1
1
1
1
0.51
1.26
0.94
0.59
0.51
4.3
0.87
0.9
126
1405
577
209
690
90
151
347
84
24
85
28
1
4
1.72
1.4
317
378
73
78
5
0.88
128
and
nsi
nsi
and
and
and
LNEX004
LNEX005
LNEX006
LNEX007
SARD014
SARD019
SARD020
UNEX001
UNEX002
UNEX003
UNEX004
UNEX005
UNEX006
UNEX007
and
and
and
nsi
Length
nsi
nsi
nsi
nsi
nsi
nsi
nsi
nsi
nsi
Appendix B2: Recent Collar Information
Hole ID
DFS001
DFS002
DFS003
DFS003A
DFS004
DFS005
DFS006
DFS009
Depth
East
North
RL
Azi
Dip
95
253341 6778448
479
56.73
-60.59
116
253330 6778438
479
55.01
-60.09
12
253318 6778429
480
55
-60
141
253318.5 6778429
480
56.49
-60.49
162
253307 6778420
482
56.4
-61.21
180
253296 6778413
478
54.45
-60.36
267
253280 6778408
477
55.29
-60.48
120
253338 6778411
478.85
51.32
-56.29
ASX: BM1
ballardmining.com.au
17
Hole ID
DFS010
DFS011
DFS012
DFS013
DFS014
DFS016
DFS017
DFS019
DFS020
DFS021
DFS022
DFS023
DFS024
DFS025
DFS026
DFS028
DFS029
DFS030
DFS031
DFS032
DFS034
DFS035
DFS036
DFS037
DFS038
DFS039
DFS040
DFS041
DFS042
DFS043
DFS044
DFS045
DFS046
DFS047
DFS048
DFS049
DFS050
DFS053
DFS053A
DFS053B
DFS056
DFS056A
DFS056B
Depth
East
North
RL
Azi
Dip
116
253317.82 6778401
476
54.92
-59.98
294
253282.6 6778379
474.21
55.07
-62.61
102
253334 6778464
479
56.27
-60.12
114
253322 6778454
479
56.68
-60.24
138
253311 6778446
480
55.82
-60.81
276
253268.7 6778418
477.82
54.45
-61.47
294
253253.15 6778406
475.92
54.99
-60.87
84
253325 6778482
479
57.22
-61.11
107
253313 6778474
479
56.37
-60.53
135
253301 6778465
479
55.98
-61
158
253289 6778457
480
54.68
-60.47
246
253276.74 6778449
480.45
55.06
-60.97
258
253265.07 6778440
479.9
56.1
-60.21
294
253252.81 6778430
477.12
54.9
-60.84
222
253240.48 6778422
476.47
55.48
-60.89
95
253306 6778492
479
55.38
-60.9
126
253294 6778484
479
56.47
-59.77
144
253283 6778476
480
55.34
-60.25
234
253270.95 6778468
480.11
54.93
-61.09
252
253258.93 6778460
480.52
57.43
-61.16
252
253230.46 6778440
476.48
56.3
-61.3
312
253215 6778428
475
57.64
-61.03
126
253330 6778510
479
56.72
-60.46
150
253318 6778502
479
56.49
-60.61
114
253324.59 6778533 478.686
54.41
-61.51
140 253313.814 6778525 478.741
55.51
-60.59
164 253302.436 6778517 478.892
57.66
-61.09
134 253310.657 6778546 478.852
55.13
-60.8
164 253300.035 6778534
479.13
54.84
-60.69
106
253320.58 6778566
479.31
41.93
-60.88
140 253303.415 6778554 479.592
46.69
-58.64
98
253304.8 6778603
471.66
63.77
-58.98
132
253298.94 6778596
474.24
63.33
-62.39
160
253287.5 6778573
475.86
50.99
-59.97
138
253295 6778609
472
56.06
-59.74
145
253284 6778602
472
54.79
-59.94
180
253268 6778591
474
61.1
-62.6
120
253225.20 6778560 474.222
56.2
-60.19
64
253223.67 6778559 474.242
54.68
-61.86
120
253221.72 6778557 474.336
55.83
-61.58
150
253189.47 6778536 473.199
56.05
-60.45
30
253188.18 6778535
473
55.26
-60.1
60
253191.30 6778536 473.242
54.96
-57.36
ASX: BM1
ballardmining.com.au
18
Hole ID
DFS057
DFS057A
DFS058
DFS060
DFS062
DFS063
DFS064
DFS065
DFS066
DFS066A
DFS066B
DFS088
DFS167
DFS168
DFS169
DFS170
DFS171
DFS172
DFS173
DFS174
DFS175
DFS176
DFS177
DFS178
DFS179
DFS180
DFS181
DFS182
DFS183
DFS184
DFS185
DFS186
DFS187
DFS188
DFS189
DFS399
DFS422
DFS422A
DFS453
DFS463
DFS464
DFS466
DFS467
Depth
East
North
RL
Azi
Dip
144
253231.17 6778524
475.26
58.07
-60.05
283
253231.17 6778524
475.26
57.52
-61.57
54
253209.00 6778501
474
59.26
-60.33
135
253271 6778642
469
56.58
-60.14
192
253246 6778625
473
55.28
-59.43
216
253237 6778616
473
55.88
-60.37
174
253249 6778650
473
56.5
-60.18
168
253238 6778643
473
55.58
-59.43
7
253194 6778615
472
54.99
-60
54
253193 6778615
472
54.86
-59.49
199
253191.5 6778615
472
55.26
-61.52
50
253146 6778749
470
57.85
-61.57
45 253367.115 6778554 479.232
61.09
-51.24
54 253358.248 6778548
478.88
65.2
-57.04
54 253345.029 6778537 478.366
55.19
-60.21
32 253372.458 6778580 474.469
59.72
-79.3
58
253348.61 6778566
479.93
56.23
-61.08
33
253360.52 6778594 474.254
23.27
-66.79
33 253344.512 6778620 470.844
55.86
-60.71
48 253329.157 6778608 471.092
57.97
-59.57
24 253361.255 6778653 470.536
56.15
-60.24
52 253345.135 6778643 470.766
55.12
-60.61
73 253327.183 6778631 470.621
55.77
-60.31
28 253353.779 6778678 469.931
57.79
-60.3
54 253338.259 6778669
470.27
56.19
-60.04
79
253324.57 6778660
469.53
57
-60.97
99
253309.64 6778651
469.22
56.46
-60.26
114
253293.29 6778642
469.25
56.98
-60.49
32
253345.23 6778701
468.76
55.04
-61.04
60
253330.24 6778690
468.53
54.95
-59.77
84
253315.22 6778679
469.91
54.62
-60.6
111
253298.92 6778672
471.72
55.2
-60.13
31
253240 6778705
472
57.85
-60.03
78
253225 6778694
471
54.53
-60.07
90
253209 6778683
470
56.79
-60.86
180
253352.75 6778097
474.95
57.05
-60.69
102
253353.00 6778244
474
54.9
-59.9
144
253351.00 6778244
474
58.17
-59.43
312
253306.72 6778358
473.81
54.33
-60.5
34
253264 6778594
473
62.24
-58.67
60
253264.45 6778595
473
61.87
-59.36
59
253374 6778532
480
56.67
-60.73
79 253361.777 6778523 478.367
56.49
-60.01
ASX: BM1
ballardmining.com.au
19
Hole ID
DFS468
DFS469
DFS471
DFS472
DFS473
DFS474
DFS475
FDEX001
FDEX002
FDEX003
FDEX004
FDEX005
IDRD324
IDRD359
IDRD395
IDRD403
IDRD406
JPEX001
KSRD013
KSRD015
KSRD016
KSRD017
KSRD018
KSRD020
KSRD022
LNEX001
LNEX002
LNEX003
LNEX003A
LNEX004
LNEX005
LNEX006
LNEX007
SARD014
SARD019
SARD020
UNEX001
UNEX002
UNEX003
UNEX004
UNEX005
UNEX006
UNEX007
Depth
East
North
RL
Azi
Dip
100 253348.696 6778514 478.287
56.69
-59.55
39
253387 6778541
480
56.15
-60.09
60 253339.298 6778493
478.2
56.07
-60.57
45 253365.773 6778484
478.36
56.22
-60.31
72 253350.848 6778474 478.516
56.73
-60.30
36 253387.064 6778479 478.473
55.91
-60.02
56
253372.47 6778468 478.554
54.91
-60.83
78
252894 6777929
480
56.5
-59.96
78
252890 6777980
480
58.18
-59.76
126
252866 6777960
480
54.61
-58.93
66
252845 6778025
481
55.92
-60.11
120
252819 6778006
480
55.73
-59.77
336
253460 6778033
475
57.7
-58.77
659.6 253027.144 6778121 476.059
60.36
-56.68
369
252717.28 6778989 471.378
59.59
-63.9
411
252761.57 6778919 471.091
61.09
-59.2
138
252473 6779381
468
359.48
-54.3
93.3 251675.467 6779635
469.69
60.79
-60.9
193 259092.051 6783538 441.069
271.09
-59.65
157 259088.765 6783627 441.538
274.33
-59.91
228 259119.616 6783982 439.957
269.94
-59.77
247 259151.258 6783647 441.236
272.89
-60.2
236 259167.589 6783931 439.452
270.82
-57.69
72 259169.724 6783798 439.002
265.15
-56.01
287 259121.288 6783866 441.344
265.25
-56.51
138
250458 6782544
453
55.01
-60.16
168
250424 6782517
453
55.85
-60.06
36
250459 6782610
454
54.2
-60.76
132
250460 6782611
454
56.39
-59.49
240
250429 6782584
454
55.94
-60.7
114
250446 6782656
454
56.47
-60.43
180
250410 6782630
454
53.76
-59.74
150
250400 6782684
454
55.71
-60.57
66
259489.23 6773405 475.757
91.91
-55.8
138
259462.59 6773253 479.663
92.42
-54.18
258 259278.034 6773237 479.647
90.14
-55.27
114
254002 6777016
480
58.22
-59.81
162
253971 6776998
480
55.72
-60.37
114
253967 6777069
481
55.62
-60.78
180
253938.33 6777053
481
55.51
-60.33
114
254040 6776951
480
53.45
-60.22
169
254015 6776936
480
56.09
-59.64
138
254044 6776872
480
65.55
-54.14
ASX: BM1
ballardmining.com.au
20
Appendix B3: Recent Surface Sampling Information
Sample ID
MIR308
MIR309
MIR310
MIR311
MIR312
MIR313
MIR314
MIR317
MIR318
MIR319
MIR320
MIR321
MIR322
MIR324
MIR327
MIR328
MIR329
MIR330
MIR331
MIR332
MIR333
MIR334
MIR335
MIR336
MIR337
MIR338
MIR339
MIR340
MIR341
MIR342
MIR343
MIR344
MIR345
MIR346
MIR347
MIR348
MIR349
MIR350
MIR351
MIR352
MIR353
Sample Type
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKCHIP
ROCKC
Share your feedback
Discover